Loading...
HomeMy WebLinkAboutReso 96-016 - Retaining the Bldg Permit fee schedules set forth in the 1991 edition of the uniform admin code 'l , ^ 4 � � RESOLUTION NO. 96-� A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING RETAINING THE BUILDING PERMIT FEE SCHEDULES SET FORTH IN THE 1991 EDITION OF THE UNIFORM ADMINISTRATIVE CODE. WHEREAS, the current City of Redding building permit fee schedules are set forth in the 1991 edition of the Uniform Administrative Code, and are set forth in the following tables attached hereto and made a part hereof: Table 3-A Building Permit Fees Table 3-B Electrical Permit Fees Table 3-C Mechanical Permit Fees Table 3-D Plumbing Permit Fees; and WHEREAS, the City Council is in the process of updating its Uniform Codes, but wishes to retain the building permit fee schedules set forth in the 1991 edition; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding hereby approves retaining the building permit fee schedules set forth in the 1991 edition of the Uniform Administrative Code, and adopts said fees as the building permit fees for the City of Redding. I HEREBY CERTIFI' that the foregoing resolution was introduced, read, and adopted at a regular meeting of the City Council on the 2nd day of Januarv, 1996, by the following vote: AYES: COUNCIL MEMBERS: P. Anderson, R. Anderson, McGeorge, Murray and Kehoe NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None ���/ , AVID A. �HOE, May r \ / � �1 ,�'�T�S'T: FORM APPROVED: � � _ � � , ��`��%� - � , �.'�✓. � � � Ci)NNIE S I�OHMA W. LEONARD W ATE �,^ .'City Clex� City Attorney . . i � ` TABLE NO. 3-A—BUILDING PERMIT FEES _ _ _ _ __ _ .. _ _ _ __ __ Total 1laluation >Fee S1 to 5500 S15 5501 to S2,000 515 for the first 5500 plus S2 for each additional 5100 or fraction thereof, to and including 52,000. 52,001 to 525,000 S45 for the first 52,000 plus S9 for each additional 51,000 or fraction thereof, to and including 525,000. 525,001 to $50,000 5252 for the first 25,000 plus 56.50 for each additional 51,000 or fraction thereof, to and including 550,000. 550,001 to S100,000 5414.50 for the first 550,000 plus 54.50 for each additional $1,000 or fraction thereof, to and including $100,000. 5639.50 for the first 5100,000 plus 53.50 for each additional S100,001 to 5500,000 51,000 or fraction thereof, to and including 5500,000. 52,039.50 for the first 5500,000 plus 53 for each additional $1,000 or fraction thereof, to and including 51,000,000. 5500,001 to $100,000 $3,539.50 for the first 51,000,000 plus $2 for each additional S 1,000 or fraction thereof. S 1,000,001 and up Other Inspections and Fees: 1. Inspections outside of normal business hours . . . . . . . . . . . . . . . . . . . S30 per hour (Minimum charge—two hours) 2. Reinspection fees assessed under provisions of Section 305(g) . . . . . . . S30 per hour* 3. Inspections for which no fee is specifically indicated . . . . . . . . . . . . . . S30 per hour* (Minimum charge—one-half hour) 4. Additional plan review required by changes, additions, or revisions to approved plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S30 per hour* (Minimum charge—one-half hour) *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. 12/06/95 BLDG\CODE\BLDGFEES . ' . • • TABLE NO. 3-B—ELECTRICAL PERMIT FEES Permit Issuance For issuing each permit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 515.00 For issuing each supplemental permit . . . . . . . . . . . . . . . . . . . . . . . . . . 4.50 System Fee Schedule (Note: The following does not include permit issuing fee.) New Residential Buildings The following fees shall include all wiring and electric equipment in or on each building or other electrical equipment on the same premises constructed at the same time. For new multiple-family residential buildings (apartments and condominiums) having three or more living units not including the area of garages, carports, and other noncommercial automobile storage areas constructed at the same time, per square foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .03 For new single- and two-family residential buildings not including the area of garages, carports, and other minor accessory buildings constructed at the same time, per square foot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .035 For other types of residential occupancies and alterations, additions, and modifications to existing residential buildings, use the UNIT FEE SCHEDULE. New Nonresidential Buildings The following fees shall include all wiring and electrical equipment in or on each building or other electrical equipment on the same premises constructed at the same time per square foot: 3,000 square feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .045 3,001 to 10,000 square feet . . . . . . . . . . . . . . . . . . . . . . . . . . . .035 Over 1,000 square feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .025 Private Swimming Pools For new private, residential, in-ground swimming pools for single-family and multiple-family occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping, and other similar electrical equipment directly related to the operation of a swimming pool, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30.00 For other types of swimming pools, therapeutic whirlpools, spas, and alterations to existing swimming pools, use the UNIT FEE SCHEDULE. (Continued) , ' • , TABLE NO. 3-B—ELECTRICAL PERMIT FEES (Continued) Carnivals and Circuses Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable-type rides, booths, displays, and attractions. For electric generators and electrically driven rides, each . . . . . . . . . . . . . S 15.00 For mechanically driven rides and walk-through attractions or displays having electric lighting, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.50 For a system of area and booth lighting, each . . . . . . . . . . . . . . . . . . . . 4.50 For permanently installed rides, booths, displays, and attractions, use the UNIT FEE SCHEDULE. Temporary Power Service For a temporary-service power pole or pedestal, including all pole or pedestal- mounted receptacle outlets and appurtenances, each . . . . . . . . . . . . . . . 15.00 For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lights, Christmas tree sales lots, firework stands, etc., each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.50 Unit Fee Schedule (Note: The following does not include permit issuing fee.) Receptacle, Switch, and Lighting Outlets For receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters. First 20, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75 Additional outlets, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45 Note: For multi-outlet assemblies, each five feet or fraction thereof may be considered as one outlet. Lighting Fixtures For lighting fixtures, sockets, or other lamp-holding devices. First 20, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75 Additional fixtures, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45 For pole- or platform-mounted lighting fixtures, each . . . . . . . . . . . . . . . . .75 For theatrical-type lighting fixt�res or assemblies each . . . . . . . . . . . . . . . .75 (ContinuedJ . ' • � TABLE NO. 3-B—ELECTRICAL PERMIT FEES (Continued) Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall- mounted electric ovens; counter-mounted cooking tops; electric ranges, self- contained room, console, or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; of other motor-operated appliances not exceeding one horsepower (HP) in rating, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53.00 Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Nonresidential Appliances For residential appliances and self-contained, factory-wired, nonresidential appliances not exceeding one horsepower (HP), kilowatt (KW1, or kilovolt- ampere (KVA) in rating, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each . . . 3.00 Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus. Power Apparatus For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus as follows: Rating in horsepower (HPI, kilowatts (KW), kilovolt-amperes (KVA), or kilovolt-amperes-reactive (KVAR): Up to and including 1, each . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.00 Over 1 and not over 10, each . . . . . . . . . . . . . . . . . . . . . . . . . . 7.50 Over 10 and not over 50, each . . . . . . . . . . . . . . . . . . . . . . . . . 15.00 Over 50 and not over 100, each . . . . . . . . . . . . . . . . . . . . . . . . 30.00 Over 100, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45.00 Note: 1 . For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. 2. These fees include all switches, circuit breakers, contactors, thermostats, relays, and other directly related control equipment. Busways For trolley and plug-in type busways, each 100 feet or fraction thereof . . . 4.50 Note: An additional fee will be required for lighting fixtures, motors, and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools. (Continued) . ' • • • TABLE NO. 3-B—ELECTRICAL PERMIT FEES (Continued) Signs, Outline Lighting, and Marquees For signs, outline lighting systems, or marquees suppled from one branch circuit, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 515.00 For additional branch circuits within the same sign, outline lighting system, or marquee, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.00 Services For services of 600 volts or less and not over 200 amperes in rating, each 18.50 For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37.50 For services over 600 volts or over 1,000 amperes in rating, each . . . . . . 75.00 Miscellaneous Apparatus, Conduits, and Conductors For electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth . . . . . . . . . . . . . . . . . . 11.00 Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs, or other equipment. Other Inspections and Fees 1. Inspections outside normal business hours (minimum charge—two hours) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30.00/hour 2. Reinspection fees assessed under provisions of Section 305 (g) . . . 530.00/hour* 3. Inspections for which no fee is specifically indicated (minimum 530.00/hour* charge—one-half hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4. Additional plan review required by changes, additions, or revisions to 530.00/hour* approved plans (minimum charge—one-half hour) . . . . . . . . . . . . . *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. 12/06/95 BLDG\CODE\ELECFEES . ' • . TABLE NO. 3-C—MECHANICAL PERMIT FEES Permit Issuance 1. For the issuance of each permit . . . . . . . . . . . . . . . . . . . . . . . . . 515.00 2. For issuing each supplemental permit . . . . . . . . . . . . . . . . . . . . . 4.50 Unit Fee Schedule 1. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance up to and including 100,000 Btu/h . . . . . . . . . . . . . . . . . . . . . . . 9.00 2. For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.00 3. For the installation or relocation of each floor furnace, including vent 9.00 4. For the installation or relocation of each suspended heater, recessed wall heater, or floor-mounted unit heater . . . . . . . . . . . . . . . . . . 9.00 5. For the installation, relocation, or replacement of each appliance vent installed and not included in an appliance permit . . . . . . . . . . . . . 4.50 6. For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code . . . . . . . . . . . . . . . . . . . . . . . . . 9.00 7. For the installation or relocation of each boiler or compressor to and including three horsepower or each absorption system to and including 100,000 Btu/h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.00 8. For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower or each absorption system over 100,000 Btu/h and including 500,000 Btu/h . . . . . . . . . . . . 16.50 9. For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h . . . . 22.50 10. For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h . . 33.50 11 . For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower or each absorption system over 1,750,000 Btu/h . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56.00 (Continued) . ' • • TABLE NO. 3-C—MECHANICAL PERMIT FEES (Continuedl 12. For each air-handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto . . . . . . . . . . . . . . . . . . 6.50 Note: This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere in this code. 13. For each air-handling unit over 10,000 cfm . . . . . . . . . . . . . . . . . 11.00 14. For each evaporative cooler other than portable type . . . . . . . . . . 6.50 15. For each ventilation fan connected to a single duct . . . . . . . . . . . 4.50 16. For each ventilation system which is not a portion of any heating or air- conditioning system authorized by a permit . . . . . . . . . . . . . . . . . 6.50 17. For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood . . . . . . . . . . . . . . . . . 6.50 18. For the installation or relocation of each domestic-type incinerator . 1 1.00 19. For the installation or relocation of each commercial or industrial-type incinerator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45.00 20. For each appliance or piece of equipment regulated by this code but not classed in other appliance categories or for which no other fee is listed in this code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.50 Other Inspections and Fees 1. Inspections outside normal business hours (minimum charge—two hours) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 530.00/hour* 2. Reinspection fees assessed under provisions of Section 305 (g) . . . 530.00/hour* 3. Inspections for which no fee is specifically indicated (minimum charge—one-half hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 530.00/hour* 4. Additional plan review required by changes, additions, or revisions to approved plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $30.00/hour* *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. 12/06/95 BLDG/CODE/MECHFEES . " , • � . TABLE NO. 3-D-PLUMBING PERMIT FEES Permit Issuance 1. For the issuance of each permit . . . . . . . . . . . . . . . . . . . . . . . . . S15.00 2. For issuing each supplemental permit . . . . . . . . . . . . . . . . . . . . . 4.50 Unit Fee Schedule (in addition to 1 or 2 above) 1. For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage, piping, and back-flow protection therefor) 6.00 2. For each building sewer and each trailer park sewer . . . . . . . . . . . 15.00 3. Rainwater systems-per drain (inside building) . . . . . . . . . . . . . . . 6.00 4. For each cesspool (where permitted) . . . . . . . . . . . . . . . . . . . . . 22.50 5. For each private sewage disposal system . . . . . . . . . . . . . . . . . . 45.00 6. For each waterheater and/or vent . . . . . . . . . . . . . . . . . . . . . . . 7.50 7. For each industrial-waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12.00 8. For the installation, alteration, or repair of water piping and/or water- treating equipment, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.00 9. For the repair or alteration of drainage or vent piping, each fixture . 3.00 10. For each lawn sprinkler system on any one meter, including back-flow protection devices therefor . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.00 1 1. For atmospheric-type vacuum breakers not included in Item 1: Oneto5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.50 Over 5, each . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.50 12. For each back-flow protection device other than atmospheric-type vacuum breakers: Two inches and smaller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.50 Over 2 inches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.00 13. For each gas piping system of one to four outlets . . . . . . . . . . . . 3.00 14. For each gas piping system of five or more outlets, per outlet . . . . .75 (ContinuedJ , ' ` . • � � TABLE NO. 3-D—PLUMBING PERMIT FEES (Continued) Other Inspections and Fees 1. Inspections outside normal business hours (minimum charge—two hours) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 530.00/hour* 2. Reinspection fees assessed under provisions of Section 305 (g) . . . 530.00/hour* 3. Inspections for which no fee is specifically indicated (minimum 530.00/hour* charge—one-half hour) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4. Additional plan review required by changes, additions, or revisions to 530.00/hour* approved plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. 12/06/95 BLDG\CODE\PLMBFEES