HomeMy WebLinkAboutReso 96-118 - Approve entering into cooperative agreement no 02365-277814 with CalTrans for Const of Signalization or SR299 @ the intersection of Buena Ventura Blvd s ' • • RESOLUTION NO. 96- /! A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING ENTERING INTO COOPERATIVE AGREEMENT NO. 02365-277814 WITH CALTRANS FOR THE CONSTRUCTION OF SIGNALIZATION ON SR299 AT THE INTERSECTION OF BUENAVENTURA BOULEVARD. IT IS HEREBY RESOLVED that the City Council of the City of Redding approves entering into Cooperative Agreement No. 02365-277814 between the State of California, acting by and through its Department of Transportation, and the City of Redding, a true copy of which is attached hereto and made a part hereof. BE IT FURTHER RESOLVED that the Mayor is authorized to sign said agreement on behalf of the City, as well as any supplemental agreements required to finalize the Project documents prior to contract award; and the City Clerk is directed to attest the signatures and impress the official seal of the City of Redding to the necessary documents. I HEREBY CERTIF'Y that the foregoing resolution was introduced, read and adopted at a regular meeting of the City Council on the 4 rh day of June , 1996, by the following vote: AYES• COUNCIL MEMBERS' P� Anderson, R. Anderson, Kehoe, Murray and McGeorge NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None G . DAVID . cGEO , M or _v � Attest: Form Approved: � � ' !�' V � u� c�Xe Connie Stroh ayer, City k � W. eonard Wingate, ty Attorney . . . i • 02-Sha-299 22.1/23.0 KP In Shasta County in Redding from 0.3 KM East of Wildwood Lane to 0.3 KM West of Walnut Avenue (Portions) Install Signal and Lighting District Agreement No. 02-0001 02365-277814 COOPERATIVE AGREEMENT This AGREEMENT, entered into on , is between the STATE OF CALIFORNIA, acting by and through its Department of Transportation, referred to herein as STATE, and CITY OF REDDING, a body politic and a municipal corporation of the State of California, referred to herein as CITY RECITALS STATE and CITY contemplate installing a traffic control signal and safety lighting and perform roadwork on Route 299 at the intersection of Buenaventura Boulevard, referred to herein as "PROJECT", and desire to specify the terms and conditions under which PROJECT is to be engineered, constructed, financed, and maintained. SECTION I STATE AGREES: 1. To provide all necessary preliminary engineering, including plans and specifications and utility identification and location, and all necessary construction engineering services for PROJECT and bear STATE's share of the actual expense thereof. Estimates of such costs are shown on Exhibit A, attached and made a part of this Agreement. 2. To construct PROJECT by contract in accordance with plans of specifications of STATE. 1 ' • � , � • District Agreement No. 02-0001 3. To pay an amount equal to 50% of the actual signal and lighting related construction cost and STATE's share of the actual roadwork construction cost, estimated to be $239,500. In no event shall STATE's total obligation for construction cost under this Agreement, excluding costs referred to in Section III, Article (9), exceed the amount of$275,400 provided that STATE may, at its sole discretion, in writing, authorize a greater amount. 4. Upon completion of PROJECT and all work incidental thereto, to furnish CITY with a detailed statement of the portion of the engineering and construction costs to be borne by CITY, including resolution of any construction related claims which have been allowed to the construction contractor. STATE thereafter shall refund to CITY promptly after completion of STATE's audit, any amount of CITY's deposit required in Section II, Article (1) remaining after actual cost to be borne by CITY have been deducted, or to bill CITY for any additional amount required to complete CITY's financial obligations pursuant to this Agreement. 5. To maintain the entire traffic control signal and safety lighting as installed and pay an amount equal to 50% of the total maintenance costs, including electrical energy costs. 6. To operate the traffic control signal as installed and pay one hundred percent (100%) of the operation cost. 7. To furnish the traffic signal control equipment for PROJECT. This equipment shall consist of signal controller unit, modems, and signal control cabinet. The estimated cost of this STATE-furnished equipment is $8,000, and the actual cost to STATE shall be deducted from STATE's share of the PROJECT cost. 2 . � , • i District Agreement NO. 02-0001 SECTION II CITY AGREES: 1. To deposit with STATE within 25 days of receipt of billing therefor(which billing will be forwarded 15 days prior to STATE's bid advertising date of a construction contract for PROJECT), the amount of$186,400, which figure represents CITY's estimated share of the expense of preliminary engineering, construction engineering, and construction costs required to complete PROJECT, as shown on Exhibit A. CITY's total obligation for said anticipated PROJECT costs, exclusive of claims and excluding cost referred to in Section III, Article (9) of this �. Agreement, shall not exceed the amount of$214,400, provided that CITY may, at its sole discretion, in writing, authorize a greater amount. 2. CITY's share of the construction cost (estimated to be $152,800) shall be an amount equal to 50% of the total actual signal and lighting related construction costs plus CITY's share of the actual roadwork construction costs, including the cost of construction-related claims, the cost of STATE defense of any of those claims and the cost of STATE-furnished material, if any, as determined after completion of work and upon final accounting of costs. 3. CITY's share of the expense of preliminary engineering shall be an amount equal to 39% of STATE's actual costs for preliminary engineering for the entire PROJECT. 4. CITY's share of the expense of construction engineering shall be an amount equal to 39% of STATE's actuai costs of construction engineering for the entire PROJECT. � 5. To pay STATE upon completion of all work and within twenty (20) days of receipt of a detailed statement made upon final accounting of costs therefor, any amount over and above the aforesaid advance deposit required to complete CITY's financial obligation pursuant to this Agreement. 6. To reimburse STATE for CITY's proportionate share of the cost of maintenance of traffic control signal and safety lighting, such share to be an amount equal to 50% of the total maintenance costs, including electricai energy costs. 3 • . District Agreement NO. 02-0001 SECTION III IT IS MUTUALLY AGREED: l. All obligations of STATE under the terms of this Agreement are subject to the appropriation of resources by the Legislature and the allocation of resources by the California Transportation Commission. 2. All obligations of CITY under the terms of this Agreement are subject to the appropriation of resources by the City Council, and the allocation of resources by the Regional Transportation Planning Agency. 3. STATE shall not award a contract to construct PROJECT until after receipt of CITY's deposit required in Section II, Article (1) of this Agreement. 4. Should any portion of PROJECT be financed with Federal funds or State gas tax funds, all applicable laws, regulations and policies relating to the use of such funds shall apply, notwithstanding other provisions of this Agreement. 5. After opening of bids for construction of PROJECT, CITY's estimate of cost will be revised based on actual bid prices. CITY's required deposit under Section II, Article (1) will be increased or decreased to match said revised estimate. If deposit increase or decrease is less than $1,000, no refund or demand for additional deposit will be made until final accounting. 6. After opening bids for construction of PROJECT, and if bids indicate a cost overrun of no more than 15% of the estimate will occur, STATE may award the contract. 7. If, upon opening of bids, it is found that a cost overrun exceeding 15% of the estimate will occur, STATE and CITY shall endeavor to agree upon an alternative course of action. If, after twenty-five (25) days, an alternative course of action is not agreed upon, this Agreement shall be deemed to be terminated by mutual consent pursuant to Article (8) of this Section III. 8. Prior to award of the construction contract for PROJECT, CITY may terminate this Agreement by written notice, provided CITY pays STATE for all PROJECT related costs incurred by STATE prior to termination. 4 � � District Agreement No. 02-0001 9. If termination of this Agreement is by mutual consent, STATE will bear 61% and CITY will bear 39% of all PROJECT related costs incurred by STATE prior to termination, except that any utility relocation costs shall be prorated in accordance with STATE's/CITY's responsibility for utility relocation costs. 10. If e�sting public and/or private utility facilities conflict with PROJECT construction or violate STATE's encroachment policy, STATE shall make all necessary arrangements with the owners of such facilities for their protection, relocation or removal. STATE shall inspect the protection, relocation or removal. If there are costs of such protection, relocation or removal which STATE and CITY must legally pay, STATE and CITY shall share in the cost of said protection, relocation or removal, plus cost of engineering overhead and inspection, in the amount of 61% STATE and 39% CITY. If any protection, relocation, or rernoval of utilities is required, such work shall be performed in accordance with STATE's policy and procedure for those facilities located within the limits of work providing for the improvement to the State highway and in accordance with CITY policy for those facilities outside of the limits of work providing for the improvement to the State highway. 1 l. Upon completion of all work under this Agreement, ownership and title to all materials, equipment and appurtenances installed will automatically be vested in STATE and no further agreement will be necessary to transfer ownership to STATE. 12. The cost of any engineering or maintenance referred to herein in this Agreement shall include all direct and indirect costs (functional and administrative overhead assessment) attributable to such work, applied in accordance with STATE's standard accounting procedures. 13. Nothing in the provisions of this Agreement is intended to create duties or obligations to or rights in third parties not parties to this Agreement or affect the legal liability of either party to the Agreement by imposing any standard of care with respect to the maintenance of State highways different from the standard of care imposed by law. 5 • ' � • District Agreement NO. 02-0001 14. Neither STATE nor any officer or employee thereof is responsible for any damage or liability occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this agreement. It is understood and agreed that, pursuant to Government Code Section 895.4, CITY shall fully defend, indemnify and save harmless the State of California, all of�icers and employees from all claims, suits or actions of every name, kind and description brought for or on account of injury (as defined in Government Code Section 810.8) occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this Agreement. 15. Neither CITY nor any officer or employee thereof is responsible for any damage or liability occurring by reason of anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction delegated to STATE under this Abreement. It is understood and agreed that, pursuant to Government Code Section 895.4, STATE shall fully defend, indemnify and save harmless CITY from all claims, suits or actions of every name, kind and description brought for or on account of injury (as defined in Government Code Section 810.8) occurring by reason of anything done or omitted to be done by STATE under or in connection with any work,. authority or jurisdiction delegated to STATE under this Agreement. 16. In the construction of said work, STATE will furnish a representative to perform the functions of a Resident En�ineer, and CITY may, at no cost to STATE, furnish a representative, if it so desires, and said representative and Resident Engineer will cooperate and consult with each other, but the decisions of STATE's Resident EnDineer shall prevail. 17. Execution of this Agreement by CITY grants to STATE the right to enter upon CITY owned lands to construct PROJECT. 6 • • District Agreement NO. 02-0001 1 n. Those portions of this Agreement pertaining to the construction of PROJECT shall terminate upon completion and acceptance of the construction contract for PROJECT by STATE, or on June 30, 2002, whichever is earlier in time; however, the ownership, operation, maintenance, liability, and claims clauses shall remain in effect until terminated or modified, in writing, by mutual agreement. Should any construction related claim arising out of PROJECT be asserted against STATE, CITY agrees to extend the termination date of this Agreement and provide additional funding as rec�uired to cover CITY's proportionate share of costs or execute a subsequent Agreement to cover those eventualities. STATE OF CALIFORNIA CITY OF REDDING DEPARTMENT OF TRANSPORTATION JAMES W. van LOBEN SELS Director of Transportation By: Mayor By Attest: District Director City Clerk Approved as to form and Approved as to form and procedures: procedures: Attorney Department of Transportation Attorney Certified as to funds: �•�U�c..�� District Resource Manager Certified as to form and procedures: Headquarters Accounting Administrator 7 '• •. , ` � • District Agreement No. 02-0001 �XFIIBI'I' A Estimate of Cost Description Total Est. City's State's Cost Share Share Construction Cost Signal and Safety Lighting $ 297,400 $ 148,700 $ 148,700 Includes: State furnished materials Traffic control Signing Pavement delineation Curb ramps Curb and gutter Sidewalks Roadwork $ 94,900 $ 4,100 $ 90;800 Includes: A.C. overlay Subtotal $ 392,300 $ 152,800 $ 239,500 Engineering Cost (Includes Overhead) Preliminary Engineering $ 31,400 $ 12,200 $ 19,200 ��%) Construction Engineering $ 54,900 $ 21,400 $ 33,500 (14%) Subtotal $ 86,300 $ 33,600 $ 52,700 TOTAL $ 478,600 $ 18G,400 $ 292,200 8