HomeMy WebLinkAboutReso 99-105 - Amending its Schedule of Fees & Service Charges • �
RESOLUTION NO. 99-�j�
A RESOLUTION OF THE CITY COUNCIL OF TI3E CITY
OF REDDING AMENDING ITS SCHEDULE OF FEES AND
SERVICE CHARGES.
WAEREAS:
A. On October 4, 1988, by Resolution 88-364, the City Council adopted a
Schedule of Fees and Service Charges (Schedule), which has been subsequently amended from
time-to-time.
B. Pursuant to said resolution, the City Manager is authorized and directed to
revise, supplement and maintain the Schedule so that it will be, to the greatest extent possible,
a comprehensive list of fees for City permits and services; and that a fee that is not on the
Schedule will not be invalid but should be made a part thereof at the earliest possible time.
C. It is the desire of the City Council that all City services be self-supporting and
not subsidized as to their operational costs by revenues raised through the imposition of ad
valorem taxes or other sources of revenue.
D. On an annual basis and in accordance with City Council Policy 802, on July 6,
1999, the Finarice Division submitted to the City Council proposed increases and changes in
the Schedule as indicated in bold type and overstriking in the Schedule attached and made a
part hereof.
E. A public hearing on the proposed increases and changes was held on this date,
prior to the adoption of this resolution.
NOW, THEREFORE, the City Council of the City of Redding FINDS,
DETERMINES, and RESOLVES as follows:
1. With respect to the proposed changes in fees and charges and/or new fees as
indicated in bold type and overstriking in the attached Schedule, the City Council finds and
determines that:
a. The fees and charges previously established by resolution continue to be
reasonably related to the cost of providing the specific services for which the
fees are charged, except as modified herein. The modifications reflect the
increases or decreases in the costs of providing the specific services related to
the charges.
b. The new fees are reasonably related to the cost of providing the specific service
for which the fee is to be charged, and is necessary to cover the City's costs of
providing the service.
c. The provisions of the California Environmental Quality Act do not apply to the
new or increased fees, which are for the purpose of ineeting operating expenses .�
or a portion thereof. I�
��
�
��
� �
d. The proposed new fees and increases will not exceed the governmental costs in
providing said services in fiscal year 1999-2000.
2. That the fees and charges be amended as indicated in bold type and overstriking
in the attached Schedule of Fees and Service Charges, to cover the City's costs of providing
the services.
I HEREBY CERTIFY that the foregoing resolution was introduced, read and adopted
at a regular meeting of the City Council on the 20th day of July, 1999, by the following vote:
AYES: COtTNCILMEIVIBERS: Cibula, Kight, McGeorge, Pohlmeyer and Anderson
NOES: COiTNCIL MEMBERS: None
ABSENT: COiJNCIL MEMBERS: None
ABSTAIN: COiJNCIL MEMB�RS: None
Q .e,�.-s�v�
OBERT C. ANDERSON, Mayor
Attest:
��''�-'�.� d " _
C^ .
��i� Connie Strohnttzyer, C ty Clerk
Form Approved:
������-t-, ,?�"
.�'�`� '� ���
W. Leonard Wingate,'City Attorney
2
• �
CITY OF REDDING
SCHEDULE OF
FEES AND
SERVICE CHARGES
DEPARTMENT OF ADMINISTRATIVE SERVICE
FINANCE DIVISION
• •
CITY OF REDDING
SCHEDULE OF FEES
AND SERVICE CHARGES
Table of Contents
CityClerk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
City Treasurer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Community Services Department
Convention Center . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Recreation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Support Services Department
Utility Customer Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
_ Electric Department . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Fire Department . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Development Services Department
Airports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Geographical Information Sytems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Building Division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Planning Division . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Police Department . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Public Works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Solid Waste Transfer/Recycling Facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
� � Page ]
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF PEE OR RESOLUTION
SERVICE CHARGE FEE/SERVICI;CHARGE OR AUTHORITY
ORD W ANCE
CITY CLERK:
Business License I�ee
Delinyuency Penalty 10%per month Ord. 1935 R.M.C.6.02.180
Noncompliance Penalty 25%of license fee Ord. 2149
Duplicate License 10
Dog License Fee: Reso 97-65 R.M.C.7.12.060
Unaltered:
l-yearlicense 15+7 surcharge
2-yearlicense ?8+?surcharge
3-yzar Iicense 3q+2 curcharge
Spayed or neutered:
1-year license 7.50
2-year license 14
3-yearlicense l7
Replacement tag 2
Fees to seniors %above fees
Partial year(after 2/28),1-year license only %above fees
Late Peualty Fee �5
Deposit for redemption of impounded dog for 25 Ord. 1960 R.M.C.716.070
which rabies vaccination is re uired
Dog Ke��el License Reso 97-65 R.M.0 7.12.200
0-10 dogs 51(51►+CPI)
11 or more dogs 102(100+CPI) R.M.0 7.12.210
Do Kennel License Penal Fee l5
Handbill Permit R.M.0 636.110
Permit Fee 50
Securi D osit 250
Filing Fee for Notice of[ntent to Reso.90-224 E.C.§9202(b)
Circulate Petition in Munici al Election 200
Photocopies 0.25/page Reso.91-104 Proposition 4
Photocopies ofPPPC docume�ts 0.10/page " G.C.§81008(a)
Photocopies from microfiche/micro5lm 0.55/page Reso.93-280 Proposition 4
Photoco ies from a edure cards 2.00/ a e " Pro osition 4
Solicitor and Peddler Permit Fin e rint Fee 13.50+DOJ fees Reso.91-249 Pro osition 4
Parking permits: Reso.88-434 R.M.C. 11.28.070
Downtown Mall 46(45+CPI)
Public arldn lots 31 30+CPI
Coustruction Parking Meter Hoods 5 dep per hood+10/quarter per hood Ord 967 R.M.C. 11.28.090
Utili Parkin Meter Hoods 5 de er hood+10/ uarter Reso 96-25 &11.29.100
Closin out sale ermit sale lastin over 60 da s 25 for 30-da extension Ord.609 R.M.C.6.34.050
Publications and Documents: Not required
City Conncil agenda 31(30+CPI)/year
City Council minutes 92(90+CPI)/year
List of business licenses,complete 41(40+CPI)
List of business licenses,partial S/page
Business address labels 26(25+CPI)for computer setup
+4 per 1,1100 or
2l(20+CPI)/small labels:
OR+5 per 1,U00
or 26(25+CPI)/large labels
I,ist of registered voters 1 per 1,000 names
Business License List 43 42+CPI +cost of diskettes
� � Page 2
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FrE/SF..RVICE CHARGE OR AUTHORTTY
o�nva,tvc�
Meeting Rooms: Minute Order Proposition 4
City Council Chambers dated 4/6/63
I-4 hours 102(100+CPI)
4.1 or more hours/dsy 205(200+CPI)
i=d-honrr -5�
. �
� �
� -i5
. r�}
Corporation Yard Training Room Reso.98-IOl
1-4 hours �5
4.1 or mor hour�/da 50
� • Page 3
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated)
LAST UPDATE
TYP�OF FEF OR RESOLUTION
SERVICE CI3ARGE FF.,E/SERVICE CHARGE OR AUTHORITY
ORDINANCE
CITY TREASURER:
Assessment Splits(resulting from parcel splits) Reso.9R-101 Proposition 4
Two-to four-way spGts 40(39+CPI)
Each additional lot over four in s lit 7
Release of Assessment Lien Recordin Fee 7 Reso.93-280 Pro osition 4
Returned Check Char�e 25 Reso.93-280 G.C. 6157
Wire transfer 30 Reso.93-280 Pro osition 4
Parking Violations/Citations: Reso.92-32
After Hours in Parks 15 R.M.C. 10.20.030
Vehicle in Uupaved Area l5 R.M.C. 10.20.060
Parking Designated Areas I S R.M.C. 10.20.065
No Parking Zones 15 R.M.C. 11.24.020
No Parking 30 R.M.C.11.24.040
Commercial Vehicle on City Street 75 R.M.C.l 1.24.070
Parking Passenger Zone 30 R.M.C. l 1.24.080
Pazking in Zones 20 R.M.C. 11.24.120
3 Hour Parking l5 R.M.C.11.24.170
Overtime Parking-2 Hour 15 R.M.C. 11.24.180
Overtime Parking-1 Hour 15 R.M.C. 11.24.190
Overtime Parking-45 Min. 15 R.M.C.11.24.200
Overtime Parki�g-30 Mia l S R.M.C. 1 L24.210
Overtime Parking-12 Min. 15 R.M.C. 11.24.220
Overtime Parking-I S Min. I S R.M.C.11.24.230
Parkiog on Private Property 20 R.M.C.11.24.260
DisabledParkingZone 275(eff7/1/93) R.M.C.11.24.300
Not in Space I S R.M.C. 11.28.030
Meter Violation I S R.M.C. l 1.28.080
All Other Municipal Code Violations Not Listed 15
Restricted Parking Areas 15 V.C.21113a
Bike on Sidewalk 15 V.C.21210
Restricted/No Parking Zones 30 V.C.22500
Park Parallel-Right Wheels 18"From Curb 20 V.C.22502
Disabled Parking Zone 275 V.C.22507.8
Parking Near Fire Hydrant 30 V.C.22514
Unattended Vehicle 20 V.C.22515
Improperly Locked Veliicle 40 V.C.22516
Door Opened Into Traffic 30 V.C.22517
Parking On/Near Railroad Track 30 V.C.22521
Parking Near Access Ratnp 25 V.C.22522
High Beam Violation 20 V.C.24401
Parking With Explosives 260 V.C.31614g
No Registration Tab 60 n/a V.C.5204
Equipment Violation 10 n/a V.C.40225
All Other California Vehicle code Parking I S
Violations not Listed
� � Page 4
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FE�/SERVIC�CIIARGE OR AUTHORITY
ORDINANCE
COMMUNITY SERVICES-CONVENTION CENTF,R:
Service charge per hour: Reso.93-280 R.M.C.2.92.040
Stage Manager 21
Light&Sound l7
Cashier 17
Facility Rental: Reso.94-267 Proposition 4
No Admission Chargeci:
Mid-Week Rate(Tuesday-Thursday) 400/day/Performance plus]00/hr after
midnisht
Weekend Rate(Friday-Monday) 800/day/performance plus l00/hr after
midnight
Admission Charged:
Mid-Week Rate('Tuesday-Thursday) 400/performance or 10%of gate,whichever
greater,plus 100 aRer midnight
Weekend Rate(Friday-Monday) 800/performance or 10%of gate,whichever
greater,plus]00 after midnight
Set-Up,1'eardown,and Rehearsal:
Mid-Week Rate(Tuesciay-Thursday) 200/day betw 8AM and SPM plus 100
before 8AM/after SPM
Weekend Rate(Friday-Monday) 400/day betw£AM and SPM plus 100
before 8AM and after SPM
Convention Rates: Reso.94-267 Proposition 4
0-100 verified rooms 800
101-200 verified rooms 640
201-300 verified rooms 560
301-400 verified rooms 320
400+verified rooms 200
Meeting Rooms: Reso.94-267 Proposition 4
Mid-Week Rate(Tuesday-Thursday) Z00/day between 8AM and 5PM ar 400 for
events starting before 8AM or
extending after SPM
Weekend Rate(Friday-Monday) 400 betw SAM and SPM plus 100/hr after SPM
Other Small Meeting Spaces $50/5100 per da,y-rates dependent on space
size new
Ticket Service Char e $1.00 er ticket new)
Box Office 150/week or 500 flat rate for season ticket sales Reso.94-267 Proposition 4
not to exceed 4 weeks
Piano: Reso.94-267 Proposition 4
Large 100
Baby 5p
U ri�ht 50
Additional Set-U 100/hr Reso.94-267 Pro osition 4
Flat Shows/Trade Shows�Exhibit Shows 400/day or 10°/u of gross ticket sales, Reso.94-267 Proposition 4
whichever greater,Plus one-time
charge of 0.03/sy ft if entire room
used•if ortion 1 l/booth
� � Page 5
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated)
LAST UPDATE
TYPE OF FEE OR W:SOLUTION
SLRVICE CHARGE 1��E/SERVICE CHARGE OR AUTHORITY
ORDINANCF.
COMMUNITY SERVICES DEPARTMF.NT- Note: Fees listed below are per individual per session unless otherwise
RECREATION: ii�dicated.
Adult Athletic Programs: Proposition 4
Meds Basketball League 465(425+9.4%) Reso.98-101
3�S Reso.98-101
� j-3'_S Reso.9R-101
Tennis Lessons 30 Reso.93-280
Recreational Softball 85 Reso.93-280
Volleyball League 100 Reso.98-101
3 on 3 Basketball 75(new)
Adult Activities: Proposition 4
Aerobic Tap 34(new) Reso.98-101
Bridge 3$
Country Western Line Dance 16(15+6.7%)
Country Western Dance I and II: Reso.93-280
Couple 35(33+6.1%)
Ballroom Dancing(Couple) 35(33+6.1°/a)
Tatting �g
Fun Run Series 10 Reso.98-101
Fly Tying 29 0
Kara-FIo Self-Defense 3p
Watercolor 32
Meditation 60(45+33.3%)
Cake Decorating 25
�n' 42
Geative Memories
Without Photo Album ��
With Photo Album ZZ
Crochet
Single Adult �(�
Adult with Child 2z
Medic First Aide j'7
Investing for Women 3p
Kara-Ho Self Defense Zg
Kokondo 30
Photo Album Fun 16
Pottery (�5
Round Dance-Adult for ten classes 35
Ten Class visits punch card 4p
Two Adults for ten classes (�(�
Scuba Diving g0
Sign Language 25
�5
. �N
Snorkeling 3'7
Watercolor 35(32+9.4%)
.4
G.P.S.Navigation 25(new)
Garland Dance 20 first session/50 multiple sessions(new)
Getting Behavior in Hand l0(new)
Porcelain Doll Art ��,��eW�
Women's Issues 60 new
� � Page 6
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated)
LAST UPDATE
TYPF.OF FEE OR RESOLUTION
SERVICE CHARGE FF,E/SERVICE CHARGE OR AUTHORITY
ORDINANCE
Youth Athletic Programs: Proposition 4
Advance Basketball Sldlls Camp 20(new) Reso.93-2b0
Basketball Camp 4R(new)
Youth Basketball League 30
Farm League Baseball 20 Reso.98-101
�ir�t-A4�entfr �
k5- Reso. 93-280
. 6R
}liglischool Basketball Z�,p
Youth Softball 25 Reso.98-101
Soccer Clinic ?5 Reso. 93-280
Youth Soccer 47
Tennis Lessons 30(27+11%)
Junior Golf ?7 Reso.9R-101
Passing League 25
Roller Hockey Clinic lg(15+16.7%)
Instrnctional Open Gym 30 first session/60 multi sessions(new)
Jr.Giants 5 new
Youtl�Activities: Proposition 4
Tiny Tot Program 30 Reso.93-280
After School Adventures(per week) 3p
Build a Scarecrow 10 Reso.98-101
Kindergym 1 R Reso.93-280
Camp Caldwell '70 Reso.98-101
Holiday Workshops,per da,y 10(R+20%) Reso.93-280
Bowling 30 first session/411 mnitiple sessions(new)
Ballet 20(32-37.5%)first session/50 multi(new) Reso.98-I01
Kara-Ho Self-Defense ?g Reso.93-280
Going to Kindergarten 3p
Mommy and Me and Baby 7�
Tumbting 25(23+8.7%) Reso.9&-101
Cheerleading 15
Creative Memories ZZ
Exploring Dance ZS
KinderMusik 52
Kokondo/Karate Self Defence Zp
Primetime 10
Sanzyuryu 2�
Tea Parties �p
TumbGng Tots 25(23+8.7%)
��S }�-
Yo Yo Fun 1�
Boys Dance and Tumbling 20 first sessionl50 multiple sessions(new)
Drawing and Painting 36(new)
Fencing 27(new)
Giggle Bugs 22(new)
Grasshopper Kickball/Scoccer l6(new)
Jump Rope Class 25(new)
Jump Rope Camp 4R(new)
Modern Jazz/Dance 20 first session/50 multiple sessions(new)
Play Group 25(new)
Swing for Juniors 30 first session/70 multiple sessions(new)
Toddler Travels 22(new)
Aquatic Activities--Plunge and Enterprise Pool Reso.93-280 Proposition 4
Recreational Swim Admission Fee:
Adult--17 years or older,per day 2
Child--5 to 16 years,per day 1
Red Cross Swim Lessons 25(currection)
Aquarobics 25(20+25%) Reso.9R-101
Mommy and Me 20
Life ard Trainin includes 1 st Aide&CPR 89
• � Page 7
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated
LAST UPDATE .
TYPE OF FEE OR RESOLUTION
SLRVICE CHARGF. F�E/SERVIC�CHARGF, OR AUTHORTTY
ORDINANCE
NOTE--for the following section only:
Exempt groups under this section: Redding Teen Center,Redding Youth Baseball,and Redding Youth Football. Exemption does NOT include esemption from
concession clean-up fee.
Definitions:
Recreational Use: Use by any non-profit agency/group that offers a non-restrictive activity,recreational in nature. Any proceeds from this use must be
directed toward community service group activities.
Commercial Use: An use that creates revenue to be used at the discretion of the s onsorin rou .
Parsons Gymnasium: Proposition 4
Additional Labor per honr 5(new) Reso.92-297
Clean-up deposit 100
Maintenance and preParation: Reso.9R-101
4 or fewer hours use 75
4.1 to 8 hours use 150
Utilities:
4.1 to 8 hours use 50
Baseball/Softball Fields: Proposition 4
Light fee 20 Reso.98-101
Use Fee:2 hours 25
Additional Labor per hour 5
Tournament - er da 75
Tiger Field Reso.92-297 Proposition 4
One time use I00
Multiple use for a series per day 50
Tournament- er da 75 Reso.98-101
Soccer Fields: Proposition 4
Light fee 20 Reso.98-101
Use Fee-2 hours 25 Reso.92-297
Additional labor per hour 5
Tournament- er da 75 Reso.98-101
Tiger Hall: Proposition 4
Recreational use:
4 or fewer hours use 35 Reso.92-297
41 to 8 hours use 50 Reso.98-10 l
Commercial use:
4 or fewer hours use 50 Reso.92-297
4.1 to 8 hours use l00 Reso.98-101
Lassen Building: Proposition 4
Recreational use:
4 or fewer hours use 2_5 Reso.92-297
4.1 to S hours use 50 Reso.9£�-101
Commercial use:
4 or fewer hours use $0 Reso.92-297
4.1 to 8 hours use 100 Reso.98-101
Shasta Building: Proposition 4
Recreational use:
4 or fewer hours use 2$ Reso.92-297
4.1 to b hours use 5p Reso.9�-101
Commercial use:
4 or fewer hours use 50 Reso.92-297
4.1 to 8 hours use 100 Reso.98-10 l
Trinity Building: Proposition 4
Recreational use:
4 or fewer hours use 25 Reso.91-249
4.1 to 8 hours use 50 Reso.98-101
C:ommercial use:
4 or fewer hours use $0 Reso.92-297
4.1 to 8 hours use ►OQ Reso.9R-101
, . Reso.92-297 Proposition 4
�trn-Sr-Fitnegs �1-'_'+
ttrt �t5
Soeials �
�
� � Page 8
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SERVIC�CHARGE OR AUTT-IORITY
ORDINANCE
Teen Center. Reso.92-297 Proposition 4
Cleaning deposit 100
Recreational use:
4 or fewer hours use 25
4.1 to 8 hours use 50
Commercial use:
4 or fewer hours use 50
4.1 to R hours use 100
Martin Luther King Center. Reso.92-297 Proposition 4
Cleaning deposit I00
Recreational use:
4 or fewer hours use 25
4.1 to 8 hours use 50
Commercial use:
4 or fewer hours use 5p
4.1 to 8 hours use 100
Redding Plunge: Reso.92-297 Proposition 4
Recreational use:
4 or fewer hours use 50
41 to 8 hours use 100
Roller Hockey Rink Reso.98-l01
Recreational Use:
Multiple uses for a series per day 50
Tournament per day 75
User fee er da Z5
� � Page 9
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPI;OF FEE OR RESOLUT'ION
SERVICE CHARGE FEE/SF,RVICF,CHARGE OR AUTT�ORTTY
ORDINANCE
SUPPORT SERVICES DEPT.
UTILITY CUSTOMER SERVICE:
Service Reconnec;tion Fee disconnection due to non a ment of bill) 40 Reso.9R-101 R.M.C.14.20.020
On-site delive ofdisconnection notification door-han er) 21 Reso.98-101 R.M.C. 14.20.020
Service Transfer Fee 20 Reso.98-101 Pro osition 4
Field Collection 35 Reso.98-101 Pro osition 4
Voltmeter Readin 20 Reso.98-101 Pro osition 4
Meter Tam erin Penal 165 Reso.98-101 Pro osition 4
Priori Service Connection Fee ZS Resa.98-101 Pro osition 4
Watt-Hour Meter Testin Fee 22 Reso.98-lO l Pro osition 4
Non a ment Disconnection Notice Mailed) 10 Reso.98-101 Pro osition 4
Credit Re ort 2(new
Conference/Meeting Room: Reso.93-2R0 Proposition 4
1-4 hours Z5
4.1 or more l�ours�da 50
� � Page 10
CITY OF REDDING
SCHEDiJLE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF PI:E OR RESOLUTION
SERVICE CHARGE FEE/SF,RVIC�CHARGE OR AUTHOWTY
ORDINANCE
ELECTRIC DEPARTMENT:
Conference/Meeting Room: Reso.93-280 Proposition 4
1-4 hours Z$
4.1 or more hour�/da 50
� � Page 11
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
L�sT u[�DA�
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SERVICE CHARGE OR AUT�IORTI'Y
ORDINANCE
FIRE DEPARTMENT:
Hazardous Materials Response 28(24+16.7%)/qtr hr per engine,9/qtr hr Reso.98-101 Proposition 4
per Incident Commander and actual cost
er incident
Fire Prevention Ins ection Re ort 40(39+CPI /re ort Reso.98-101 Pro osition 4
Burn Permit 7/permit Reso.96-25 Proposition 4
A ricultural Burn Permit 39(38+CPI)/ ernut Reso.9R-101
SCBA Bottle Refill 5 Reso.93-90 Pro osition 4
State Fire Safe Clearance Fee 54 53+CPI Reso.98-10 l Pro osition 4
InvesN ation Re ort Fee 77 75+CPI Reso.98-IOl Pro osition 4
Weed Abatement Fee 54(53+CPI)administration fee+cost of Reso.98-101 Proposition 4
Weed Abatement Appeal Fee procedures Reso.99-72
225 includes hearin officer(new)
Plan Check Fee 144 141+2.3% Reso.97-202 Pro osition 4
S rinkler Plan Check Fee 7R 76+2.3%
Fire Alarm Plan Check Fee 7R 76+2.3%)
False Alarm Fee 48R(477+CPI) Reso.95-101 Pro osition 4
S rinkler S stem Ins ection 144 141+2.3% Reso.97-202 Pro osition 4
Uniform Fire Code Permits: Reso.98-101 R.M.C.9.20A10&
Aircraft Refaeling Vehicles 38(37+CPI) 9.20.130
Aircraft Repair Hangars 38(37+CPI)
Automobile Wrecldng Yards 75(73+CPI)
Bonfires or Rubbish Fires 22(21+CPI) each site
Bowling Pin or Alley Refurbishing 38(37+CPI) each installation
Burning in a Pubtic Place 38(37+CPI) each installa6on
Candles and Open Flames in Pubtic Assembly 38(37+CPI)
Cellulose Nitrate Storage 38(37+CPI)
CombusNble Fiber Storage 3R(37+CPI)
Compressed Gases and Cryogens 3R(3'7+CPI)
Combustible Material Storage 3R(37+CPI)
Dry Cleaning Plants 38(37+CPI)
Dust Producing Operations 38(37+CPI)
Explosive and Blasting Permits:
Blasting 75(73+CPI)
Powder Sales 38(37+CPI)
Transportation
Fireworks: I 3
PubHc Display 75(73+CPI)
Special Effects 77(75+CPI)
Flamtnable Liquids:
Storage,handling,or use of Class I liquids in excess of 5
gallons inside a building or 10 g$llons not inside a
building 3R(37+CPI)
Storage,handling,or use of Class II or III-A liquids in
excess of 25 gallons in a building or 60 gallons not in a
building 38(37+CPI)
Install or alter any flammable liquid tankor piping 3R(37+CPI) per tank
Fruit Ripening 38(37+CPI)
Funugation 38(37+CPI) /investigatioo
Garages 38(37+CPI)
Hazardous Materials 75(73+CPI)
Hazardous Production Materials 75(73+CPI)
Highly Toxic Pesticides
High Piled Storage 38(37+CPI)
JunkYards 38(37+CPI)
Liquified Petroleum Gas 75(73+CPI)
38 37+CPI
� � Page 12
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
FIRE cont'd. :
Lumber Yards 3R(37+CPI) Reso.98-101 R.M.C.9.20.010&
Magnesium Worldng 38(37+CPI) 9.20.130
Covered MaR,Special Uses 38(37+CPI)
Matches,Manufacture or Storage 3R(37+CPI)
Nitrite Film 3R(37+CYI)
Oil and Gas Wells 75(73+CPI)
Open Flame Devices in Marinas 38(37+CPI)/installation
Organic Coatings 38(37+CPI)
Industrial Baldng or Drying 38(37+CPI)
Places of Assembly 38(37+CPI)
Radioactive Materials 38(37+CPI)
RefrigeraHon F.quipment 38(37+CPI)
Spraying or Dipping 38(37+CPI)
Tank Vehicles 3R(37+CPI)
Tents,Air-Support Structures 38(37+CPI)/installation
Tire Recapping 3R(37+CPI)
R'aste Material Handling 38(37+CPI)
Welding or Cutting Operations 38(37+CPI)
Conference/Meeting Room Reso 93-280 Proposition 4
1-4 hours 25
4.1 or mor hours 50
Photo ra h Co ies 5.60 5.50+CPI each co
� � Page 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated)
LAST UPDATE
TYPE OF F1'sE OR RESOLUTTON
SERVICE CHARGE FEE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
DEVELOPMENT SERVICES DEPARTMENT
AIRPORTS
Delin uenc Penal -Rentals 47 er occurrence Reso.91-249 R.M.C.3.04.020
Rentals-Municipal Airport Reso.98-102 R.M.C.3.04.020
Closed Hangar 1-20 116
Closed Hangar 21-40 l30
Closed Hangar 41-70 l51
Closed Hangar 71-80 17l
Closed Hangar 81-88 205
Port-A-Port 212
Twin Engine 324
Aircraft Tie-Down(single) 31
Aircraft Tie-Down(twin&helicopter) 5q
Tie-Down Parking-Violation Penalty 47
Hangar Qffice-Single 54
Hanger Office-Twin 67
Electric Outlet Fee 5 er ouHet
Rentals-Benton Airport Reso.98-102
Closed Hangar 1-20 I 09
Closed Hangar 21-30 l l6
Closed Hangar 31-40 171
Closed Hangar 41-50 2l2
Open Hangar 83
Sun Shade Hangar g3
Aircraft Tie-Down(single) 31
Aircraft Tie-Down(twin&helicopter) 54
Transient Ti�Dow� Reso 91-125
Single 4
Twin 5
Helicopter 5 Reso.98-102
Tie-Down Parking-Violation Penalty 47
Hangar Office-Single 54
Electrical Outlet Fee 5 per outlet
Lar e Aircraft Overni ht Fee reater than 2,500 s ft ?5 er ni ht
LandingFees: Reso.98-]Ol R.M.C.3.04.030
Aircraft with certified maximum gross 0.82 per 1,000 Ibs.certified maximum takeoff
takeoffweight geater than 12,500 lbs. weight
Aircraft providing regularly scheduled passenger or O.R2 per 1,000 Ibs,certified maximum takeoff
freight services(regardless of weight) weight
Aircraft operating from Redding Municipal Airport in 24.72 for aircraft up to and incl.30,000 lbs.
performance of special contracts for fighting fire or otherwise of certified gross take-off weight;
with federal,state,or county governments 3296 for aircraft up to and incl.60,000 Ibs.
of cedified gross takeoff weight;
37.08 for aircraft up to and incl.80,000 Ibs.
of certified gross take-off weight;
41.?0 for aircraft over 80,OOOIbs.of certified
ross takeoff wei t
Fuel Flowa e Fee 0.065 0.063+CPI er allon Reso.96-25 R.M.C.3.04A20
Enplaning Passenger Charge 3/passenger Reso.94-272 P.L.101-508
Title IX
Small Packa e Delive Vehicle User Fee 20 er vehicle er month Reso.98-101
Republic Parking Reso. 97-041
0-%: hour .50
Second%:hour 75
Each additional hour 75
Maximum 24 hours 4.75(4.5p+5.6%)
Weekl Rate 27.00
� � Page 14
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FL�/SERVICE CHARGE OR AUTHORITY
ORDINANCE
DEVELOPMENT SERVICES DF.PARTMF.NT-
GIS DIVISION
Maps Reso.9R-101 Proposition 4
Color Plote
8.Sx11 to l 1x17 l5
ISx24 �0
24x36 25(24+CPI)
36x48 and Larger 31(30+CPI)
Additional copies of Color Plots
8.Sx11 to I lxl7 1
18x24 and Lar er 15
� � Page 15
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE PEE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
DEVELOPMENT SERVICES DEPARTMENT-
BUILDING DIVISION:
Abatements--i osed when no re onse to attorne demand letter Im osed at full cost of rocedure Reso.88-364 Pro osition 4
Building Permit Microfilming Charge Proposition 4
Valuation of Less than$12,000 3
Valuations of$12,000 and above .25 er$I 000 of valuation not to exceeci$250
Building Permit Fees Total Valuation Reso 97-202
$ 1 to$ 500 L8.11(17.70+2.3%)
501 to 2,000 IS.11(17.70+2.3%)+2.46(2.40+2.3%)for each
additional 100 over first 500
2,001 to 25,000 54.94(53.70+2.3%)+10,84(10.60+23%)for
each additional 1,000 over the first 200
25,001 to 50,000 304.34(297.50+2.3%)+7.90(7.88+2.3%)for
each additional 1,000 over the first 25,000
50,001 to 100,000 501.27(490.00+2,3%)+5.42(5.30+2.3%)for
each additional 1,0110 over first 50,000
100,001 to 500,000 772.37(755.00+2,3%)+4.19(410+2.3%)for
each additional 1,OU0 over first 100,000
500,001 to 1,000,000 2450.09(2,395.00+2.3%)+3.,SR(3.50+2.3%)for
each additional 1,000 over first 50p,000
1,000,001 and up 4240.34(4,145.00+2.3%)+2.46(2.40+2.3%)
for each additional 1,000 over first
1,0011,000
Electric Permit Fees
Permit Issuance-each permit 18.11(17.70+2.3%) Reso 97-202
Each supplemental permit 5.42(5.30+2.3%)
System Fee Schedule Reso 97-202
New Resideotial Building
Multi Family .041(.040+2.3%)per sq.ft.
Single-two family .046(.045+2.3%)per sq.ft.
New NonresidenNal Buildings
3,000 sq.ft. .056(.055+2.3%)per sq.ft.
3,001 to 10,000 sq.ft. .1146(.045+2.3%)per sq.ft.
Over 10,000 sq.ft. .036(.035+2.3%)per sq.tt.
Private Swimming Pools 36.11(3530+2.3%)each
Carnivals and Circuses
Electric generators&electrically driven rides 18.11(17.70+2.3%) each
Mechanicall,y driven rides and attractions or
displa,ys w/electric lighting 5.42(5.30+2.3%) each
System of area and booth lighNng 5.42(530+2,3%) each
Temporary Power Service
Power pole or pedestal 17.70(18.11+23%)each
Distribution s stem 9.00 8.80+2.3% each
i • Page 16
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SF.,RVICE CHARGE OR AUTHORITY
ORDINANCE
Electric Permit Fees(con't)
Unit Fee Schedule Reso 97-202
Receptacle,Switch and Lighting Outlets
First 20 .92(.90+2.3%) each
Additional Outlets .56(.55+2.3%) each
LighHng Fixtures
First 20 .92(.90+2.3%) each
Additional Fi�etures .56(.55+2.3%) eac6
Pole or platform lighting flxtures .92(.90+2.3%) each
Theatrical type lighNng fixtures .92(.90+2.3%) each
ResidenHal Appliances 3.58(3.50+2.3%)each
Nonresidential Appliances 3.58(3.50+2.3%)each
Power Apparatus per HP,KW,KAVA or KVAR
Up to and including 1 3.5g(3.50+2.3%)each
Over 1 and not over 10 9.00(8.80+2.3%)eacli
Over 10 and not over 50 18.11(17.70+2.3%)each
Over 50 and not over 100 36.32(35.50+2.3%)each
Over 100 54.22(53.00+2.3%)each
Busways-Trolley and plug-in t,ype 5.42(530+2.3%) each
Signs,Outline Lighting and Marquees
Supplied from one branch circuit 18.11(17.70+2.3%)each
Additional branch circuits per sign 3.58(3.50+2,3%)each
Services
600 volts or less¬ over 200 amperes 22.30(21.80+2.3%) each
600 volts or less&over 200 amperes to 1,000 amperes 44.17(44.15+2.3%) each
Over 600 volts or over 1,000 amperes 90.54(90.50+2.3%) each
Misc.Apparatus,Conduits,&Conductors for which a
permit is required but no other fee is set 13.30(13+2.3%)
Mechanical Permit Fees
Permit Issuance 18.11(17J0+2.3%) each Reso 97-202
Supplemental permit issuance 5.42(5.30+2.3%) each
Reso 97-202
Unit Fee schedule
Installation of forced air or gravity, t,ype furnace or burner
Up to and including 1OQ000 Btu/h 10.R4(10.60+2.3%)each
Over 100,000 Btu/h 11.25(11+2.3%)each
Installation or relocation of floor furnace 10.R4 (10.60+2,3%)each
Installation or relocation of suspended heater,recessed wall
heater or floor mounted heater 10.84 (10.60+2,3%)each
Installation,relocation or replacement of appGance vent 5.42(5.30+2.3%) each
Repair or alteration of,or addition of each heating
appGance,
refrigeration unit,cooGng unit,absorption unit or each
heating,cooling,absorprion or evaporative coollng 10.84 (10.60+2.3%)each
system including installation of controls
Installation or relocation of boiler or compressor 10.84 (10.60+2.3%)each
Up to 3 horsepowers or 100,000 Btu/h 19.95(19.50+2.3%) each
Up to 15 horsepowers or 500,000 Btu/h 27.11(26.50+2.3%) each
Up to 30 horsepowers or 1,OOO,U00 Btu/h 40.41(39.50+2.3%) each
Up to 50 horsepowers or 1,750,000 Btu/h 67.52(66.00+2.3%) each
Over 50 horsepowers or 1,75Q000 Btulh
Air-handling unit 7.88(7.70+2.3%) each
Up to 10,000 cubic ft per min. 13.30(13+2.3%) each
Over 10,000 cubic ft per min 7.88(7.70+2.3%) each
Evaporative Cooler,not portable 5.42(5.30+2.3%) each
Ventilation fan connected to single duct 7.88(7.70+2.3%) each
Ventilation system not part of heating or air conditioning
system 7.8R(7.70+2,3%) each
Instailallon of each hood served by mechanical exhaust 13.30(13+2.3%) each
Installation or relocation of domestic incinerator
Installation or relocation of commercial or 54.22(53.00+2.3%)each
industrial e incinerator
� � Page 17
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF F�E OR RESOLUTION
S�RVICE CHARGE FEE/SERVICE CHARGE OR AUTT-IORITY
ORDINANCE
DEVF.LOPMENT SERVICESBUILDING DIVISION
(con't):
Plumbing Permit Fees
Permit Issuance 18.11(17.70+2.3°/a)each Reso 97-202
Supplemeotal Issuance 5.46(5.30+2.3%) each
Unit Fee Schedule Reso 97-202
Plumbing flxture or trap 7.26(7.10+2,3%) each
Building sewer or trailer park sewer 18.11(17.70+2.3%) each
Rainwater system 7.26(7.10+2,3%) each
Cesspool 27.11(26.50+2.3%)each
Private Sewage disposal system Sq,22(53.00+2.3%) each
Waterheater and/or vent 9.00(8.80+2.3%) each
Industrial-waste pretreatment interceptor 14.42(14.10+2,3%) each
Installation,alteration,or repair of water piping
and or water-treating equipment 3.58(3.50+2.3%) each
Repair or alteradon of drainage or vent piping 3.58(3.50+2.3%) each
Lawn sprinkler system on any one meter lU.A4(10.60+2.3%) each
Atmospheric type vacuum breakers
1 to 5 9.00(8.80+2,3%) each
Over 5 2.95(1.80+2.3%) each
Back-flow protecdon device
2 inches or smaller 9.00(8.R0+2.3%) each
Over 2 inches 1R.11(17.70+23%)each
Gas piping system
1 to four 3.58(3.50+2.3%)each
5 or more .92(.90+2.3%)each
Other Inspections and Fees(All permit types) Reso 97-202
Inspection outside normal business hours 36.11(35.30+2.3%)/hr
Reinspection fees assessed under provisions of Sect.
108.8 C.B.C. 36.11(35.30+2.3%)/hr
Inspection where no fee is indicated 36.11(35.30+2.3%)/hr
AddiHonal plan review required by changes- 36.11(35.30+2.3%)/hr
A liances re ulated b code not in an other cate o 7.88 7.70+2.3%
� • Page 18
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF F�E OR RESOLUTION
SERVICE CHARGE FEE/SF,RVICE CHARGE OR AUTHORIT'Y
ORDINANCE
DEVELOPMENT SERVICES DEPARTMEN'I'-PLANNING
DIVISION:
Lot Splits/Lot Mergers: Reso 97-202 G.C.§§66451.2
Administrative Parcel Map--exempt from CA &66451.33
Environmental 445(445+2.3%)
Quality Act(CEQA) 656(641+2.3%)
Major 2-to 4-Parcel Split--NOT exempt from CEQA
Lot Merger 73(71+2,3%)
Property Line Adjustment 397(388+2.3%)
Amendment or E�etension 19R(194+2.3%)
Administrative Parcel Ma Amendment or F.xtension
Subdivisions: Reso 97-202 G.C.§§66451.2
Subdivision and Condominium Conversions: &6645133
5 to 251ots 1403(1371+2.3%)+SAot
26 to SO lots 1909(1866+23%)+8/lot
51 to 1001ots 2674(2614+2.3%)+8/lot
101 or more lots 3064(2995+2.3%)+7Aot
Extension Sql(529+2.3%)
Amendment 63R(624+2.3%)
Reversion to Acreage lOR(106+2.3%)
VesHng Tentative Map:
Preliatinary Evaluation 548(536+2.3%)
Application 1818(1777+2.3%)+8/lot
Extension Application 548(536+2,3%)
Amendment 548 536+2,3%
Planned Development and Cluster Subdivisions: Reso 97-202 G.C.§65104
Application 2764(2702+2.3%)+8/lot
Final Plan Review 277(271+2.3%)+8/lot
Apptication for Extension 832(813+2.35)
Amendment 832 813+2.35
Abandonment: Reso 97-202 Proposition 4
Right of Way 1306(1277+2,3%)
Easement 656 641+2.3%
Animal Permit 54 53+2.3% Reso 97-202 G.C. 65104
Use Permits: Reso 97-202 G.C.§65104
Home Occupation Permit 54(53+2.3%)
Home OccupaHon Appeals by Applicant 37(36+23%)
Administrative Use Permit(exempt from CEQA) 271(265+2.3%)
Apartment Project:
First 4 units 4S7(476+2.3%)
5 to 49 units 591(578+2.3%)+6lunit
50 or more units 1,229(1201+2.3%)+6/unit
Mobile Home Park 1,229(1201+2.3%)+6/unit
Miscellaneous 288(282+2.3%)
CommerciaUIndustrial New Construction
1 acre or less 584(571+23%)
1.1 to 5 acres 777(760+2.3%)
51 to 10 acres 1,529(1495+2.3%)
Over 10 acres 1,951(1907+2.3%)
Amendment and Extension 28R(282+2.3%)
Administrative Use Permit Amendment or Extension 1Rl(177+2.3%)
Renewal for Home Occupation Permit 15
Final Plan Review 362(354+2.3%)
Tree Permit 12 tree
Administrative Sign Permits Issued by Staff: Reso 97-202 G.C.§65104
Temporary promotional advertising sign,exempt from
CEQA, not requiring property,-owner noti6cation,as
determined by 60(59+23%)
staff
Temporary promotional advertising sign,exeropt from 198(194+23%)
CEQA, requirio�property-owner notificallon,as
determined by staff 96(94+2.3%)
Permanent advertising sign,exempt fron►CEQA,not
requiring 198(194+2.3%)
property-owner nodflcadon,as determined by staff
Permanent advertising sign,exempt from CEQA,re uirin
ro er -owner notification as determined b staff
• • Page 19
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
DEVELOPMENT SERVICES/FLANNING cont'd.:
Discretionary Use Permits for Signs: Reso 97-202 G.C.§65104
Temporary and permanent advertising issued by Board of
AdministraNve Review or Planning Commission:
Exempt from CEQA 296(289+2.3%)
IVot exem t from CE A 397 38R+2.3%
Site Plan Review: Reso 97-202 G.C.§65104
1 acre or less 530(518+2.3%)
Ll to 10 acres 879(R59+2.3%)
Over 10 acres 1,770(1731+2.3%)
Amendment or extension 488 477+2.3%
General Plan Amendments/Specific Plans: Reso 97-202 G.C.§§65104
1 acre or less 1,542(1507�2.3%) &65456(b)
1.1 to 10 acres 2,083(3014+2.3%)
10 to 100 acres � 4,402(4303+2.3%)
Over 100 acres 6 986(6829+2.3%
Rezoning: Reso 97-202 G.C.§65104
1 acre or less 1,072(1048+2.3%)
1.1 to 10 acres 1,710(1672+2.3%)
10 to 100 acres 2,565(2507+2.3%)
Over 100 acres 4 275 4179+2.3%
Variance: Reso 97-202 G.C.§65104
Zoning exception 373(365+23%)
Major variance 561(54R+2.3%)
Variance amendment or extension 561(548+2.3%)
Zonin Exce tion Amendment or EaRension 373(365+2.3%)
Develo meot A reement A Gcation 1 746 1707+2.3% Reso 97-20? G.C. 65865 d
Ordinance Amendment Text 1710 1672+2.3% Reso 97-202 G.C. 65104
Snrface Mining/Reclamacion Plans 2,770(2708+2.3%) Reso 97-202 R.M.C. 18.63.050
Annual Surface Minin Ins ection Administrative Fee 499 488+2.3%
Environmental Impact Report Processing: Reso 97-202 Pub.Resources
1 acre or less 2,252(2201+2.3%) Code§21089(a)
11 to 5 acres 2,698(2637+2,3%)
5.1 to 10 acres 3,156(30A5+2.3%)
10.1 to 20 acres 4,U52(3961+2.3%)
20.1 to 40 acres 6,750(6598+2.3%)
401 to 100 acres 9,009(8806+2.3%)
for each 25 acres or fracfion thereof in
excess of 100 acres not to exceed$13 000 1 125 1100+2.3%
Environmental Assessment and Negative Declaration�De Minimis 20%of permit fee(credit against EIR fee,where Reso.92-80 Pub.Resowces
a licable Code 21089 a
Appeals: Reso 97-202 G.C.§65104
Applicant 174(170+2.3%)
Other 102(100+2.3%)
Administrative Permit 37 36+2.3%
Laudscape Maintenance District FormaHon R14(795+CPI) Reso.93-280 Sts.&Hwys.Code
22569
Land Use Histo /Toxic Hazard Review 236 230+CPI +time/materials Reso.93-280 Pro osition 4
Street Renaming Request: Reso 97-202 Proposition 4
0-1,000 feet of street 259(253+2.3%)
Over 1 000 feet 434 424+Z,3°o
• � Page 20
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SERVICE CHARGE OR AUT�30RITY
ORDINANCE
DEVELOPMENT SERVICES/PLANNING cont'd):
Publications and Documents: Reso 98-101 Not required
Statistical:
Redding Downtown Mall Market Study 5
Redding Metro Report l0
Comprehensive Housing Strategy l0
Retail Sales Study 10
Ordinances:
Subdivision 10
7oning Ordinance I 5
General Plan Amendments:
Safety�lement 5
Scenic Route Element 5
Conservation and Open Space Element(1985-2000) 5
Noise Element(1980-2000) 5
Seismic Safety Element 5
Housing Element 10
General Plan 25-Year Comprehensive Plan 10
Circulation Element(1985-2000) l5
Recreation Element(1985-2000) I S
Area/Specific Plans:
Clear Creek Area Plan 5
Columbia Area Plan 5
Oasis Road Area Plan 5
Texas Springs Plan 5
Reddi�g Riverfront Specific Plan 10
Redding Municipal Airport Plan 10
Shasta Metro Enterprise Zone(EIR-1-91) 26(ZS+CPI)
Texas Springs(EIR-3-8R) 26(25+CPI)
Copies:
Zoning maps,400 scale reduced to 800 scale 15
Address maps,200 scale reduced to 800 scale 31(30+CPI)
General Plan,S00 Scale Blueprint Set 67(65+CPI)
Zoning Maps,400 Scale Blueprint Set lZg(125+CPI)
Shasta Metro Zone color plot 31(30+CPI)
General Plan,1600 Scale color plot 31(30+CPI)
Zoning,1600 Scale color plot 31(30+CPI)
Land Use,1600 Scale color plot 31(30+CPI)
City BoundarylSphere of Influence plot 31 30+CPI
Blueprint Copies: Not required
Basic rate,per page 1.28(1.25+CPI)
Single general plan,zoning,subdivision maps 2.97(2.90+CPI)
General plan maps,800 scale 26(25+CPI)
Zoning maps,400 scale 67(65+CPI)
City boundary/sphere of influence map 128(125+CPI)
Shasta Metro Ente rise Zoue ma 5
Cost for copies of documents and maps not specified above shall 6e
established b the Develo ment Services Director
Conference/Meeting Room(Housing Authoriry): Reso.93-280 Proposition 4
1-4 hours 25
4.1 or more hours/da 50
� � Page 21
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE PEE/SERVICE CHARGE OR AUTHORTTY
ORDIN ANCE
POLICE DEPARTMENT:
Fin e rint card fee 10 7+42.9%) Reso.93-280 P.C. 13300
Police report copies .25/page Reso.94-267 C.V.C.§20012
.55/ a e microfilm co ies &G.C. 6257
Concealed weapons permits: Reso.98-101 P.C.§12054
New 45(3+1400%) +DOJ fees
Renewal 25 3+733%)+DOJ fees
Second-hand dealer permit: Reso.98-101 R.M.C.6.30.040
Inirial fee 4R(47+CPI) +DOJ fees &Proposition 4
Per employee 16 +DOJ fees
Renewal 4R(47+CPI) +DOJ fees
Cardroom license a lication for 602 588+CPI Reso.98-101 R.M.C.16.14.060
Cardroom table fee, er table er ear 241 235+CPI Reso.98-101 R.M.C.16.14.060
Cardroom owner/employee permit l6+DOJ fees Reso.98-101 R.M.C.16.14.100
Cardroom ermit renewal ]6
Emer enc res onse DUI arrest and traffic collision 70 68+CPI er hour er officer Reso.98-101 G.C. 53150-58
Taxi ins ection earl ) 19 er taxi Reso.98-101 Pro osition 4
Tow truck inspection(,yearl,y) 35(34+CPI) per truck Reso.98-101 Proposition 4
Tow truck re-inspection 69(67+CPI)per truck-topside
137(134+CP� er truck-underneath
Photograph copies: Reso.98-1 O l G.C.§6257
Black&white 16 per photo
Color 10+ rocessin wst
Audiocassette copies 3+cost of tape Reso.98-101 G.C.§6257
Videocassette co ies 20 +cost oPta e and re roduction Reso.98-101 G.C. 6257
Towed vehicle release f'ee 96 Ordinance 2226
Pro e return fee 16+cost of C.O.D. Reso.98-101 Pro osition 4
Medical Dispatch: Reso.98-101 Proposition 4
Fu0 Service 13(12.SO+CPI)
Drop Line (�
Publications/Equipment Usage: Not required
Daily bullefin 0.25/page(1-75%)
Firearms Training Simulator 23(22+CPI)/hr(agencies only)
Sex Offender Re istration 290 P.C. 38 36+CPI Reso.98-101 Pro osition 4
� , Page 22
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated)
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE FEE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
PUBLIC WORKS DEPARTMENT:
Land development and engineering service fee Cost+71°/a overhead Reso 97-202 Proposition 4
(0.5%of land development cost to be provided toward City cost of
improvement plan review due at time of submittal of improvement
plans;and 1.0%of land development cost to be provided for City
in ection cost at time of commencement of construction.
Final parcel map review fee 313(306+2.3%) Reso 97-202 R.M.C. 17.16.030
&Pro osition 4
Grading permit: Reso 97-202 R.M.C.16.40.070
50 to 100 yards 69(67+2,3%)
101 to 500 yards 110(108+2.3%)
501 to 1,000 yards 345(337+2.3%)
1,001 to 2,000 yards 409(400+2,3%)
2,001 to 3,000 yards 488(477+2.3%)
3,001 to 4,000 yards 5563(550+2,3%)
4,001 to 5,000 yards 636(622+2.3%)
5,001 to 10,000 yards 756(739+2.3%)
For each additiona15,000 yards or fraction
thereof in excess of 10,000 ards 149 146+23%
Clearing(for grading): Reso 97-202 R.M.C. 16.40.070
1 to 2 acres 75(73+2,3%)
2.1 to 5 acres 110(108+2.3%)
5.1 to 10 acres 225(220+2.3%)
For each additional 5 acres or fraction
thereof in excess of 10 acres 36 35+2.3%
A eals for radin 60 59+23% Reso 97-202 R.M.C.16.40.070
Encroachment fee Minimum fee of 62(61+2.3%)or 5%of Re.so 97-202 Proposition 4
En ineer's EsHmate whichever is reater
"Pransportation permit: V.C.35795(b)
Single occurrence 16 Reso.91-249
Annual or re etiHve occurrence 82 SO+CPI Reso.93-280
Blue rint co ies 1/ a�e Reso.92-2R0 Pro osition 4
Water Service Installation(includes meter) Reso 90-417 R.M.C. 14.08.310
Service Size,5/8"to 3/4"meter 625(400+56.3%)
Service Size,3!4"meter 640(420+52.4%)
Service Size,1"meter 6911(455+51.6%)
Service Size,11/2"meter R80(640+37.5%)
Service Size,2"meter 1035(790+31.1%
Meter Set Installation(meter only) Reso 90-417 R.M.C. 14.08.310
Meter Size,5/8"to 3/4"meter 62(55+12.7%)
Meter Size,3/4"meter RO(70+6.7%)
Meter Size,1"meter l03(95+8.4%)
Meter Size,11/2"meter 230(200+15%)
Meter Size 2"meter 295 285+3.5%
Pavin Cut Char e water service 410 165+1485% Reso 90-417 R.M.C.14.08.310
Water Service S lit multi le meters on arcel 296 211+40.3% Reso 90-417 R.M.C. 14.08310
Wastewater Line Tap Ordinance 2201 R.M.C.14.16.200
Tap Fee,6x4 or 6x6 109(106+CCI)
Ta Fee 8x4 or 8x6 138 135+CCI
� • Page 23
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fee amounts in dollars unless otherwise indicated
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICT CHARGE FEE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
SOLID WASTE TRANSFER/RECYCLING FACILITY
Green Waste(no concrete/diNrocks/asphalt) 99-67 R.M.C.9.28110
Per Ton Rate $13.20
Full Size Pickup(3/4 or 1 ton)
Minimum to Level 4.00
Above Level to Top of Cab 5.00
Above Cab 6.00
Mini Pickup Loads(%Ton)
Minimum to Level 3.00
Above Le��el 4.00
Above Cab 5.00
Utiliry Van
Minimum 4.00
Half Full 5.00
Full 6.00
Small Trailer Loads(under 7'feet) 4.00
Large Trailer Loads(over 7 feet) 6.00
Bag or Waste Can-33 gallon 1.00
Household Waste 99-67 R.M.C.9.28.110
Per Ton Rate 44.00
Full Size Pick up
Minimum to Level 10.00
Below Rear Window 12.00
Above Cab 15.00
Mini Pickup Loads
Minimum to Level 8.00
Above Level 11.00
Above Cab 14.00
Utility Van
Minimum I0.00
Half Full l 2.00
Full I5.00
Trailer Loads(under T feet) 7.00 to 10.00
Trailer Loads(over 7 feet) 12.00 to 15.00
Large or Heavy Loads more than 2 tons or in excess of 5 cubic
yards 56.00
Bag or Waste Can-33 gallon I.00
Construction Waste 99-67 R.M.C.9.28.110
Minimum Same as Household Waste rates. Clean wood
Minimum to Level (wood without paint or other treatment)will be
Above Level charged at same rate as self-haul green waste.
Above Cab
Mini Pickup Loads
Minimum to Level
Above Level
Above Cab
Trailer Loads(under 7')
Each additional foot
Larger Truck Loads(1-Ton or Larger)
Car Tire(no wheeUrim) 1.25 99-67 R.M.C.9.28.l 10
Car Wheel or Rim only 1.25
Car"Cire with Rim 3.25
Truck Tire(no wheel/rim) 6.25
Truck Wheel or Rim only 5.00
Appliance with Motor or Compressor 15.00
Other Large Appliance with Motor 10.00
Small Appliance without Motor 5.00
Couch/Large Chair/Table 6.00
Motor Removal 5.00
Refrigerant Removal $.00
� • Page 24
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
(Fee amounts in dollars unless otherwise indicated)
LAST UPDATE
TYPE OF FEE OR RESOLUTION
SERVICE CHARGE i'EE/SERVICE CHARGE OR AUTHORITY
ORDINANCE
Household Hazardous Waste Faciliry Fees and Materials Fees for Household Hazardous Waste Facility 99-67 R.M.C.9.28.110
shall be based on 30%of the City's Costs to
dispose of the chemical and Chen rounded offto lhe
nearest whole dollar. Each year,the Solid Waste
Director shall adjust the disposal fees to retlect any
price or cost changes.
Special Handling Fee: Every 6 months,the Solid Waste Director shall
A special handling fee shall be charged by the Solid Waste Director review the C:ity's cost to dispose of scrap metals
when market conditions result in a loss on recycling scrap metals on and shall adjust the fee from$0.00 to a maximum
the following items: of$5.00 in order to make up the difference
between the Ciry's cost and what it receives from
Oven the sales of scrap metals. Based on a$0 fee if the
Oven/Stove Combo City is obtaining$20 per lon for scrap metals and
Refrigerator based on a fee of$5 if the City is paying$20 per
Freezer ton to get someone to take scrap metals.
Washer
Dishwasher
l tou or larger HVAC Unit
Water Heater
Drier
Equivalently Sizecl Business Machines or Industrial Equipments
Large Scrap Metal Loads:Large loads of scrap metals shall be
charged a special handli�g fee as follows
0-200 lbs 5.00
201-400 lbs g.Op
401-600 Ibs 1 I.00
601-800 Ibs 14.00