Loading...
HomeMy WebLinkAboutReso 95-135 - Approve entering into contract No 94-SAO-00047 for Funding of Maintenance work Shasta Powerplant a • . . ... � • � , � RESOLUTION NO. 9 5- �.35 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING ENTERING INTO CONTRACT NO. 94-SAO-00047 FOR FUNDING OF MAINTF�TANCE WORR AT THE SHASTA P0�1'ERPLANT, BY AND BETWEEN THE. FOLLOWING PARTIES: UNITED STATSS DEPARZ�N'T OF ENERGY WESTERN AREA POWER �,DMINISTRATION CENTRAL VALLEY PROJECT, CALIFORNIA hereinafter called Western and UNITED STATES D�ARTI�NT OF INTERIOR BUREAU �F RECLAMATION CF�R1►T• VALLEY PROJECT, CALIFORNIA hereinafter called Reclamation and CITY OF ALAMEDA CITY OF BIGGS CITY OF GRIDLEY CITY OF HEALDSBURG CITY OF LODI CITY OF LOMPOC NORTHERN CALIFORNIA POWER AGENCY .CITY OF PALO ALTO PLUMAS-SIERR�► RURAL ELECTRIC COOFKRATIVS, INC. CITY OF REDDING CITY OF ROSEVIr.r.F CITY OF SANTA CLP,RA � SACRAMENTO MUNICIPAL UTILITY DISTRICT SAN FRANCISCO BAY AREA 12APID TRANSIT DISTRICT TURLOCR IRRIGATION DISTRIGT CITY OF UKIAH hereinafter called Cu.stomers WHERF.AS, the Shasta Dam and Powerplant (Shasta) and the ���\ associated electrical power generating facilities are features of v the Shasta Division, Central Valley Project; and �� ` l WHEREAS, Reclamation is responsible for, among other things, (�� planning, designing, constructing, operating, and maintaining the U� electrical power-generating facilities at Shasta; and � : � � � � � WHEREAS, Western is responsible for marketing the power produced at Shasta which is nat required for Central Valley Project use; and Wf�REAS, Shasta contains five main generating units, having a combined generating capacity of 578 Megawatts; and WHEREAS, due to age, normal wear, and deterioration, the stator windings for generating units 3 , 4, and 5 at Shasta should be replaced, and certain other maintenance work should be performed to improve reliability and increase operational flexibility; and WHEREAS, the Customers have offered to enter into a contributed-funds contract to fund the Shasta rewind project; and WHEREAS, Reclamation, under the terms of proposed Cantract No. 94-SAO-00047, a copy of which is attached hereto and made a part hereof, has agreed to undertake and complete the Shasta rewind project as set forth in said contract; and WHEREAS, the Customers that advance the necessary funds for Reclamatian to perform the work will ha�e the right of first refusal to purchase the excess capacity—and be repaid the funds. advanced, with interest, through credits on power bills�s defined and set forth in the contract; and WHEREAS, funding by the City for its l0o share or $2,117 ,500 will come from, and the credits returned to, the Electric Utility reserves; NOW, THEREFORE, IT IS HEREBY RESOLVED that the City Council hereby approves entering into the attached Contract for Funding of Maintenance Work at Shasta Powerplant; that the Mayor is authorized to sign said contract on behalf of the City; and the City Clerk is directed to attest the signature of the Mayor and to impress the official seal of the City of Redding thereto. I HEREBY CERTIFY that the foreqoing Resolution approving Contract No. 94-SAO-00047 was introduced, read, and adapted at a 2 • � � • regular meeting of the City Council on the 6th day of June , 1995 , by the following vote: AYES: COUNCIL MEMBERS: P. Anderson, R. Anderson, McGeorge, Murray and Kehoe NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None � DAVID A. OE, May City Redding R'IT'EST: �� � CO�VX�TIE STi�QffiKAYER City Clerk FORM APP . ' � � � ��i�� � . W. LEONARD WIN , City Attorney 3 - • � Contract No. 94-SAO-00047 UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT, CALIFORNIA AND UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION CENTRAL VALLEY PROJECT, CALIFORNIA CONTRACT FOR FUNDING OF MAINTENANCE WORK AT SHASTA POWERPLANT WITH CITY OF ALAMEDA CITY OF BIGGS CITY OF GRIDLEY CITY OF HEALDSBURG CITY OF LODI CITY OF LOMPOC NORTHERN CALIFORNIA POWER AGENCY CITY OF PALO ALTO PLUMAS-SIERR.A RURAL ELECTRIC COOPERATIVE, INC. CITY OF REDDING CITY OF ROSEVILLE CITY OF SANTA CLARA SACRAMENTO MUNICIPAL UTILITY DISTRICT SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT TURLOCK IRRIGATION DISTRICT CITY OF UKIAH . , � � � Contract No. 94-SAO-00047 UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT, CALIFORNIA AND UNITED STATES DEPARTMENT OF INTERIOR BUREAU OF RECLAMATION CENTRAL VALLEY PROJECT, CALIFORNIA CONTRACT FOR FUNDING OF MAINTENANCE WORK AT SHASTA POWERPLANT WITH CITY OF ALAMEDA CITY OF BIGGS CITY OF GRIDLEY CITY OF HEALDSBURG CITY OF LODI CITY OF LOMPOC NORTHERN CALIFORNIA POWER AGENCY CITY OF PALO ALTO PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, INC. CITY OF REDDING CITY OF ROSEVILLE CITY OF SANTA CLARA SACRAMENTO MUNICIPAL UTILITY DISTRICT SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT TURLOCK IRRIGATION DISTRICT CITY OF UKIAH Tahle �f('on .ntc S i�n �� 1. PREAMBLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. EXPLANATORY RECITALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 3. AGREEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 4. TERM OF CONTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 5. DEFINITION OF TERMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 6. WORK TO BE PERFORMED FOR SHASTA . . . . . . . . . . . . . . . . . . . . . . . . 4 7. FUNDING FOR WORK AT SHASTA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 8. REPAYMENT AND ACCOUNTING FOR CONTRIBUTED FUNDS . . . . . . . 11 9. UPRATED CAPACITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10. RATES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 11. AUDIT AND OVERSIGHT RIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 ; - 12. SUCCESSORS AND A•5'SIGNS . . . . . . . . . . . . . . . . . . .•, , , , . . . . . . . 16 13. ENFORCEABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 14. PERFORMANCE OBLIGATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 15. DEFAULT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 16. SEVERABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 17. GENERAL POWER CONTRACT PROVISIONS . . . . . . . . . . . . . . . . . . . . 17 18. ATTACHMENTS AND EXHIBITS MADE PART OF CONTRACT . . . . . . . . 17 19. RELATIONSHIP OF PARTIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 20. OWNERSHIP RIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 21. CUSTOMER LIABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 22. EXECUTION IN COUNTERPART . . . . . . . . . . . . . . . . . . . . o . . . . . . . . 18 RESOLUTIONS GENERAL POWER CONTRACT PROVISIONS (JANUARY 3, 1989) EXHIBIT A (ESTIMATED FUNDING SCHEDULE) EXHIBIT B (REPAYMENT SCHEDULE) EXHIBIT C (SHASTA REWIND INCREMENTAL INCREASE IN CAPACITY) ATTACHMENT 1 (ESCROW AGREEMENT) ;; � � � 1 � Contract No. 94-SAO-00047 2 I 3 UNITED STATES DEPARTMENT OF ENERGY 4 WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT 5 AND UNITED STATES 6 DEPARTMENT OF INTERIOR BUREAU OF RECLAMATION 7 CENTRAL VALLEY PROJECT, CALIFORNIA 8 CONTRACT FOR FUNDING OF MAINTENANCE WORK AT SHASTA POWERPLANT 9 WITH 10 CITY OF ALAMEDA CITY OF BIGGS 11 CITY OF GRIDLEY CITY OF HEALDSBURG 12 CITY OF LODI CITY OF LOMPOC 13 NORTHERN CALIFORNIA POWER AGENCY CITY OF PALO ALTO 14 PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, INC. CITY OF REDDING 15 CITY OF ROSEVILLE CITY OF SANTA CLARA 16 SACRAMENTO MUNICIPAL UTILITY DISTRICT SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT 17 TURLOCK IRRIGATION DISTRICT CITY OF UKIAH 18 19 20 1. PRF.AMBT.F.: This Contract is made this day of , 1995, 21 pursuant to the Acts of Congress approved June 17, 1902 (32 Stat. 388); August 26, 1937 22 (50 Stat. 844); August 4, 1939 (53 Stat. 1187); and August 4, 1977 (91 Stat. 565); and Acts 23 amendatory or supplementary to the foregoing Acts; between the UNITED STATES OF 24 AMERICA (United States), (i) acting by and through the Administrator, Western Area Power 25 Administration, Department of Energy, hereinafter called Western, represented by the officer 26 executing this Contract, or a duly appointed successor, hereinafter called the Contracting 27 Officer, and (ii) acting by and through the Commissioner, Bureau of Reclamation, Department 28 of the Interior, hereinafter called Reclamation, represented by the Regional Director, Mid- 1 � � � 1 Pacific Region; and the CITIES OF ALAMEDA, BIGGS, GRIDLEY, HEALDSBURG, 2 LODI, LOMPOC, PALO ALTO, REDDING, ROSEVILLE, SANTA CLARA, and UKIAH; 3 the NORTHERN CALIFORNIA POWER AGENCY; the SACRAMENTO MUNICIPAL 4 UTILITY DISTRICT (SMUD); the SAN FRANCISCO BAY AREA RAPID TRANSIT 5 DISTRICT (BART), a rapid transit district established pursuant to California Public Utility 6 Code Section 28500 et. seq.; the TURLOCK IRRIGATION DISTRICT (TID); and the 7 PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE, all organized and existing under 8 the laws of the State of California, hereinafter called the Customers; and all collectively called 9 the Parties. 10 11 2. F,XPi.ANATnRY RF.('ITAi �; 12 2.1 Shasta Dam and Powerplant (Shasta) and the associated electrical power 13 generating facilities are features of the Shasta Division, Central Valley Project (CVP). 14 15 2.2 Reclamation is responsible, among other things, for planning, designing, 16 constructing, operating, and maintaining the electrical power generating facilities at 17 Shasta. 18 19 2.3 Western is responsible for marketing the power produced at Shasta which is not 20 required for CVP project use. 21 22 2.4 Shasta contains five (5) main generating units having a combined generating 23 capacity of 578 Megawatts (MW). 24 25 2.5 Due to age, normal wear, and deterioration, the stator windings for generating 26 units 3, 4, and 5 at Shasta should be replaced, and certain other maintenance work 27 should be performed to improve reliabiliry and increase operational flexibility. 28 z ' � • 1 2.6 The Customers have offered to enter into a contributed funds agreement to fund 2 the Shasta rewind project and Reclamation, under the terms of this Contract, has agreed 3 to undertake and complete the Shasta rewind project, which includes replacement of the 4 stator windings for generating units 3, 4, and 5 with increased capacity windings, 5 installation of new thrust bearings and high pressure lubrication systems for such 6 bearings, excitation systems, and performance of other work, as generally set forth in 7 Section 6 hereof, necessary to restore the generating units at Shasta to good operating 8 condition. 9 10 2.7 The Customers, that will advance the necessary funds for Reclamation to 11 perform the work required by this Contract, will have the right of first refusal to 12 purchase the excess capacity as defined herein, and will be repaid the funds advanced, 13 with interest, through credits on power bills as described herein. Pursuant to 14 43 U.S.C. §§ 395, 397a, the funds received from the Customers shall be available for 15 expenditure for the specific purpose for which contributed as set forth in Section 6 in a 16 like manner as if said sums had been specifically appropriated for said purposes. 17 18 3. AGRF.F.MF.NT; 19 The Parties agree to the terms and conditions set forth herein. 20 21 4. TERM nF C'ONTRA('T; 22 This Contract shall become effective on , 1995, and shall remain in effect 23 until midnight of December 31, 2004. 24 25 5. DEFiNITInN nF TFRM�; 26 As used herein, the following terms have the following meanings when used with initial 27 capitalization, whether singular or plural: 28 3 - � • 1 5.1 Cash .all: A request for funds sent to each Customer from time to time by 2 the Project Treasurer. 3I 4 5.2 Cust�mer: A Party to this Contract that provides funds for the work to be 5 performed by Reclamation under this Contract. 6 7 5.3 F.scrow A . o �n : An interest bearing account established by the Project 8 Treasurer at a Federally insured bank for the purpose of holding the Customers' funds 9 until all disbursements are made to Reclamation and the work set forth in this Contract 10 is complete. 11 12 5.4 ��ect Trea� �rer• The entity selected by the Customers to establish the 13 Escrow Account, issue the Cash Calls, and perform other financial duties as may be 14 required for the work performed under this Contract. 15 16 6. WnRK Tn R . P .RFnRMFn FnR THF SHASTA RFW� PRnTF(�T; 17 Reclamation shall be solely responsible for the following work for the Shasta rewind project: 18 19 6.1 Prepare specifications of the work to be performed for the Shasta rewind 20 project. 21 22 6.2 Award and administer contract(s) for the work for the Shasta rewind project in 23 accordance with Federal acquisition regulations. Said contract(s) shall require the 24 entity to whom the contract(s) is awarded to perform at least the following 25 requirements: 26 27 6.2.1 Submittal to Reclamation of drawings and technical data for all 28 equipment to be furnished and installed; 4 , � � • 1 6.2.2 Submittal to Reclamation of design data, test reports, calibration ; 2 certificates, certified inspection reports, payment information, and labor 3 standards data as required in the specifications; 4 5 6.2.3 Furnishing of all necessary material, equipment, and labor for the 6 replacement of the stator core, stator winding, ring bus, protective relays and 7 associated equipment, flow meters, excitation systems, main generator lead 8 flexible connectors between the generator main leads and the existing segregated 9 phase bus structure, and high-pressure type lubricated thrust bearings for 10 generating units 3, 4, and 5; 11 12 6.2.4 Replacement of or reinsulating the generator main field windings; and 13 14 b.2.5 Furnishing of a new thrust bearing for unit 2 and new core iron for 15 unit 1. 16 17 6.3 Review and determine responsiveness of bids. 18 19 6.4 Review all bids submitted for compliance with specifications. 20 21 6.5 Inspect manufacturers facilities and monitor production and testing. 22 23 6.6 Witness testing at manufacturers facilities as required. 24 25 6.7 Review value engineering proposals, and approve as deemed appropriate. 26 27 6.8 Inspect installation of equipment. 28 5 � • • 1 6.9 Witness acceptance testing of equipment. 2 3 6.10 Review acceptance test results and approve as necessary. 4 5 6.11 Witness inspections. 6 7 6.12 Disassemble the units in preparation for the removal of the existing stator 8 winding, installation of a new stator winding, and other work needed on the units. 9 10 6.13 Reassemble the units after completion of the work on the units. 11 12 6.14 Prepare quarterly progress reports and other documentation required by this 13 Contract and distribute to each Customer. 14 15 7. F[TNDiN('7 FnR WnRK AT SHASTA; 16 The Customers have appointed the Northern California Power Agency (NCPA) as the Project 17 Treasurer and NCPA has accepted such appointment. 18 19 7.1 The Project Treasurer shall establish the Escrow Account, deposit each 20 Customer's funds in the Escrow Account, and issue Cash Calls sufficient to maintain an 21 adequate balance in the Escrow Account during the term of this Contract to fund the 22 work generally described in Section 6 hereof. The estimated funding schedule, as 23 developed by Reclamation, for deposits to, and withdrawals by Reclamation from, the 24 Escrow Account is shown in Elchibit A, attached hereto and made a part hereof. 25 Reclamation shall not award the contract(s) associated with the work set forth in 26 subsection 6.2 hereof without agreement of all Parties if the selected bid exceeds the 27 value shown in the estimated funding schedule set forth in Exhibit A. 28 6 - � e 1 7.2 The Project Treasurer also shall establish on its books of accounts, subaccounts 2 identified for each Customer that will show deposits to, and withdrawals from, each 3 subaccount, and interest accrued on funds in each subaccount. The Project Treasurer 4 shall issue Cash Calls when necessary to maintain an adequate balance in the Escrow 5 Account as provided in this Section 7. 6 7 7.3 Reclamation, in its best efforts to minimize the time between the deposit of 8 funds into and the withdrawal of those funds from the Escrow Account, will coordinate 9 with the Project Treasurer the timing of the deposits and withdrawals from the Escrow 10 Account. The Project Treasurer will coordinate such timing with the Customers. As 11 soon as practicable after Reclamation awards the initial contract for the work to be 12 performed under this Contract, Exhibit A will be revised to reflect the contract award. 13 Unless otherwise agreed by all Parties, the maximum amount to be funded by the 14 Customers under this Contract as shown in Exhibit A shall not be increased in 15 subsequent revisions to Exhibit A, unless the contract(s) awarded by Reclamation for 16 the work set forth in subsection 6.2 hereof is terminated by agreement of all Parties. 17 18 7.4 Funds advanced by the Customers shall only be used by Reclamation for the 19 work generally described in Section 6 hereof. The Parties expect that the Customers' 20 funding will be adequate to complete the work as generally set forth in this Contract. 21 Any additional costs incurred by Reclamation that are in addition to those costs funded 22 by advances from the Customers for the activities associated with the work performed 23 under this Contract shall be funded through existing or new appropriations by 24 Congress. 25 26 7.5 Upon agreement of all Customers, the Customers may request that Reclamation 27 terminate the work remaining to be performed under this Contract for any reason. In 28 the event the work is to be terminated, the Customers shall be responsible for the cost � . � � � 1 of termination pursuant to Section 7 hereof. Reclamation shall furnish a list of 2 activities in progress, activities outstanding, costs associated with terminating the 3 contracts with other contractors, and the estimate of time for finalizing the termination. 4 Upon agreement by all Customers, Reclamation shall commence the termination 5 process. 6 7 7.6 Reclamation will provide Western with the termination schedule and costs, and 8 updates for revision of Exhibit A. Reclamation will use its best efforts to provide as 9 much advance notice as possible of the funds needed to terminate work. Upon 10 completion of all termination work and payment of all obligations for work performed 11 under this Contract, any funds remaining in the Escrow Account will be returned to the 12 Customers. 13 14 7.7 The Escrow Account shall be established by the Project Treasurer in a financial 15 institution that is a commercial bank or trust company or national banking association 16 doing business and having its principal office in New York, New York; Chicago, 17 Illinois; Los Angeles, California; or San Francisco, California; and having capital stock 18 and surplus aggregating at least fifty million dollars ($50,000,000), if such a 19 commercial bank or trust company or national banking association is willing and able to 20 accept the Escrow Account on reasonable and customary terms. 21 22 7.8 At least thirty (30) days, but not more than forty-five (45) days, prior to each 23 Funding Date shown in Exhibit A hereof, the Project Treasurer shall issue a Cash Call 24 to each Customer. The Cash Calls issued to each Customer shall equal the product of 25 the Customer's percentage shown in Exhibit B and the amount of the funds required for 26 such date as shown in Exhibit A, plus any costs associated with establishing and 27 maintaining the Escrow Account as charged by the financial institution, plus accounting 28 and money management costs of seven hundred twenty dollars ($720.00) per year and a . � � 1 accounting costs of three hundred fifty dollars ($350.00) per Cash Call, minus any 2 interest earned by each Customer since the last Cash Call. 3 4 7.9 Each Customer shall remit the amount of each Cash Call to the Project 5 Treasurer within twenty (20) days of receipt of such Cash Call. 6 7 7.10 Any and all funds received by the Project Treasurer shall be accounted for in 8 each Customer's subaccount, and shall be deposited into the Escrow Account as soon as 9 possible, but in no event later than three (3) business days following receipt thereof. 10 11 7.11 Prior to October 1 of each year until the work generally described in Section 6 12 hereof is complete, Reclamation shall advise Western arid the Project Treasurer of any 13 necessary changes in the timing of funds needed through the end of the period required 14 for the completion of the work, and shall submit such updated information to the 15 Project Treasurer and Western. If accelerated funding is necessary during any year, a 16 statement of the reasons prompting the accelerated funding and the amount and 17 schedule of the funding needed shall be submitted by Reclamation to the Project 18 Treasurer and Western, Western shall revise the funding schedule in Exhibit A as 19 necessary and provide the Project Treasurer and each Customer, such revised 20 Exhibit A. The Project Treasurer shall issue a Cash Call to each Customer as provided 21 in subsection 7.8 hereof. 22 23 7.12 Any Customer not making the required payments when due pursuant to this 24 Section 7 will be issued a late notice by the Project Treasurer. The Project Treasurer 25 will also send a copy of such late notice to each other Party. Such Customer shall have 26 ten (10) days from the issuance of the late notice in which to make the payment 27 invoiced in the Cash Call for which payment is late. If the late payment is not made by 28 the eleventh (llth) day, a notice of default declaring the termination of participation in 9 � � - 1 this Contract shall be sent to the defaulting Customer by the Project Treasurer with 2 copies to all Parties within forty-five (45) days, but no earlier than eleven (11) days, 3 after the original due date of a payment that is not made. A revised customer 4 percentage table shall be prepared by the Project Treasurer and sent to Western. A 5 revised Exhibit B shall be prepared by Western and shall be sent to each Party. The 6 defaulting Customer shall forfeit its right of first refusal to excess capacity pursuant to 7 Section 9 hereof; P�vid�d, That such Customer shall retain its right to repayment by � 8 Western of its contribution prior to default, with interest, pursuant to subsection 7.13 9 and 8 hereof. The Project Treasurer shall allocate the amount of the payment due to 10 the remaining Customers based on their percentage share. The maximum increase of 11 each Customer's payment for the term of this Contract shall not exceed twenty-five 12 percent (25%) of such customer's original percentage share. The Project Treasurer 13 shall issue a supplemental Cash Call to each remaining Customer for the amount in 14 arrears. Each Customer shall make the payment required by the supplemental Cash 15 Call to the Project Treasurer within ten (10) days of receipt of the supplemental Cash 16 Call. If the supplemental Cash Call does not provide the required funds due to the 17 limitation on payment increases described herein, the Project Treasurer shall discuss the 18 action to be taken with the Parties as soon as practicable after the insufficiency of the 19 supplemental Cash Call is known. 20 21 7.13 Any defaulting Customer shall be held liable for ten percent (10%) of its 22 remaining obligation based on its original percentage share of the total cost as indicated 23 in Exhibit B attached hereto, and adjustments for such amounts shall be reflected in 24 revisions to Exhibit B. 25 26 7.14 Upon completion of all work generally described in Section 6, and payment by 27 Reclamation of any outstanding obligations, Reclamation shall notify the Project 28 Treasurer of such and request the Escrow Account be closed. The Project Treasurer io , � � 1 shall then notify the financial institution that the Escrow Account is being closed and 2 return to each Customer any funds remaining in that Customer's subaccount. 3 4 8. RF.PAYMF.NT ANn A O JNTIN(: FnR ('nNTRiR TTFn FiTI\T�S: S Customers will be reimbursed for funds withdrawn from the Escrow Account by Reclamation 6 pursuant to Section 7, with appropriate interest as provided for in subsection 8.3, through 7 credits by Western on each Customer's CVP power bills. Reclamation will allocate the 8 appropriate share of the total repayment cost, including the cost of funding, for any generator 9 rewound pursuant to this Contract to the appropriate CVP water users for repayment in 10 accordance with the CVP cost allocation methodology. 11 12 8.1 The Project Treasurer shall provide a copy of all Cash Calls to Western and 13 Reclamation showing the total amount of the Cash Call, and the amounts invoiced to 14 each Customer. The Project Treasurer shall also provide to Western the amount and 15 date of any withdrawals by Reclamation from the Escrow Account and all costs 16 incurred in establishing and maintaining the Escrow Account that are paid by the 17 Customers. 18 19 8.2 Beginning the first full month following notification by the Project Treasurer of 20 Reclamation's withdrawal from the Escrow Account, Western shall apply bill credits to 21 each Customer's CVP power bill for the Customer's percentage share of the amount 22 withdrawn plus interest and associated costs in the manner described as follows: 23 24 8.2.1 Western shall determine the appropriate amount of interest to be added 25 to the amount of funds withdrawn by Reclamation pursuant to notification by 26 the Project Treasurer as set forth in subsection 8.1 hereof. Interest shall be 27 computed using the annual interest rate determined by Western in accordance 28 with subsection 8.3 hereof. >> . � � 1 8.2.2 Western shall multiply the percentages from the then-current Exhibit B 2 corresponding to each Customer to the sum of: i) each withdrawal by 3 Reclamation from the Escrow Account, ii) interest calculated in Paragraph 8.2.1 4 hereof; and iii) all costs incurred in establishing and maintaining the Escrow 5 Account. Such amount shall be applied as a bill credit to the respective 6 Customers on their power bills; PsaSti�d That, Western shall not pay any costs, 7 including interest, to the Customers greater than those costs that would have 8 been incurred for the work generally described herein if said sums had been 9 specifically appropriated for said purposes. 10 11 8.2.3 Western shall apply the amounts calculated pursuant to 12 Paragraph 8.2.2 as a credit on each Customer's power bill; Pr�cidesl That, 13 Western shall not apply a credit amount greater than the amount owed to 14 Western in any month. If the amount owed Western is less than the credit due 15 the customer in any month, Western shall carryover the credit due each month 16 until any balance is reduced to zero. Interest shall be computed on the amount 17 due the Customer using the annual interest rate determined by Western in 18 accordance with subsection 8.3 hereof. 19 20 8.3 Interest on funds withdrawn from the Escrow Account shall be computed at a 21 rate that shall be at the average rate for Treasury Securities of 15 years maturity or 22 more, as used in Western's power repayment study, prorated for the number of days 23 from the date of Reclamation's withdrawal from the Escrow Account to the date of the 24 credit on the Customer's power bill. No interest shall be applied to the costs incurred 25 in establishing and maintaining the Escrow Account. 26 27 8.4 As necessary, Western shall suspend all other bill crediting programs and 28 amounts determined by Western to be owed to the Customers while the credits iz . . � � 1 hereunder are applied. Should Western owe a Customer multiple credits, the credit 2 under this Contract shall be applied first until such credit has been fully satisfied. 3 Unless contractually provided, interest shall not accrue on any other bill crediting 4 program balance. Western will resume other bill crediting programs as soon as 5 practicable after the total amount advanced by the Customers and withdrawn from the 6 Escrow Account by Reclamation has been credited on the appropriate Customers' CVP 7 power bills. 8 9 9. BIGHT Tn F,X�F,�4 C'APAf TTV; 10 Reclamation has determined that rewinding and increasing the nameplate ratings of Shasta 11 units 3, 4, and 5 up to 125 MW each is expected to result in a total increase of approximately 12 47 MW in the capaciry available at Shasta Powerplant when the storage in Shasta Lake exceeds 13 3.6 million acre feet (MAF). As requested by the Customers, Reclamation will increase the 14 electrical capacity of the units to 142 MVA as part of the work generally described in Section 15 6 hereof. The additional electrical capacity above 125 MW is expected to be utilized when the 16 turbines are replaced. Upon completion of the work generally described in Section 6 hereof, 17 Reclamation shall notify Western of the amount of additional capacity available from Shasta. 18 Reclamation shall provide Western with the revised Shasta Powerplant capacity available as a 19 function of Shasta Lake water storage and reservoir elevations. Western shall use this 20 information to update Exhibit C attached hereto which shows the incremental increase in 21 Shasta capacity at certain Shasta Lake water storage and reservoir elevations. After 22 completion of the work as generally provided under this Contract and for the term of this 23 Contract, the Customers will be given a right of first refusal for purchase of excess capacity up 24 to 47 MW from the CVP in accordance with this Section 9. 25 26 9.1 If and when Western determines excess capacity is available for sale from the 27 CVP (system wide), Western shall issue a notice of availability of excess capacity to all 28 CVP power customers. The determination of the availability of excess capacity and 13 . � � 1 terms of the offer will be made by Western at the time of the offer and shall apply to 2 all excess capacity sales. Western is under no obligation as a result of this Contract to 3 � declare excess capacity available. The Customers must meet the marketing criteria set 4 forth by Western for the excess capacity sale, including any transmission requirements. 5 Excess capacity sold to any Party pursuant to this Contract will be scheduled in 6 accordance with the appropriate scheduling arrangements. 7 8 9.2 If Shasta Lake storage level is forecasted by Reclamation to exceed 3.0 MAF 9 during the time of the availability of excess capacity, each Customer shall have the 10 right of first refusal to purchase, on a seasonal basis, its pro rata share, as specified in 11 Exhibit B, of the excess capacity up to the amount specified in E�chibit C. If the 12 Customer does not exercise its right of first refusal for seasonal excess capacity within 13 the time-frame and under the terms offered by Western, Western may sell the seasonal 14 excess capacity to any eligible purchaser under the same terms and conditions. If 15 Western does not market all of the available excess capacity on a seasonal basis, 16 Western may offer excess capaciry on a monthly basis. Each Customer shall have the 17 right of first refusal to purchase its pro rata share of the monthly excess capacity 18 corresponding to the water storage levels specified in Exhibit C. 19 20 10. BATE�: 21 The Customer shall pay for the excess capacity purchased as a result of the right of first refusal 22 pursuant to Section 9 hereof, in accordance with the rates, charges, and conditions set forth in 23 Western's notice of availability for excess capacity. The rates and other terms under which 24 such excess capacity will be offered shall be consistent with Western marketing plans and rate 25 setting guidelines. 26 27 28 14 , � � 1 11. A[7DIT ANn n .RSi(THT Ri(:HTS: 2 11.1 Prior to January 1 of each year until the work set forth herein is complete, 3 Reclamation shall provide to the Parties an accounting of the funds expended for the 4 work generally described in Section 6 hereof. If requested by the Project Treasurer, 5 Reclamation will provide documentation showing the payments made to each 6 contractor, a description of the work performed by each contractor, and any balance to 7 complete the work for each contractor. Reclamation also shall give an accounting of 8 funds expended for work done by Reclamation, a description of the work performed by 9 Reclamation, and the balance to complete the work required to be performed by 10 Reclamation. Copies of these accountings shall be distributed to each Customer by the 11 Project Treasurer. 12 13 11.2 A Party, in its exercise of appropriate financial controls, may request the 14 Project Treasurer to cause an audit to be conducted of the costs of the work set forth in 15 Section 6 of this Contract. Such audits shall not be conducted more often than every 16 two (2) years. Such audit may examine records which relate to work associated with 17 this Contract including, but not limited to, the financial and contract records of the 18 Project Treasurer, Western, and Reclamation. The costs, including reasonable costs 19 incuned by the Project Treasurer, Western, and/or Reclamation in the performance of 20 the audit, shall be paid by the Party(ies) requesting the audit. 21 22 11.3 A Party shall be afforded the opportunity to obtain information concerning work 23 performed under this Contract through reasonable requests to Reclamation. If the 24 amount of information desired becomes excessive, as determined by Reclamation, 25 Reclamation shall inform the requesting Customer(s) of same, and shall make 26 arrangements to provide the information requested at the sole expense of the requesting 27 Party(ies). 28 15 : � • 1 12. SUC('F.SSnR� A11Ti) ASSi(7NS: 2 This Contract shall inure to the benefit of and be binding upon the Parties hereto and their 3 res ective successors. No Pa P rty shall assign its interest in this Contract, in whole or in part, 4 without the prior written consent of the other Parties. In no event shall any Party assign this 5 Contract to any Party that is not financially responsible or which cannot perform its obligations 6 pursuant to this Contract, nor shall any Party assign this Contract on any terms at variance 7 from those set forth in this Contract. No permitted assignment or transfer shall change the 8 duties of the Parties, or impair the chances of obtaining performance under this Contract 9 except to the extent set forth in such permitted assignment and approved in writing by the 10 Parties. No Party shall assign its rights of first refusal to excess capacity under this Contract. 11 12 13. ENFnRC'F.ARII iTY: 13 It is not the intent of the Parties that this Contract convey any rights to third parties to enforce 14 the provisions of the Contract. This Contract can only be enforced by the Parties or their 15 successors. 16 17 14. PF.RFnRMAN('.F nRI i('tATiONS; 18 Reclamation shall use its utmost efforts and shall diligently endeavor to complete the work 19 described in Section 6 by the date(s) set forth in Exhibit A. Reclamation will not be obligated 20 to complete such work if the maximum funding set forth in Exhibit A is not advanced by the 21 Customers. 22 23 15. D .FF _Ai Ti.T: 24 The failure of any Party to perform any of its respective obligations under this Contract shall 25 constitute a default under this Contract; PrQvided, That the Party against whom the default is 26 asserted shall not be deemed in default if it cures the asserted default by rendering the 27 28 16 . ' . . � • 1 necessary performance within ten (10) days following written notice from any other Party, 2 which notice shall set forth the acts and omissions which constitute the asserted default. 3 4 16. SF.VF.RARIIITY: 5 If any clause, sentence, paragraph, or part of this Contract should for any reason be finally 6 adjudged by any court of competent jurisdiction to be unconstitutional or invalid, such 7 judgment shall not affect, impair or invalidate the remainder of this Contract but shall be 8 confined in its operation to the clause, sentence, paragraph, or part thereof directly involved in 9 the controversy in which the judgment is rendered. If such judgment modifies or holds invalid 10 any material terms or conditions of this Contract in such a manner that any Party is required to 11 incur new or different obligations not expressly provided herein or forego benefits which it 12 was otherwise entitled to, the Parties shall in good faith renegotiate the terms and conditions 13 affected by the judgment so as to restore the original balance of benefits and burdens 14 contemplated by the Parties as of the effective date of this Contract. Such renegotiated terms 15 and conditions shall be in the form of an amendment to this Contract which shall be effective 16 upon execution by the Parties. The original Contract shall remain in full force and effect, as 17 modified by said judgment, until the negotiation process for the amendment is complete. 18 19 17. GF.NF.RAi. PnWFR ('nNTRA("�' pAns�rcrn�rc. 20 Articles 1, 28, 29, and 31 through 43 of the General Power Contract Provisions, effective 21 January 3, 1989, attached hereto, are hereby made a part of this Contract, the same as if they 22 had been expressly set forth herein. 23 24 18. ATTA('HMFNTS ANn FXHTRiTS MAnF PART nF ('nNTRA("r• 25 Inasmuch as the Estimated Funding Schedule, the Repayment Schedule, and the Shasta Rewind 26 Incremental Increase in Capacity under this Contract may change during the term hereof, they 27 will be set forth in Exhibits A, B, and C, respectively. Each of said e�ibits shall become a 28 part of this Contract during the term fixed by its provisions. E�chibits A, B, and C are » . � � • � 1 attached hereto, and each shall be in force and effect in accordance with its terms until 2 respectively superseded by a subsequent elchibit. 3 4 19. RF.i,ATinNSH�P nF PARTTF�; 5 The covenants, obligations, and liabilities of the parties are intended to be several and not joint 6 or collective, and nothing herein contained shall ever be construed to create an association, 7 joint venture, trust or partnership, or to impose a trust or partnership covenant, obligations and 8 liabilities under this Contract. No Party shall be under the control of or shall be deemed to 9 control any other Party. No Party shall be the agent of or have a right or power to bind any 10 other Party without its express written consent, except as expressly provided in this Contract. 11 12 20. nWNF.RSHIP Ri(tHTS: 13 The ownership of, the title to, and the operation and maintenance responsibility for any 14 equipment furnished with funds advanced by the Customers under the terms of this Contract 15 shall be in the name of the UNITED STATES. 16 17 21. CUSTnMF.R I.iARiI TTY: 18 This Contract does not confer any liability upon the Customers for any claim, action or 19 judgment against Reclamation, arising out of or in connection with the work generally 20 described in Section 6. 21 22 22. F.XF.('LTTInN i1V niTNTFRPART• 23 This Contract may be executed in a number of counterparts and shall constitute a single 24 document with the same force and effect as if each Party had signed all other counterparts. 25 26 27 28 �s , . � � 1 IN WITNESS WHEREOF, the Parties have caused this Contract to be executed the 2 I day and year first above written. The signatories hereto represent that they have been 3 appropriately authorized to enter into this Contract on behalf of the Party for whom they sign. 4 5 WESTERN AREA POWER ADMINISTRATION 6 By: 7 Title: Area Manager g Address: 18 5 A _ll S r , S �i 105 9 Sa ram nt�, ('A 95825 10 BUREAU OF RECLAMATION 11 12 BY� Title: 13 Address: 14 15 (Seal) CITY OF ALAMEDA 16 17 Attest By; 1 g Title: BY� Address: 19 Title: 20 21 (Seal) CITY OF BIGGS 22 23 Attest gy: 24 Title: BY� Address: 25 Title: 26 27 28 19 . . . i • � 1 (Seal) CITY OF GRIDLEY 2 Attest By: 3 Title: 4 By: Address: 5 Title: 6 (Seal) CITY OF HEALDSBURG 7 g Attest gy: Title: 9 BY� Address: 10 Title: 11 (Seal) CITY OF LODI 12 13 Attest gy: 14 Title: BY� Address: 15 Title: 16 1� (Seal) CITY OF LOMPOC 1 g Attest By: 19 Title: 20 BY� Address: Title: 21 22 (Seal) NORTHERN CALIFORNIA POWER AGENCY 23 Attest BY: 24 Title: 25 By: Address: 26 Title: 27 28 za . � � 1 (Seal) CITY OF PALO ALTO 2 Attest By: 3 Title: 4 By: Address: 5 Title: 6 7 (Seal) PLUMAS-SIERRA RURAL ELECTRIC COOPERATIVE 8 9 Attest gy: 10 Title: BY� Address: 11 Title: 12 13 (Seal) CITY OF REDDING 14 Attest By: 15 Title: 16 BY' Address: Title: 17 18 (Seal) CITY OF ROSEVILLE 19 Attest gy: 20 Title: 21 By: Address: 22 Title: 23 (Seal) CITY OF SANTA CLARA 24 25 Attest By. Title: 26 BY� Address: 27 Title: 28 21 � � � � i • 1 (Seal) SACRAMENTO MUNICIPAL UTILITY DISTRICT 2 3 Attest gy: 4 Title: BY� Address: 5 Title: 6 � (Seal) SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT 8 9 Attest gy; Title: 10 BY� Address: 11 Title: 12 (Seal) TURLOCK IRRIGATION DISTRICT 13 14 Attest By: 15 Title: BY� Address: 16 Title: 17 1 g (Seal) CITY OF LTKIAH 19 Attest By: 20 Title: 21 BY� Address: Title: 22 23 24 25 26 27 28 zz � • Contract No. 94-SAO-00047 RESOLUTION NO. BE IT RESOLVED BY THE OF The is authorized, on behalf of to execute this Contract with the Western Area Power Administration titled Contract No. 94-SAO-00047. Adopted: . , . � • � Exhibit A to Contract No. 94-SAO-00047 FXHTBIT A (Estunated Funding and Project Work Schedule) 1. This Exhibit A, to be effective under and as a part of Contract No. 94-SAO-00047 (hereinafter called the Contract) shall become effective conincidentally with the Contract, and shall remain in effect until either superseded by another Exhibit A or upon termination of the Contract. 2. The anticipated schedule for the work generally set forth in Section 6 and the funding for such work is set forth as follows: FUNDING FUNDING ACTiViTY COMPi.F,TinN DAT DATF. NF`F,D� Initial Contribution Due Jul 14, 1995 Jul 14, 1995 $18,000 Award Bid Oct 19 - Nov 17, 1995 11 Disassemble Unit 4 Apr 1 - May 10, 1996 $142,860 Delivery of Materials �� Nov 20, 1995 - Sep 25, 1996 $5,117,330 Install Components - Unit 4 Sep 26, 1996 - Mar 27, 1997 $1,558,000 Reassemble Unit 4 Mar 24 - May 16, 1997 $190,480 Disassemble Unit 5 Aug 13 - Sep 24, 1997 $142,860 Delivery of Materials �� Apr 7, 1997 - Feb 12, 1998 $3,965,330 Install Components - Unit 5 Feb 13 - Aug 4, 1998 $1,538,000 Reassemble Unit 5 Aug 5 - Sep 30, 1998 $190,480 Disassemble Unit 3 Dec 30, 1998 - Feb 11, 1999 $142,860 Delivery of Materials 2� Aug 19, 1998 - Jun 28, 1999 $3,935,330 Install Components - Unit 3 Jun 29 - Dec 20, 1999 $1,543,000 Reassemble Unit 3 Dec 21, 1999 - Feb 17, 2000 $190,470 Contingencies ��,500,000 Total Cost $21,175,000 _" Funding Dates to be added upon award of contract(s) by Reclamation. �� Potential field winding replacement is included in the materials costs. iofz � � Exhibit A [o Contract No. 94-SAO-00047 3. The estimated breakdown of the costs for the work generally set forth in this Contract are as follows: Contract Costs $17,300,000 Non-Contract Regional Engineering 50,000 Contract Administration 50,000 Reclamation Technical Center 105,000 Contract Inspection 170,000 Local O&M Staff additional work 1,QQQ�QQQ Sub Total 1,375,000 Contingencies (15% of Contract amount) 2,500,()()0 Total $21,175.000 z of z , � � Exhibit B to Contract No. 94-SAO-00047 FXHiRiT R (Repayment Schedule and Customers Percentages) 1. This Exhibit B, to be effective under and as a part of Contract No. 94-SAO-00047 (hereinafter called the Contract) shall become effective coincidentally with the Contract, and shall remain in effect until either superseded by another Exhibit B or upon termination of the Contract. 2. The following table shows each Customer's Percentage to be used as the basis for calculating amounts to be advanced by each Customer and the credits to be made on each Customer's CVP power bills. PARTICIPANTS PERCENTAGE SHARE CALCULATED DOLLAR AMOUNT BART 1.0 % 211,750 NCP� (5.3 %) Turlock 0.3 % 63,525 Alameda 1.4 % 296,450 Bi s 0.2 % 42,350 Gridle 0.4 % 84,700 Healdsbur 0.2 % 42,350 Lodi 0.8 % 169,400 Lom oc 0.4 % 84,700 Plumas Sierra 1.1 % 232,925 Ukiah 0.5 % 105,875 Palo Alto'� 35.9 % 7,601,825 Reddin 10.0 % 2,117,500 Roseville 5.0 % 1,058,750 SMUD 30.0 % 6,352,500 Santa Clar� 12.8 % 2,710,400 TOTAL 100.0 % $21,175,000 1� Subject to final participation by NCPA Members. iofi � � Eachibit C to Contract No. 94-SAO-00047 F.XHiRIT C: (Shasta Rewind Incremental Increase in Capacity) 1� 1. This Exhibit C, to be effective under and as a part of Contract No. 94-SAO-00047 (hereinafter called the Contract) shall become effective coincidentally with the Contract, and shall remain in effect until either superseded by another Exhibit C or upon termination of the Contract. 2. The following table shows the incremental increase in capacity after completion of the work generally set forth in Section 6 of the Contract. STORAGE CAPACITY 1,000 ACRE FEET MW 3600 47 3500 41 3400 35 3300 26 3200 24 3100 22 3000 20 1� Based on existing capacity of 118 MW for generating unit 3 and 105 MW for generating units 4 and 5. � of �