HomeMy WebLinkAboutReso 97-202 - Amending Scedule of Fees and Service Charges Pertaining to Development Processing Fees and Traffic Impact Fees� ' ,
' ' . . � �
RESOLUTION NO. 97- ZO Z
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
REDDING AMENDING ITS SCHEDULE OF FEES AND SERVICE
CHARGES PERTAINING TO DEVELOPMENT PROCESSING FEES
AND TRAFFIC IMPACT FEES.
WHEREAS, on October 4, 1988, by Resolution 88-364, the City Council adopted a Schedule
of Fees and Service Charges (Schedule), which has been amended from time-to-time; and
WHEREAS, pursuant to said resolution, the City Manager is authorized and directed to
revise, supplement and maintain the Schedule so that it will be, to the greatest extent possible, a
comprehensive list of fees for City permits and services; and that a fee that is not on the Schedule will
not be invalid but should be made a part thereof at the earliest possible time; and
WHEREAS, it is the desire of the City Council that all City services be self-supporting and
not subsidized as to their operational costs by revenues raised through the imposition of ad valorem
taxes or other sources of revenue; and
WHEREAS, on November 4, 1997, the City Council directed staff to schedule and advertise
for public hearing various increases in development processing and impact fees; the appropriate public
notice has been published; and
WHEREAS, the proposed increases in development processing fees and traffic impact fees as
recommended by City staff and the Development Fee Review Committee are attached hereto; and
WHEREAS, a public hearing regarding the proposed increases in development processing fees
and traffic impact fees was held on this date, prior to the adoption of this resolution;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF REDDING FINDS,
DETERMINES AND RESOLVES THAT:
1. With respect to the proposed increases in development processing fees and traffic impact fees, �
the City Council finds and determines that: �
A. The fees are reasonably related to or are less than the costs of providing the specific \t
services for which the fees are to be charged, and are necessary to cover the City's 1�
costs of providing the services. �
B. The provisions of the California Environmental Quality Act do not apply to the fees, �
which are for the purpose of ineeting operating expenses, or a portion thereof. �
C. The proposed fees will not exceed the governmental costs in providing the services in
fiscal year 1997/98 and following.
AMENDED BY RESOLUTION N0. 2003-167 '::+'�?i::::r::z '••''•:t`::•`::•
, { .,_',....�-._'•...'• ;��'I_�' �'' �...��..f�...'�...
� � � � �
2. The City's Schedule of Fees and Service Charges be amended to include the development
processing fees and the traffic impact fees to be charged effective February 16, 1998, and
January l, 1999, as shown on the Schedule of Fees and Charges attached hereto and made a
part hereof by reference.
3. On the first day of July, 1999, and on every July 1 thereafter, the City's development
processing fees shall automatically increase by an amount equal to the latest published annual
increase in the Consumer Price Index (CPI) for All Urban Consumers, mid-size western cities.
4. On ttie first day of July, 1999, and on every July 1 thereafter, the City's traffic impact fees
shall automatically increase by an amount equal to the latest published annual increase in the
Engineering News Record Cost of Construction Index (CCI).
I HEREBY CERTIFY that the foregoing resolution was introduced, read and adopted at a
regular meeting of the City Council on the 18th day of November, 1997, by the following vote:
AYES: COUNCII. MEMBERS: Anderson, Kehoe, McGeorge and Murray
NOES: COUNCId.MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
ABSTAIN: COUNCIL MEMBERS: None
N , ayor
Attest: Form Approved:
' �,��,� zZ�e�%���``' �-
Connie Strohmayer, City er W. Leonard Wingate, !� ty Attorney
2 ,_.,;...F.'1="= �';.�-;r::•d:::i '..�t...�... . '...'i...'�... �••i
. �"""'."'." ,:
+C�`I`� �T R���7►��� :
� , ,
;:
;::
�+�HEI?UL�flF�'�E�AI�D��I��I���Ht�R��� ;
;: :.::. ;<:.;;;:: >;;:.. ,
, ,
>::;.;<.;::>: ::>::::::>: .;;::>:::>::::.. �ee�mQur�t�<�n:d��I��s.>�less.oth�e
;::::. ( ;>< _ r��se��dieat�ed}
;: ...>
;:.;:.;:.. ..
�r�a����fl�s������c���� ���������1 2ti�1�� �1�9
; ; :;.;:...;::.:.::.;:.; >;;;:.... > ; ..s���e�����
FIRE DEPARTMENT
Building Plan Check Fee 120 130 141
Sprinkler Plan Check Fee 0 70 76
Fire Alarm Plan Check Fee 0 70 76
Sprinkler System Inspection 120 130 141
DE�ELOPMENT SERVICES DEPARTMENT BUILDING DIVISIQN
BUILDING:'PERMIT FEES
1 to 500 15.00 16.30 17.70
15.00 plus 2.00 for each 16.30 plus 2.20 for each 17.70 plus 2.40 f'or each
501 to 2,000 additional 100 over tlie additional 100 over the additionai 100 over the
first 500 first 500 tirst 500
45.00 plus 9.00 for each 49.30 plus 9.80 for each 53.70 plus 10.60 for
2,001 to 25,000 additional 1,000 over the additiona( 1,000 over the each additional 1,000
first 2,000 first 2,000 over tlie first 2,000
252.00 plus 6.50 for 274.70 plus 7.10 for 297.50 plus 7.70 for
25,001 to 50,000 each additional 1,000 each additional 1,000 each additional 1,000
over the first 25.000 over the first 25,000 over the first 25,000
_,_. _ 414.50 plus 4.50 for 452.20 plus 4.80 for 490.00 plus 5.30 for
50,001 to 100,000 each additional 1,000 each additional 1,000 each additional 1,000
over the first 50,000 over the first 50,000 over the first 50,000
639.50 plus 3.50 for 697.20 plus 3.80 for 755.00 plus 4.10 for
100,001 to 500,000 each additional 1,000 each additional 1,000 each additional 1,000
over the first 100,000 over the ftrst 100,000 over the tirst 100,000
2,039.50 plus 3.00 for 2,217.20 plus 3.30 for 2,395.00 plus 3.50 for
500,001 to 1,000,000 each additional 1,000 each additional I,000 each additional 1,000
over the first 500,000 over the tirst 500,000 over the first 500.000
3,539.50 plus 2.00 for 3,867.20 plus 2.20 for 4,145.00 plus 2.40 for
1,000,001 and Up each additional 1,000 each additional 1,000 each additional 1,000
over the first I,OOQ000 over the first I,000,000 over the first 1,000.000
OTHER INSPECTIONS AND FEES
Inspection outside of normal business hours 30.00/hr 32.50/hr 35.30/hr
Re-inspection fees assessed under provisions of Section 108.8 30.00/hr 32.50/hr 35.30/hr
C.B.C.
Ins ections for which no fee is s ecificall indicated 30.00/hr 32.50/hr 35.30/hr
Additional plan review required by changes,additions,or revision 30.00/hr 32.50/hr 35.30/hr
to a roved lans
Pian Review 65%of the Building 65%of the Building 65%of the Building
Permit Fee Permit Fee Permit Fee
ELECTRIC'PERMIT FEES.
Permit Issuance-each ermit 15.00 16.30 17.70
Each su lemental ermit 4.50 4.90 5.30
SYSTEM FEE SCHEDULE
New Residential Buildin s
Multi Famii .03 er s .ft. .035 er s .ft. .040 er s .ft.
Sin le-two famil .035 er s .ft. .040 er s .ft. .045 er s .ft.
...,...,:�,:•ti:::; ...
� :... ., ....;
:.. ....�.
_:e�:�+ ' . , ; � ;' !...�'... _ '
.„.,
'", ,..,f,,,f'.;;s .,.'.,..��•_.'�...� _.�..�.:. ... �...<
Page I of 7
` '' ;�I'I`� Q� I��#��1��
;::... .
, ; ' . .. ; ...S�H��UI�E Q��"���AI�D��I��I�� �HAI���� ;:< .:: ,:
(Ree amounts:�n c�oll�rs unless otherwi�e�nii�rat�ed
;: ; ; ;: .
;.;:::.;:::: ::.::..;....:
;::.>:.:::>::::.:
>
;. :. }.. .;::. ;. ;
�r�fl����o�s�R�i�����c� 21�t19� �I��
�ui�����,���I
,::.;. ��
�I�E G�IAR��:
New Nonresidential Buildin s
3.000 s .ft.or less .045 er s .ft. .050 er s .ft. .055 er s .ft.
3,001 to 10.000 s .ft. .035 er s .ft. .040 er s .ft. .045 er s .ft.
Over 10,000 s .ft. .025 er s .ft. .030 er s .ft. .035 er s .ft.
Private Swimmin Pools 30.00 each 32.60 each 3530 each
Carnivals and Circuses
Electrical enerators and electricallv driven rides I5.00 each 16.30 each 17.70 each
Mechanically driven rides and attractions or displays with electric 4.50 each 4.90 each 5.30 each
li htin
S stem of area and booth li htin 4.50 each 4.90 each 5.30 each
Tem orarv Power Service
Power ole or edestal 15.00 16.30 I7J0
Distribution svstem 7.50 8.10 8.80
UNIT FCE SCHEDULE
Rece tacic,Switch,and Li htin Outlets
First 20 .75 each .80 each .90 each
Additional Outlets .45 each .50 each .55 each
Li htin Fixtures
First 20 .75 each .80 each .90 each
Additional Fixtures .45 each .50 each 55 each
Pole or latforn�Li htin tixtures .75 each .80 each 90 each
Theatrical t e Li h[in Fixtures JS each .80 each .90 each
A lianccs
Residential A liances 3.00 each 3.25 each 3.50 each
Non-residential A liances 3.00 each 3.25 each 3.50 each
Power A aratus er HP,kW,KAVA or KVAR
U to and includin I 3.00 each 3.25 each 3.50 each
Over 1 and not over 10 7.50 each 8.l5 each A.80 each
Over 10 and not over 50 I5.00 each 16.30 each 17.70 each
Over 50 and not over 100 30.00 each 32.50 each 35.50 each
Over 100 45.00 each 48.90 each 53.00 each
Buswavs-Trollev and lu -in tv e 4.50 each 4.70 each 5.30 each
Si ns,Outline Li htin ,and n4ar uees
Su lied from one branch circuit 15.00 each 16.30 each 17.70 each
Additional branch circuits er si n 3.00 each 3.25 each 3.50 each
Services �
600 volts or less and not over 200 am eres I 8.50 each 20.10 each 21.80 each
600 volts or less and over 200 am eres to I,000 am eres 37.50 each 40.70 each 44.15 each
Over 600 volts or over 1,00 am eres 75.00 each 81.50 each 88.50 each
Misc.Apparatus,Conduits,and Conductors for which a permit is i 1 �Z ��
re uired but no other fees is set
OTHER INSPECTIONS AND FEES
[ns ection outside normal business hours 30.00/hr. 32.50/hr. 35.30/hr.
Re-inspection fees assessed under provisions of Section 108.8 30.00/hr. 32.50/hr. 35.30/hr.
C.B.C.
Ins ections for which no fee is set 30.00/hr. 32.50/hr. 35.30/hr.
Additional lan review re uired b chan es 30.00/hr. 32.50/hr. „, 3�.a0%�r. :..,,..... ...: ... .. .. -.
. �
`^t�,••�€ :...., ...�•.::�-...��.. : ,3 li...`•t::�
...��...� .. , ...�...
Page 2 of 7
;
> �I`I"�' ��' 1���?�1��' ,
; ,
. , �+��-I�II�UL�QF�"����1�D��R�I�����R���,
t�`��am;Qun#s�n doll�r�untess otherr�ise�ndtcat�ed)
;.:::.
;::.;...
C[�I�R��i'�'F��1
�r�Q����o�sr���rc�e�A�c� ' : 2/�:�J9� �/�99
;:.::
; s�uic�.c�a����< . ..
MECHAN7CAL PERMIT FEES
Permit Issuance 15.00 each 16.30 each 17.70 each
Su lemental ermit issuance 4.50 each 4.90 each 5.30 each
UNIT FEE SCHEDULE
Installation of force air or ravit t e furnace or burner
U to and includin 100,000 Btu/h 9.00 each 9.80 each 10.60 each
Over I OQ000 Btu/h 1 L00 each I 1.00 each I 1.00 each
[nstallation or relocation of floor furnace 9.00 each 9.80 each 10.60 each
Installation or relocation of suspended heater,recessed wall heater 9.00 each 9.80 each 10.60 each
or floor mounted heater
tnstallation,relocation or re lacement of a liance vent 4.50 each 4.90 each 5.30 each
Repair or alteration of,or addition of each heating appliance,
refrigeration unit,cooling unit,absorption unit or each hea[ing, 9.00 each 9.80 each 10.60 each
cooling,absorption or evaporative cooling system including
installation of controls
Installation or relocation of boiler or com ressor
U to 3 horse ower or 100,000 Btu/h 9.00 each 9.80 each 10.60 each
U to (5 horse ower or 500.000 Btu/h 16.50 each (7.90 each 19.50 each
U to 30 horse ower or 1,000,000 Btu/h 22.50 each 24.40 each 26.50 each
U to 50 horse ower or 1,750,000 Btu/h 33.50 each 36.40 each 39.50 each
Over 50 horse ower or 1,750.000 Btu/h 56.00 each 60.80 each 66.00 each
Air-HanJlin�Unit
U to 10,000 cubic ft. er min. 6.50 each 7.10 each 7.70 each
Over 10,000 cubic ft. er min. f 1.00 each 12.00 each 13.00 each
Eva orative cooler,not ortable 6.50 each 7.10 each 7.70 each
Ventilation fan connected to sin le duct 4.50 each 4.90 each 5.30 each
Ventilation s stem not art of heatin or air conditionin s stem 6.50 each 7.10 each 7.70 each
Installation of each hood served b mechanical exhaust 6.50 each 7.10 each 7.70 each
Incinerators
Installation or relocation of domestic incinerator 11.00 each 12.00 each 13.00 each
[nstallation or relocation of commercial or industrial type 45.00 each 48.90 each �3.00 each
incinerator
OTHER INSPECTIONS AND FEES
A liances re ulated b code but not in an other cate orv 6.50 each 7.10 each 7.70 each
Ins ection outside normal business hours 30.00/hr. 32.50/hr. 35.30/hr.
Re-inspection fees assessed under provisions of Section 108.8 30.00/hr. 32.50/hr. 35.30/hr.
C.B.C. �
[ns ection where no fee is indicated 30.00/hr. 32.50/hr. 35.30/hr.
Additional lan review re uired b chan es. 30.00/hr. 32.50/hr. 35.30/hr.
PL[IMBING PERMIT FEES
Permit Issuance I5.00 each 16.30 each 17.70 each
Su lemental Permit Issuance 4.50 each 4.90 each 5.30 each
UNIT FEE SCHEDULE
Plumbin fixture or tra 6.00 each 6.50 each 7.10 each
Buildin sewer or trailer ark sewer 15.00 each 16.30 each 17.70 each
Rainwater svstem 6.00 each 6.50 each 7.10 each
:��:.� a"'i�..i .�.. �' 1._1i.•I{•,'7..
....;....,�;�.... ` '•'
-�<<• ....c::� , .:, . ...
. �...:•..
.: _:�...�•..
Page 3 of 7
.
� ': >
,
;:
; ,:.+�I'I`�' �� 1��3��1�I� ; ..:...
,�: , �+�H�TILILE(l�`Ij'���Al�����I���T�A����
(�'e���riQunts�n d�ll�rs unles�other��e�ndic�at�d)
't`�P`E O��`�E flR.�EIt�TIC���t1RCF� '
��#RR��'F�EI
>:>::::.;::: 2
l�fl9� �l�199
8F1iTi�f,`E�HA�iG�::: ":°::::... :
Cess ool
22.50 each 24.40 each 26.50 each
Private Sewa e dis osal s stem 45.00 each 48.90 each 53.00 each
Water heater and/or vent 7.50 each 8.10 each 8.80 each
Industrial-waste re-treatment interce tor 12.00 each 13.00 each 14.10 each
Installation,alteration,or repair of water piping and or�vater
treatin e ui ment 3.00 each 3.20 each 3.50 each
Re air or alteration of draina e or vent i in 3.00 each 3.20 each 3.50 each
Lawn s rinkler s stem on anv one meter 9.00 each 9.80 each 10.60 each
.4tmos heric t e vacuum breakers
1 to 5 7.50 each 8.l0 each 8.80 each
Over 5 1.50 each 1.60 each L80 each
I3ack-flow rotection device
2 inches or smaller 7.50 each 8.10 each 8.80 each
Over 2 inches I5.00 each 16.30 each 17.70 each
Gas i in svstem
l to 4 3.00 each 3.20 each 3.50 each
5 or more .75 each .80 each .90 each
OTHER INSPECTIONS AND FEES
Ins ection outside normal business hours 30.00/hr. 32.50/hr. 35.30/hr.
Re-inspection fees assessed under provisions of Section 108.8 30.00/hr. 32.50/hr. 35.30/hr.
C.B.C.
Ins ection where no fee is indicated 30.00/hr. 32.50/hr. 35.30/hr.
Additional lan review re uired b chan es. 30.00/hr. 32.50/hr. 35.30/hr.
DEVELOPIVIENT SERVICES DEPARTMENT ELANNING>DIVISIbN
Abandonments(Includes Right-of-way Specialist's and Land Development Enginccr's time)
Right-of-waY 1,085 1,177 1.277
Easement 545 591 64 I
AJministrativc Permits
Administrative parcel map 370 401 435
Administrative parcel map amendment 165 179 l94
Administrative use pertnit 225 244 265
Administrative use pertnit amendment 150 163 I'77
Animal permit 45 49 53
Home occupation permit 45 49 53
Tree permit � 10/tree I Utree 12/tree
Appeals
Applicant 145 157 170
Other 85 92
Administrative permit(appeal by applicant)to BAR 30 33 36
Development Agreement Application 1,450 1,573 �,'7p7
Environmental Assessment and Negative Declaration/De Alinimis
Applied to all applications which are subject to CEQA 20%of 20%of 20%of
permit fee permit fee permit fee
Environmental Impact Report Processing
1 acre or less. 1,870 2,029 2,201
1.1 to 5 acres 2.240 2,430 �,...,,,2,(�3,7 _. .., .
_. ._ ._ ..... ....,
..
' "'• _ � . : ' +...F � �i
...•�..�... �...i ...e•.��•...�•...� �_.� ... .� e ... ... ...'
Page 4 of 7
, , ;: _ _: ; CI'I"3���;RE�3�?�1��'c ::
� ,
:
;
;.. .. ��I���i.1L�t)�`��E�AI�����I���H�R���
' (Fee amau�ts;�n dol��rs unI�s��t��er�v�Q�tttt��t�d)
; TI{P�fl��'�E fl�S�R�II���Aii�� ; �/I619$ I/��
�C11tR�1�t7'R��I :
; SERVI
___.._::....._.....:::.:..... . (`E��IA���._
5.1 to 10 acres 2,620 2,842 3,085
10.1 to 20 acres 3,365 3,651 3,961
20.1 to 40 acres 5,605 6,081 6,598
40.1 to 100 acres 7,480 " 8,116 8,806
For each 25 acres or fraction in excess of 100 acres 935 1,014 I,100
General Plan Amendments and Specific Plans
1 acre or less 1,280 ],389 1,507
l.l to 10 acres 2,560 2,778 3,014
10 ro 100 acres 3,655 3,966 4,303
Over 100 acres 5,490 6,294 6,829
Lot Splits(Includes Right-of-way Specialist's and Land Devclopment Engineer's time)
Lot spliblot merger amendment or extension 330 358 388
Major 2-to 4-parcel split not exempt from CEQA 545 591 641
Property-line adjustment 60 65 71
Ordinance Amendment(Text) 1,450 1,541 1,672
Rezonings
I acre or less 890 966 1,048
I.l to 10 acres 1,420 1,541 1,672
10 to ]00 acres 2,130 2,311 2,507
Over 100 acres 3,550 3,852 4.179
Sign Permits-Most signs do not require a permit. These permits are for additional squarc footage or increased height.
'I'emporary promotional advertising sign exempt from CEQA-no 50 54 59
property o�vner notification
Temporary promotional advertising sign exempt from 165 179 194
CEQA-property owner notification required
Permanent advertising sign exempt from CEQA-no property go g,� y4
owner notification
Permanent advertising sign exempt from CEQA-property owner 165 179 194
notification required
Temporary and permanent Exempt from CEQA 245 266 289
advertising issued by BAR or PC Not exempt from CEQA 330 358 388
Site Plan Reviews([ncludes Development Engineer's time)
1 acre or less 440 477 5 l8
l.l to 10 acres 730 792 859
Over 10 acres 1,470 1,595 1,731
Street Renaming Request
0 to 1,000 feet � 215 233 253
Over 1,000 feet 360 391 424
Subdivisions(Includes Right-of-way Specialist's and Land Development Engineer's time)
Subdivision and condominium conversions:
5 to 25 lots 1,165+6/lot 1,264+7/lot 1,371 +8/lot
26 to 50 lots 1,585+6/lot 1,720+7/tot 1,866+8/Iot
51 to 100 lots 2,220+6/lot 2,409+7/lot 2,614+S/lot
101 or more lots 2,545+6/lot 2,761 +7/lot 2,995+8/lot
Extension 450 488 529
Amendment 530 575 624
Reversion to acrea e 90 98 106
+"',�:::�....r.:. ..:r,'.:'.s::f�::. ..'�_!,s . .��...i..?,_
. ..,
..., . � • ;
...��...'€...�•..� •...'• ... ...� :.... ... .,. i �... ^�
Page 5 of 7
• ' '. ; ; `: ; ��`Y`� �� +'�1��1��'r
, _
f :
;
, >
,:..
. >, , . ..;.:.
; ��H�I��L�CI�`�'��S��'b���t�T��������� ;:
; ; ; (�`e�amQ�unfs:�n�n1l�rs i�uiles�o.#h�rwvi�e�nd�cat�ed�
: ::.:.>:::>.;.
'I`�PE flF FE�:�R SEF��I+CE�`fitiRGE �II�i19� �/��
F �L�RRE�TT FEEJ
; ......:.: .S�R�I�E.�iIAi���.
Planned development and cluster subdivisions:
Application 2,295+6/lot 2,490+7/lot 2,702+g/1ot
Finai plan review 230+6/lot 250+'7/lot 271 +8/(ot
Application f'or extension 690 749 813
Amendment 690 749 8 I 3
Vesting tentative maps:
Preliminary evaluation 455 494 536
Application 1,510+6/lot 1,638+7/lot 1 J77+8/1ot
Extension application 455 494 536
Amendment 455 494 536
Surface Mining/Reciamation Plans 2,300 2,496 2.708
Use Pcrmits(Includes Land Development Engineer's Time)
Apartment project:
First 4 units 405 439 476
5 to 49 units 510+5/unit 533+5/unit 578+6/lot
50 or more units 1,020+5/unit 1,107+5/unit 1.201+6/lot
Mobile home park 1,020+5/unit 1,107+5/unit 1,201+6/lot
Miscellaneous 240 260 282
Commercial and industrial new construction:
t acre or less 485 526 571
1.1 to 5 acres 645 700 760
5.1 to 10 acres 1,215 1,378 1,495
Over 10 acres 1,620 1,758 1.907
Amendment 240 260 282
Final plan review 300 326 354
Variances
Zoning exception 310 336 365
Major variance 465 505 54$
Variance amendment 465 505 548
Zoning excep[ion amendment 3l0 336 365
PUBLIC WORKS DEPARTMENT
Actual cost(direct Actual cost(direct Actual cost(direct
Land Development and Engineering Fee +57.5%overhead)with +71%overhead)with +71%overhead)with
cap at 2%of total project cap at 2%of total project cap at 2%of total project
Final Parcel Map 260 282 306
Grading Permit
50 to 100 yards 57 62
67
101 to 500 yards 92 100 lpg
501 to 1,000 yards 286 310 337
1,001 to 2,000 yards 340 369 400
2,001 to 3,000 yards 405 439 477
3,001 to 4,000 yards 467 507 550
4,001 to 5,000 yards 528 573 622
5,001 to 10,000yards 62g 6g� ��9
For each additional 5,000 yards or fraction thereof in excess 124 �35 �qb
of 10,000 vards
�_f�...:S t i:::• -_�..:'�';.��..? t_.1!_I ,t ...., �..� ,� ...
...
_.� ... ... ...' ... ... .�. i 1...F ... .:. �. '
Page 6 of 7
, ,
"�-�- , ,
• ` , _ CI7`3� C3�� R`�+�3�7►�1�T�
�_
;: :::::>::.
;:::>:.::. , ;
;::.:::.;. .. ,
. � ;:.;:.;:.::.: �+��I��3iUL�U�`�����iNb����I���T��It���
:::.. .::. ..:. .. .
,...>::>::::>:;:.;:::
>:.::.::.>:.;
;::;::.:>::::;:::;::::;::>:.;::...::.:.:::.:
,.:�. ;:>,, > .:,.. . : ;:.>::...... ...... .......:....
....:.::.:>:;::;:;:::::>.::::::>::::. .::::>:::>:::::<:: ;:::;:: ��:�
;
{ ;mQ�xnts;�n��r1l��s u.nIess atherw��e�n.d�cat�ed}
;:.;:.;.. ::.;::.:.
;.::,::>::::: .:;::. :.::.
,.
rt �`.. �
>::::..:
�u �. � ��t ;: ;:<
;;;:;:.
r. :'I`l!P`F: .�:.Ts'��. I�:S�R�I��'.. : AIiGE >:..::.::;:::::>:::'... .:::.;:::. :.
Q .... . .� G`� , '`2f1619� ..:. ;:::::::�. . .
>::>::>:.>: ,.........._ .................:. ..... ....::>::>::.........l.......:::::::>s;:;.;;:.::;:::
>��R:�I.:;. :.:.:> . .: <
�.`E.�HA�
C�::::>::::«:>:::::<:>::::;:::::>:;::::>::::>::>:::<:;::::>::::>::>::::»:<:>::»::;:>;:>:::>::::>:::<:::>::::>:::>::>:<:>::>::>::>::::>::»::::>:::::>::<::
Grading Permit—Clearing(for grading)
1 to 2 acres 62 67 73
2.1 to 5 acres 92 ]00 108
51 to 10 acres 187 ` 203 220
For each additional 5 acres of fraction thereof in excess of 30 33 35
10 acres
Appeals for Grading Permit Conditions/Fines 50 54 59
Encroachment Permit Minimum fee of 52 up to Minimum fee of 56 up to Minimum fee of 61 up to
5%construction cost 5%construction cost 5%construction cost
Traffic Im act Fee- Ci ide Outside Dana Drive Benefit District
Fee per single-family residence 800.00 868.00 942.00
Fee per multiple-family residence 563.00 611.00 663.00
Fee per-square-foot commercial bui(ding 2.70 2.93 3.18
Fee per-square-foot office building 2.01 2.18 237
Fee per-square-foot industrial building 0.00 0.00 0.00
Traffic Im act Fee-Dana Drive Benefit Fee Within Dana District
Fee per single-family residence 992.30 1,077.00 1,(68.00
Fee per multiple-f'amily residence 695.45 755.00 819.00
Fee per-square-foot commercial building 3.87 4.20 4.56
Fee per-square-foot office building 2.48 2.69 2.92
Fee er-s uare-foot industrial buildin 0.42 0.46 0.58
11-12-97
STAF1DevProcs&ImpctFees.TBL
_ . ^��'•�f^ti::. _1..,.��•::.,....
- ....� :...,:.. .r i...+ .
Page 7 of 7