Loading...
HomeMy WebLinkAboutReso 97-202 - Amending Scedule of Fees and Service Charges Pertaining to Development Processing Fees and Traffic Impact Fees� ' , ' ' . . � � RESOLUTION NO. 97- ZO Z A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING AMENDING ITS SCHEDULE OF FEES AND SERVICE CHARGES PERTAINING TO DEVELOPMENT PROCESSING FEES AND TRAFFIC IMPACT FEES. WHEREAS, on October 4, 1988, by Resolution 88-364, the City Council adopted a Schedule of Fees and Service Charges (Schedule), which has been amended from time-to-time; and WHEREAS, pursuant to said resolution, the City Manager is authorized and directed to revise, supplement and maintain the Schedule so that it will be, to the greatest extent possible, a comprehensive list of fees for City permits and services; and that a fee that is not on the Schedule will not be invalid but should be made a part thereof at the earliest possible time; and WHEREAS, it is the desire of the City Council that all City services be self-supporting and not subsidized as to their operational costs by revenues raised through the imposition of ad valorem taxes or other sources of revenue; and WHEREAS, on November 4, 1997, the City Council directed staff to schedule and advertise for public hearing various increases in development processing and impact fees; the appropriate public notice has been published; and WHEREAS, the proposed increases in development processing fees and traffic impact fees as recommended by City staff and the Development Fee Review Committee are attached hereto; and WHEREAS, a public hearing regarding the proposed increases in development processing fees and traffic impact fees was held on this date, prior to the adoption of this resolution; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF REDDING FINDS, DETERMINES AND RESOLVES THAT: 1. With respect to the proposed increases in development processing fees and traffic impact fees, � the City Council finds and determines that: � A. The fees are reasonably related to or are less than the costs of providing the specific \t services for which the fees are to be charged, and are necessary to cover the City's 1� costs of providing the services. � B. The provisions of the California Environmental Quality Act do not apply to the fees, � which are for the purpose of ineeting operating expenses, or a portion thereof. � C. The proposed fees will not exceed the governmental costs in providing the services in fiscal year 1997/98 and following. AMENDED BY RESOLUTION N0. 2003-167 '::+'�?i::::r::z '••''•:t`::•`::• , { .,_',....�-._'•...'• ;��'I_�' �'' �...��..f�...'�... � � � � � 2. The City's Schedule of Fees and Service Charges be amended to include the development processing fees and the traffic impact fees to be charged effective February 16, 1998, and January l, 1999, as shown on the Schedule of Fees and Charges attached hereto and made a part hereof by reference. 3. On the first day of July, 1999, and on every July 1 thereafter, the City's development processing fees shall automatically increase by an amount equal to the latest published annual increase in the Consumer Price Index (CPI) for All Urban Consumers, mid-size western cities. 4. On ttie first day of July, 1999, and on every July 1 thereafter, the City's traffic impact fees shall automatically increase by an amount equal to the latest published annual increase in the Engineering News Record Cost of Construction Index (CCI). I HEREBY CERTIFY that the foregoing resolution was introduced, read and adopted at a regular meeting of the City Council on the 18th day of November, 1997, by the following vote: AYES: COUNCII. MEMBERS: Anderson, Kehoe, McGeorge and Murray NOES: COUNCId.MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None N , ayor Attest: Form Approved: ' �,��,� zZ�e�%���``' �- Connie Strohmayer, City er W. Leonard Wingate, !� ty Attorney 2 ,_.,;...F.'1="= �';.�-;r::•d:::i '..�t...�... . '...'i...'�... �••i . �"""'."'." ,: +C�`I`� �T R���7►��� : � , , ;: ;:: �+�HEI?UL�flF�'�E�AI�D��I��I���Ht�R��� ; ;: :.::. ;<:.;;;:: >;;:.. , , , >::;.;<.;::>: ::>::::::>: .;;::>:::>::::.. �ee�mQur�t�<�n:d��I��s.>�less.oth�e ;::::. ( ;>< _ r��se��dieat�ed} ;: ...> ;:.;:.;:.. .. �r�a����fl�s������c���� ���������1 2ti�1�� �1�9 ; ; :;.;:...;::.:.::.;:.; >;;;:.... > ; ..s���e����� FIRE DEPARTMENT Building Plan Check Fee 120 130 141 Sprinkler Plan Check Fee 0 70 76 Fire Alarm Plan Check Fee 0 70 76 Sprinkler System Inspection 120 130 141 DE�ELOPMENT SERVICES DEPARTMENT BUILDING DIVISIQN BUILDING:'PERMIT FEES 1 to 500 15.00 16.30 17.70 15.00 plus 2.00 for each 16.30 plus 2.20 for each 17.70 plus 2.40 f'or each 501 to 2,000 additional 100 over tlie additional 100 over the additionai 100 over the first 500 first 500 tirst 500 45.00 plus 9.00 for each 49.30 plus 9.80 for each 53.70 plus 10.60 for 2,001 to 25,000 additional 1,000 over the additiona( 1,000 over the each additional 1,000 first 2,000 first 2,000 over tlie first 2,000 252.00 plus 6.50 for 274.70 plus 7.10 for 297.50 plus 7.70 for 25,001 to 50,000 each additional 1,000 each additional 1,000 each additional 1,000 over the first 25.000 over the first 25,000 over the first 25,000 _,_. _ 414.50 plus 4.50 for 452.20 plus 4.80 for 490.00 plus 5.30 for 50,001 to 100,000 each additional 1,000 each additional 1,000 each additional 1,000 over the first 50,000 over the first 50,000 over the first 50,000 639.50 plus 3.50 for 697.20 plus 3.80 for 755.00 plus 4.10 for 100,001 to 500,000 each additional 1,000 each additional 1,000 each additional 1,000 over the first 100,000 over the ftrst 100,000 over the tirst 100,000 2,039.50 plus 3.00 for 2,217.20 plus 3.30 for 2,395.00 plus 3.50 for 500,001 to 1,000,000 each additional 1,000 each additional I,000 each additional 1,000 over the first 500,000 over the tirst 500,000 over the first 500.000 3,539.50 plus 2.00 for 3,867.20 plus 2.20 for 4,145.00 plus 2.40 for 1,000,001 and Up each additional 1,000 each additional 1,000 each additional 1,000 over the first I,OOQ000 over the first I,000,000 over the first 1,000.000 OTHER INSPECTIONS AND FEES Inspection outside of normal business hours 30.00/hr 32.50/hr 35.30/hr Re-inspection fees assessed under provisions of Section 108.8 30.00/hr 32.50/hr 35.30/hr C.B.C. Ins ections for which no fee is s ecificall indicated 30.00/hr 32.50/hr 35.30/hr Additional plan review required by changes,additions,or revision 30.00/hr 32.50/hr 35.30/hr to a roved lans Pian Review 65%of the Building 65%of the Building 65%of the Building Permit Fee Permit Fee Permit Fee ELECTRIC'PERMIT FEES. Permit Issuance-each ermit 15.00 16.30 17.70 Each su lemental ermit 4.50 4.90 5.30 SYSTEM FEE SCHEDULE New Residential Buildin s Multi Famii .03 er s .ft. .035 er s .ft. .040 er s .ft. Sin le-two famil .035 er s .ft. .040 er s .ft. .045 er s .ft. ...,...,:�,:•ti:::; ... � :... ., ....; :.. ....�. _:e�:�+ ' . , ; � ;' !...�'... _ ' .„., '", ,..,f,,,f'.;;s .,.'.,..��•_.'�...� _.�..�.:. ... �...< Page I of 7 ` '' ;�I'I`� Q� I��#��1�� ;::... . , ; ' . .. ; ...S�H��UI�E Q��"���AI�D��I��I�� �HAI���� ;:< .:: ,: (Ree amounts:�n c�oll�rs unless otherwi�e�nii�rat�ed ;: ; ; ;: . ;.;:::.;:::: ::.::..;....: ;::.>:.:::>::::.: > ;. :. }.. .;::. ;. ; �r�fl����o�s�R�i�����c� 21�t19� �I�� �ui�����,���I ,::.;. �� �I�E G�IAR��: New Nonresidential Buildin s 3.000 s .ft.or less .045 er s .ft. .050 er s .ft. .055 er s .ft. 3,001 to 10.000 s .ft. .035 er s .ft. .040 er s .ft. .045 er s .ft. Over 10,000 s .ft. .025 er s .ft. .030 er s .ft. .035 er s .ft. Private Swimmin Pools 30.00 each 32.60 each 3530 each Carnivals and Circuses Electrical enerators and electricallv driven rides I5.00 each 16.30 each 17.70 each Mechanically driven rides and attractions or displays with electric 4.50 each 4.90 each 5.30 each li htin S stem of area and booth li htin 4.50 each 4.90 each 5.30 each Tem orarv Power Service Power ole or edestal 15.00 16.30 I7J0 Distribution svstem 7.50 8.10 8.80 UNIT FCE SCHEDULE Rece tacic,Switch,and Li htin Outlets First 20 .75 each .80 each .90 each Additional Outlets .45 each .50 each .55 each Li htin Fixtures First 20 .75 each .80 each .90 each Additional Fixtures .45 each .50 each 55 each Pole or latforn�Li htin tixtures .75 each .80 each 90 each Theatrical t e Li h[in Fixtures JS each .80 each .90 each A lianccs Residential A liances 3.00 each 3.25 each 3.50 each Non-residential A liances 3.00 each 3.25 each 3.50 each Power A aratus er HP,kW,KAVA or KVAR U to and includin I 3.00 each 3.25 each 3.50 each Over 1 and not over 10 7.50 each 8.l5 each A.80 each Over 10 and not over 50 I5.00 each 16.30 each 17.70 each Over 50 and not over 100 30.00 each 32.50 each 35.50 each Over 100 45.00 each 48.90 each 53.00 each Buswavs-Trollev and lu -in tv e 4.50 each 4.70 each 5.30 each Si ns,Outline Li htin ,and n4ar uees Su lied from one branch circuit 15.00 each 16.30 each 17.70 each Additional branch circuits er si n 3.00 each 3.25 each 3.50 each Services � 600 volts or less and not over 200 am eres I 8.50 each 20.10 each 21.80 each 600 volts or less and over 200 am eres to I,000 am eres 37.50 each 40.70 each 44.15 each Over 600 volts or over 1,00 am eres 75.00 each 81.50 each 88.50 each Misc.Apparatus,Conduits,and Conductors for which a permit is i 1 �Z �� re uired but no other fees is set OTHER INSPECTIONS AND FEES [ns ection outside normal business hours 30.00/hr. 32.50/hr. 35.30/hr. Re-inspection fees assessed under provisions of Section 108.8 30.00/hr. 32.50/hr. 35.30/hr. C.B.C. Ins ections for which no fee is set 30.00/hr. 32.50/hr. 35.30/hr. Additional lan review re uired b chan es 30.00/hr. 32.50/hr. „, 3�.a0%�r. :..,,..... ...: ... .. .. -. . � `^t�,••�€ :...., ...�•.::�-...��.. : ,3 li...`•t::� ...��...� .. , ...�... Page 2 of 7 ; > �I`I"�' ��' 1���?�1��' , ; , . , �+��-I�II�UL�QF�"����1�D��R�I�����R���, t�`��am;Qun#s�n doll�r�untess otherr�ise�ndtcat�ed) ;.:::. ;::.;... C[�I�R��i'�'F��1 �r�Q����o�sr���rc�e�A�c� ' : 2/�:�J9� �/�99 ;:.:: ; s�uic�.c�a����< . .. MECHAN7CAL PERMIT FEES Permit Issuance 15.00 each 16.30 each 17.70 each Su lemental ermit issuance 4.50 each 4.90 each 5.30 each UNIT FEE SCHEDULE Installation of force air or ravit t e furnace or burner U to and includin 100,000 Btu/h 9.00 each 9.80 each 10.60 each Over I OQ000 Btu/h 1 L00 each I 1.00 each I 1.00 each [nstallation or relocation of floor furnace 9.00 each 9.80 each 10.60 each Installation or relocation of suspended heater,recessed wall heater 9.00 each 9.80 each 10.60 each or floor mounted heater tnstallation,relocation or re lacement of a liance vent 4.50 each 4.90 each 5.30 each Repair or alteration of,or addition of each heating appliance, refrigeration unit,cooling unit,absorption unit or each hea[ing, 9.00 each 9.80 each 10.60 each cooling,absorption or evaporative cooling system including installation of controls Installation or relocation of boiler or com ressor U to 3 horse ower or 100,000 Btu/h 9.00 each 9.80 each 10.60 each U to (5 horse ower or 500.000 Btu/h 16.50 each (7.90 each 19.50 each U to 30 horse ower or 1,000,000 Btu/h 22.50 each 24.40 each 26.50 each U to 50 horse ower or 1,750,000 Btu/h 33.50 each 36.40 each 39.50 each Over 50 horse ower or 1,750.000 Btu/h 56.00 each 60.80 each 66.00 each Air-HanJlin�Unit U to 10,000 cubic ft. er min. 6.50 each 7.10 each 7.70 each Over 10,000 cubic ft. er min. f 1.00 each 12.00 each 13.00 each Eva orative cooler,not ortable 6.50 each 7.10 each 7.70 each Ventilation fan connected to sin le duct 4.50 each 4.90 each 5.30 each Ventilation s stem not art of heatin or air conditionin s stem 6.50 each 7.10 each 7.70 each Installation of each hood served b mechanical exhaust 6.50 each 7.10 each 7.70 each Incinerators Installation or relocation of domestic incinerator 11.00 each 12.00 each 13.00 each [nstallation or relocation of commercial or industrial type 45.00 each 48.90 each �3.00 each incinerator OTHER INSPECTIONS AND FEES A liances re ulated b code but not in an other cate orv 6.50 each 7.10 each 7.70 each Ins ection outside normal business hours 30.00/hr. 32.50/hr. 35.30/hr. Re-inspection fees assessed under provisions of Section 108.8 30.00/hr. 32.50/hr. 35.30/hr. C.B.C. � [ns ection where no fee is indicated 30.00/hr. 32.50/hr. 35.30/hr. Additional lan review re uired b chan es. 30.00/hr. 32.50/hr. 35.30/hr. PL[IMBING PERMIT FEES Permit Issuance I5.00 each 16.30 each 17.70 each Su lemental Permit Issuance 4.50 each 4.90 each 5.30 each UNIT FEE SCHEDULE Plumbin fixture or tra 6.00 each 6.50 each 7.10 each Buildin sewer or trailer ark sewer 15.00 each 16.30 each 17.70 each Rainwater svstem 6.00 each 6.50 each 7.10 each :��:.� a"'i�..i .�.. �' 1._1i.•I{•,'7.. ....;....,�;�.... ` '•' -�<<• ....c::� , .:, . ... . �...:•.. .: _:�...�•.. Page 3 of 7 . � ': > , ;: ; ,:.+�I'I`�' �� 1��3��1�I� ; ..:... ,�: , �+�H�TILILE(l�`Ij'���Al�����I���T�A���� (�'e���riQunts�n d�ll�rs unles�other��e�ndic�at�d) 't`�P`E O��`�E flR.�EIt�TIC���t1RCF� ' ��#RR��'F�EI >:>::::.;::: 2 l�fl9� �l�199 8F1iTi�f,`E�HA�iG�::: ":°::::... : Cess ool 22.50 each 24.40 each 26.50 each Private Sewa e dis osal s stem 45.00 each 48.90 each 53.00 each Water heater and/or vent 7.50 each 8.10 each 8.80 each Industrial-waste re-treatment interce tor 12.00 each 13.00 each 14.10 each Installation,alteration,or repair of water piping and or�vater treatin e ui ment 3.00 each 3.20 each 3.50 each Re air or alteration of draina e or vent i in 3.00 each 3.20 each 3.50 each Lawn s rinkler s stem on anv one meter 9.00 each 9.80 each 10.60 each .4tmos heric t e vacuum breakers 1 to 5 7.50 each 8.l0 each 8.80 each Over 5 1.50 each 1.60 each L80 each I3ack-flow rotection device 2 inches or smaller 7.50 each 8.10 each 8.80 each Over 2 inches I5.00 each 16.30 each 17.70 each Gas i in svstem l to 4 3.00 each 3.20 each 3.50 each 5 or more .75 each .80 each .90 each OTHER INSPECTIONS AND FEES Ins ection outside normal business hours 30.00/hr. 32.50/hr. 35.30/hr. Re-inspection fees assessed under provisions of Section 108.8 30.00/hr. 32.50/hr. 35.30/hr. C.B.C. Ins ection where no fee is indicated 30.00/hr. 32.50/hr. 35.30/hr. Additional lan review re uired b chan es. 30.00/hr. 32.50/hr. 35.30/hr. DEVELOPIVIENT SERVICES DEPARTMENT ELANNING>DIVISIbN Abandonments(Includes Right-of-way Specialist's and Land Development Enginccr's time) Right-of-waY 1,085 1,177 1.277 Easement 545 591 64 I AJministrativc Permits Administrative parcel map 370 401 435 Administrative parcel map amendment 165 179 l94 Administrative use pertnit 225 244 265 Administrative use pertnit amendment 150 163 I'77 Animal permit 45 49 53 Home occupation permit 45 49 53 Tree permit � 10/tree I Utree 12/tree Appeals Applicant 145 157 170 Other 85 92 Administrative permit(appeal by applicant)to BAR 30 33 36 Development Agreement Application 1,450 1,573 �,'7p7 Environmental Assessment and Negative Declaration/De Alinimis Applied to all applications which are subject to CEQA 20%of 20%of 20%of permit fee permit fee permit fee Environmental Impact Report Processing 1 acre or less. 1,870 2,029 2,201 1.1 to 5 acres 2.240 2,430 �,...,,,2,(�3,7 _. .., . _. ._ ._ ..... ...., .. ' "'• _ � . : ' +...F � �i ...•�..�... �...i ...e•.��•...�•...� �_.� ... .� e ... ... ...' Page 4 of 7 , , ;: _ _: ; CI'I"3���;RE�3�?�1��'c :: � , : ; ;.. .. ��I���i.1L�t)�`��E�AI�����I���H�R��� ' (Fee amau�ts;�n dol��rs unI�s��t��er�v�Q�tttt��t�d) ; TI{P�fl��'�E fl�S�R�II���Aii�� ; �/I619$ I/�� �C11tR�1�t7'R��I : ; SERVI ___.._::....._.....:::.:..... . (`E��IA���._ 5.1 to 10 acres 2,620 2,842 3,085 10.1 to 20 acres 3,365 3,651 3,961 20.1 to 40 acres 5,605 6,081 6,598 40.1 to 100 acres 7,480 " 8,116 8,806 For each 25 acres or fraction in excess of 100 acres 935 1,014 I,100 General Plan Amendments and Specific Plans 1 acre or less 1,280 ],389 1,507 l.l to 10 acres 2,560 2,778 3,014 10 ro 100 acres 3,655 3,966 4,303 Over 100 acres 5,490 6,294 6,829 Lot Splits(Includes Right-of-way Specialist's and Land Devclopment Engineer's time) Lot spliblot merger amendment or extension 330 358 388 Major 2-to 4-parcel split not exempt from CEQA 545 591 641 Property-line adjustment 60 65 71 Ordinance Amendment(Text) 1,450 1,541 1,672 Rezonings I acre or less 890 966 1,048 I.l to 10 acres 1,420 1,541 1,672 10 to ]00 acres 2,130 2,311 2,507 Over 100 acres 3,550 3,852 4.179 Sign Permits-Most signs do not require a permit. These permits are for additional squarc footage or increased height. 'I'emporary promotional advertising sign exempt from CEQA-no 50 54 59 property o�vner notification Temporary promotional advertising sign exempt from 165 179 194 CEQA-property owner notification required Permanent advertising sign exempt from CEQA-no property go g,� y4 owner notification Permanent advertising sign exempt from CEQA-property owner 165 179 194 notification required Temporary and permanent Exempt from CEQA 245 266 289 advertising issued by BAR or PC Not exempt from CEQA 330 358 388 Site Plan Reviews([ncludes Development Engineer's time) 1 acre or less 440 477 5 l8 l.l to 10 acres 730 792 859 Over 10 acres 1,470 1,595 1,731 Street Renaming Request 0 to 1,000 feet � 215 233 253 Over 1,000 feet 360 391 424 Subdivisions(Includes Right-of-way Specialist's and Land Development Engineer's time) Subdivision and condominium conversions: 5 to 25 lots 1,165+6/lot 1,264+7/lot 1,371 +8/lot 26 to 50 lots 1,585+6/lot 1,720+7/tot 1,866+8/Iot 51 to 100 lots 2,220+6/lot 2,409+7/lot 2,614+S/lot 101 or more lots 2,545+6/lot 2,761 +7/lot 2,995+8/lot Extension 450 488 529 Amendment 530 575 624 Reversion to acrea e 90 98 106 +"',�:::�....r.:. ..:r,'.:'.s::f�::. ..'�_!,s . .��...i..?,_ . .., ..., . � • ; ...��...'€...�•..� •...'• ... ...� :.... ... .,. i �... ^� Page 5 of 7 • ' '. ; ; `: ; ��`Y`� �� +'�1��1��'r , _ f : ; , > ,:.. . >, , . ..;.:. ; ��H�I��L�CI�`�'��S��'b���t�T��������� ;: ; ; ; (�`e�amQ�unfs:�n�n1l�rs i�uiles�o.#h�rwvi�e�nd�cat�ed� : ::.:.>:::>.;. 'I`�PE flF FE�:�R SEF��I+CE�`fitiRGE �II�i19� �/�� F �L�RRE�TT FEEJ ; ......:.: .S�R�I�E.�iIAi���. Planned development and cluster subdivisions: Application 2,295+6/lot 2,490+7/lot 2,702+g/1ot Finai plan review 230+6/lot 250+'7/lot 271 +8/(ot Application f'or extension 690 749 813 Amendment 690 749 8 I 3 Vesting tentative maps: Preliminary evaluation 455 494 536 Application 1,510+6/lot 1,638+7/lot 1 J77+8/1ot Extension application 455 494 536 Amendment 455 494 536 Surface Mining/Reciamation Plans 2,300 2,496 2.708 Use Pcrmits(Includes Land Development Engineer's Time) Apartment project: First 4 units 405 439 476 5 to 49 units 510+5/unit 533+5/unit 578+6/lot 50 or more units 1,020+5/unit 1,107+5/unit 1.201+6/lot Mobile home park 1,020+5/unit 1,107+5/unit 1,201+6/lot Miscellaneous 240 260 282 Commercial and industrial new construction: t acre or less 485 526 571 1.1 to 5 acres 645 700 760 5.1 to 10 acres 1,215 1,378 1,495 Over 10 acres 1,620 1,758 1.907 Amendment 240 260 282 Final plan review 300 326 354 Variances Zoning exception 310 336 365 Major variance 465 505 54$ Variance amendment 465 505 548 Zoning excep[ion amendment 3l0 336 365 PUBLIC WORKS DEPARTMENT Actual cost(direct Actual cost(direct Actual cost(direct Land Development and Engineering Fee +57.5%overhead)with +71%overhead)with +71%overhead)with cap at 2%of total project cap at 2%of total project cap at 2%of total project Final Parcel Map 260 282 306 Grading Permit 50 to 100 yards 57 62 67 101 to 500 yards 92 100 lpg 501 to 1,000 yards 286 310 337 1,001 to 2,000 yards 340 369 400 2,001 to 3,000 yards 405 439 477 3,001 to 4,000 yards 467 507 550 4,001 to 5,000 yards 528 573 622 5,001 to 10,000yards 62g 6g� ��9 For each additional 5,000 yards or fraction thereof in excess 124 �35 �qb of 10,000 vards �_f�...:S t i:::• -_�..:'�';.��..? t_.1!_I ,t ...., �..� ,� ... ... _.� ... ... ...' ... ... .�. i 1...F ... .:. �. ' Page 6 of 7 , , "�-�- , , • ` , _ CI7`3� C3�� R`�+�3�7►�1�T� �_ ;: :::::>::. ;:::>:.::. , ; ;::.:::.;. .. , . � ;:.;:.;:.::.: �+��I��3iUL�U�`�����iNb����I���T��It��� :::.. .::. ..:. .. . ,...>::>::::>:;:.;::: >:.::.::.>:.; ;::;::.:>::::;:::;::::;::>:.;::...::.:.:::.: ,.:�. ;:>,, > .:,.. . : ;:.>::...... ...... .......:.... ....:.::.:>:;::;:;:::::>.::::::>::::. .::::>:::>:::::<:: ;:::;:: ��:� ; { ;mQ�xnts;�n��r1l��s u.nIess atherw��e�n.d�cat�ed} ;:.;:.;.. ::.;::.:. ;.::,::>::::: .:;::. :.::. ,. rt �`.. � >::::..: �u �. � ��t ;: ;:< ;;;:;:. r. :'I`l!P`F: .�:.Ts'��. I�:S�R�I��'.. : AIiGE >:..::.::;:::::>:::'... .:::.;:::. :. Q .... . .� G`� , '`2f1619� ..:. ;:::::::�. . . >::>::>:.>: ,.........._ .................:. ..... ....::>::>::.........l.......:::::::>s;:;.;;:.::;::: >��R:�I.:;. :.:.:> . .: < �.`E.�HA� C�::::>::::«:>:::::<:>::::;:::::>:;::::>::::>::>:::<:;::::>::::>::>::::»:<:>::»::;:>;:>:::>::::>:::<:::>::::>:::>::>:<:>::>::>::>::::>::»::::>:::::>::<:: Grading Permit—Clearing(for grading) 1 to 2 acres 62 67 73 2.1 to 5 acres 92 ]00 108 51 to 10 acres 187 ` 203 220 For each additional 5 acres of fraction thereof in excess of 30 33 35 10 acres Appeals for Grading Permit Conditions/Fines 50 54 59 Encroachment Permit Minimum fee of 52 up to Minimum fee of 56 up to Minimum fee of 61 up to 5%construction cost 5%construction cost 5%construction cost Traffic Im act Fee- Ci ide Outside Dana Drive Benefit District Fee per single-family residence 800.00 868.00 942.00 Fee per multiple-family residence 563.00 611.00 663.00 Fee per-square-foot commercial bui(ding 2.70 2.93 3.18 Fee per-square-foot office building 2.01 2.18 237 Fee per-square-foot industrial building 0.00 0.00 0.00 Traffic Im act Fee-Dana Drive Benefit Fee Within Dana District Fee per single-family residence 992.30 1,077.00 1,(68.00 Fee per multiple-f'amily residence 695.45 755.00 819.00 Fee per-square-foot commercial building 3.87 4.20 4.56 Fee per-square-foot office building 2.48 2.69 2.92 Fee er-s uare-foot industrial buildin 0.42 0.46 0.58 11-12-97 STAF1DevProcs&ImpctFees.TBL _ . ^��'•�f^ti::. _1..,.��•::.,.... - ....� :...,:.. .r i...+ . Page 7 of 7