Loading...
HomeMy WebLinkAboutReso 2019-060 - Schedule of Fees & Service Charges RESOLUTION NO. 2019-060 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING AMENDING ITS SCHEDULE OF FEES AND SERVICE CHARGES WHEREAS: A. On October 4, 1988, by Resolution 88-364, the City council adopted a Schedule of Fees and Service Charges (Schedule), which has been subsequently amended from time-to-time. B. Pursuant to said resolution, the City Manager is authorized and directed to revise, supplement, and maintain the Schedule so that it will be, to the greatest extent possible, a comprehensive list of fees and City permits and services; and that a fee that is not on the Schedule will not be invalid but should be made a part thereof at the earliest possible time. C. It is the desire of the City Council that all City services be self-supporting and not subsidized as to their operational costs by revenues raised through the imposition of ad valorem taxes or other sources of revenue. D. On an annual basis and in accordance with City Council Policy 802, on June 18, 2019, the Director of Finance submitted to the City Council proposed increases and changes in the Schedule and made a part hereof by this reference. E. A public hearing on the proposed increases and changes was held on this date, prior to the adoption of this resolution. NOW, THEREFORE, the City Council of the City of Redding FINDS, DETERMINES, and RESOLVES as follows: 1. With respect to the proposed changes in fees and charges and/or new fees in the attached Schedule, the City Council finds and determines that: a. The fees and charges previously established by resolution continue to be reasonably related to the cost of providing the specific services for which the fees are charged, except as modified herein. The modifications reflect the increases or decreases in the costs of providing the specific services related to the charges. b. The new fees are reasonably related to or are less than the cost of providing the specific service for which the fee is to be charged, and is �. necessary to cover the City's costs of providing the service. c C. The provisions of the California Environmental Quality Act do not apply to the new or increased fees, which are for the purpose of meeting operating expenses of a portion thereof. d. The proposed new fees and increases will not exceed the governmental costs in providing said services in Fiscal Year 2019-20. 2. That the fees and charges be amended as indicated in the attached Schedule of Fees and Service Charges, to cover the City's costs of providing the services. I HEREBY CERTIFY that the foregoing resolution was introduced and adopted at a regular meeting of the City Council of the City of Redding on the 18`h day of June, 2019, by the following vote: AYES: COUNCIL MEMBERS: Resner, Schreder,and Winter NOES: COUNCIL MEMBERS: McElwain ABSENT: COUNCIL MEMBERS: Dacquisto ABSTAIN: COUNCIL MEMBERS: None 11 JULIE WINTE , Mayo V Attest: Form Approved: �i", /--�) Aakz — PAMELA MIZE, City Cle BARRY E. DeWALT, City Attorney CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information FResolution or Authority Service Charge Fee Ordinance FINANCE DEPARTMENT Comprehensive Annual Financial Report(CAFR) 10.00 Per Copy Reso.2006-90 Budget Report 15.00 Per Copy Reso.2006-90 Photocopies 0.25 Per Page Reso.2006-90 General Account Receivable Late Fee 1.50% 1.5%applied to unpaid balance/month Reso. 92-426 CC Policy 0415 Late Penalty(mailed,15-day I first notice) 16.00 Reso.2009-177 Disconnect Notice Penalty mailed,7day/final notice 20.00 Reso.2009-177 Proposition 4 Late Pena mailed,15-day/first notice Commercial 3.00% Unpaid delinquent balance Reso.2009-110 CITY MANAGER Retail Cannabis Sales RFP fee 1,000.00 CPI Reso.2018-036 R.M.C.6.12 CITY CLERK Business License Fee Delinquency Penalty 10% Per Month Ord.1935 R.M.C.6.02.180 Noncompliance Penalty 25% Of License Fee Ord.2149 Duplicate License 10.00 Reso.2006.90 Dog License Fee Unaltered 1-year license 20+2 surchg. Reso.2007-175 2-year license 37+2 surchg. Reso.2007-175 3-year license 46+2 surchg. Reso.2007-175 Spayed or neutered 1-year license 10.00 Reso.2007-175 2-year license 18.50 Reso.2007-175 3-year license 23.00 Reso.2007-175 Replacement tag 3.00 Reso.2007-175 Fees to seniors(60 or Older) 50%of stated fees Reso.2006-90 Partial year(after 12131),1-year license only 50%of stated fees Reso.2006-90 Late Penalty Fee 15.00 Reso.2006-90 Dep.for redempt.of impounded dog when rabies 25.00 Ord.1960 vaccine is required Dog Kennel License 0-10 dogs 64.00 Reso.2009-110 11 or more dogs 128.00 Reso.2009-110 Dog Kennel License Penalty Fee 21.00 Reso.2009-110 Dangerous Dog Licensing Fee 63.00 Reso.2009-110 Handbill Permit Permit Fee 50.00 Per Quarter Reso.2006-90 R.M.C.6.36.110 Filing Fee for Notice of Intent to Circulate Petition in Municipal 200.00 Reso 2006-06 Election E.C.§9202(b) Photocopies 0.25 Per Page Reso.2006-90 Proposition 4 Photocopies of FPPC Documents 0.10 Per Page Reso.2006.90 G.C.§81008(a) Photocopies from Microfiche/Microfilm 0.55 Per Page Reso.2006-90 Proposition 4 Photocopies from Aperture Cards 2.00 Per Pae Reso.2006-90 Proposition 4 Photocopies on USB flash Drives 6.50 Per Flash Drive Reso.2017-054 Closing Out Sale Permit sale lasting over 60 days) 0.00 For 30-day extension Ordinance 609 R.M.C.6.34.050 Community Room/Plaza- Includes fresh charge,tables and chairs as specified,whiteboard f easel and podium Private Party Rates: Full Day:7 am to midnight• 345.00 Includes 5 tableland 25 chairs CPI Reso.2019-060 420.00 Includes 10 tables and-75 chairs CPI Reso.2019-060 484.00 Includes 15 tables and-100 chairs CPI Reso.2019-060 Hall Day:Any combination of between two and eight hours258.00 Includes 5 tables and 25 chairs CPI Reso.20194160 345.00 Includes 10 tables and 75 chairs CPI Reso.2019-060 400.00 Includes 15 tables and 100 chairs CPI Reso.2019.060 Minimum Day(up to 2 hours)' 107.00 Includes 5 tables and 25 chain CPI Reso.2019-060 199.00 Includes 10 tables and 75 chairs CPI Reso.2019-080 258.00 Includes 15 tables and-100 chairs CPI Reso.2019460 -All Private Party Rates represent non-holiday and non-weekend dates. Private Party Rates for holidays increase by 200%of stated rate:and for weekends increase by$100 of stated rate. Government and Non-profit rates Full Day:7 am to midnight 216.00 Includes 5 tables and 25 chairs CPI Reso.2019-060 312.00 Includes 10 tables and 75 chairs CPI Reso.2019-060 376.00 Includes 15 tables and 100 chairs CPI Reso.2019-060 Half Day:Any combination of between two and eight hours` 161.00 Includes 5 tables and 25 chairs CPI Reso.2019-060 258.00 Includes 10 tables and 75 chairs CPI Reso.2019-060 312.00 Includes 15 tables and 100 chairs CPI Reso.2019.060 Minimum Day(up to 2 hours) 77.00 Includes 5 tables and 25 chairs CPI Reso.20194160 174.00 Includes 10 tables and 75 chairs CPI Reso.2019-060 216.00 Includes 15 tables and AGO chairs CPI Reso.2019-060 Cleaning/Damage deposit 268.00 CPI Reso.2019-060 Equipment: Microphone/PA,Movie Screen, Built-in Projector 10.00 Each CPI Reso.2019-060 Council Chambers(Government On 30.00 Per Hour CPI Reso.2019-060 Downtown Promenade 346.00 Security Deposit CPI Reso.2019-060 Page 1 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance CITY TREASURER Assessment Splits(resulting from parcel splits) Two-to four-way splits 88.00 Reso.2006-90 Proposition 4 Each additional lot over four ins lit 10.00 Reso.2006-90 Proposition 4 Release of Assessment Lien Recording Fee 13.00 Reso.2014-069 Proposition 4 Retumed Payment Charge checks.credit cards.etc. 35.00 Reso.2014-069 G.C.§6157 Parking Permits Downtown Mall 63.00 CPI Reso.2019-060 Public Parking Lots 40.00 CPI Reso.2019-060 Construction Parking Meter Hoods 5.00 Deposit per hood Ordinance 967 R.M.C.11.28.090 Construction Parkin Meter Hoods 10.00 Plus:per quarter Ordinance 967 R.M.C.11.29.100 Utility Parking Meter Hoods 5.00 Deposit per hood Ordinance 967 R.M.C.11.28.090 Unlit Parkin Meter Hoods 10.00 Plus: er uarter er hood Ordinance 967 R.M.C.11.29.100 COMMUNITY SERVICES DEPARTMENT-RECREATION DIVISION NOTE.For Field rentals only: Local Non-Profit Youth Leagues are exempt from the Use Fees,but are required to pay any Materials cost. Non-Profit Youth'Travel'teams are still subject to the Use Fees. Definitions: Non-Profit Use:Use by any non-profit agency/group that offers a non-restrictive activity,recreational in nature. Any proceeds from this use must be directed toward community service group activities. Commercial Use'. An use that creates revenue to be used at the discretion of the s ors ring group. Technology Surcharge 5.00% Applies to all program registrations. Reso.2010-164 Baseball/Softball Fields. Light Fee 36.00 CPI Reso.2019-060 Proposition 4 Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060 Use Fee-Three Hours and More 100.00 CPI Reso.2019-060 Additional Labor 17.00 Per Hour CPI Reso.2019-060 Proposition 4 Tiger Field Light Fee 36.00 CPI Reso.2019-060 Proposition 4 Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060 Use Fee-Three Hours and More 100.00 CPI Reso.2019-060 Additional Labor 17.00 Per Hour CPI Reso.2019-060 Materials At Cost Reso.2016-071 Soccer Fields. Light Fee 36.00 CPI Reso.2019-060 Proposition 4 Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060 Use Fee-Three Hours and More 100.00 CPI Reso.2019-060 Additional labor 17.00 Per Hour CPI Reso.2019-060 Proposition 4 Materials At Cost Reso.2016-071 Enterprise Roller Hockey Rink/Pickle Ball Court Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060 Use Fee-Three Hours and More 100.00 CPI Reso.2019-060 Additional Labor 17.00 CPI Reso.2019-060 Materials At Cost Reso.2016-071 Park Site and Trail Reservation Fee per session(Except Fantasy Fountain,Junior Bike Park,Lake Redding Gazebo&Pavilion. Sculpture Park and Civic Am hitheatre: 50.00 CPI Reso.2019-060 Fantasy Fountain Per 2-Hour Session 300.00 CPI Reso.2019-060 Junior Bike Park Per 2-Hour Session 300.00 CPI Reso.2019.060 Lake Redding Gazebo&Pavilion Per Session 90.00 CPI Reso.2019-060 sculpture Park Reservation Fee 50.00 CPI Reso.2019-060 Proposition 4 Non-Profit:Reservation Fee with Community Room Restroom 75.00 CPI Reso.2019-060 Proposition 4 Commercial: Reservation Fee with Community Room 101.00 CPI Reso.2019-060 Proposition 4 Restroom Cleaning/Damage Deposit If Required) 345.00 CPI Reso.2019-060 Proposition 4 Civic Amphitheatre Individuals and Local Non-Profit Reservation Fee 50.00 CPI Reso.2019-060 Proposition 4 Non-Local Non-Profit Reservation Fee 139.00 CPI Reso.2019-060 Proposition 4 Commercial(Standard)Use Fee 276.00 CPI Reso.2019-060 Proposition 4 Ckanin /Damage Deposit(If Required) 345.00 CPI Reso.2019-060 jProposrhon4 Cancellation Fee Charged on all Refunds 7.00 Reso.2014-069 Redding Aquatic Center. Lost Card Re lacement Fee 7.00 Per Card Replaced Reso.2006-90 Page 2 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance COMMUNITY SERVICES DEPARTMENT-RECREATION DIVISION-Continued Caldwell Recreation Center. Rental Fee(All day use during normal park hours;$220.50 due when making reservations with a completed Rental Application and $220.50 due 60 days prior to the event or at the time of making the reservation if less than 60 days prior to the event.) 435.00 CPI Reso.2019-060 Proposition 4 Cleaning/Damage Deposit(fee due 3 weeks prior to the event) 323.00 CPI Reso.2019-060 Pro osition 4 Benton Dog Park Park Lighting(Park lights to be controlled and fees collected For Each 15 Minutes of Park Lights. Reso.2006-90 through the use of coin-operated timers.) 0.25 Class Cancellation Fee 7.00 Per Individual Per Session Reso.2007-175 Sundial Bridge:Deck Lighting Policy Special Requests from Community 100.00 Per Request Reso.20184132 FIRE DEPARTMENT Hazardous Material Response Engine 37.00 Per quarter hour per engine CPI Reso.2019-060 Proposition Per quarter hour per incident Commander Incident 11.00 and actual cost per incident CPI Reso.20194160 Proposition 4 Fire Prevention Inspection Report 5200. Per report CPI Reso.2019-060 Proposition 4 Fire Hazard Mitigation Inspection 16.00 Reso.2007-175 Land Clearing Permit 33.00 Per permit CPI Reso.2019-060 Proposition 4 Agricultural Bum Permit 50.00 Per permit CPI Reso.2019-060 Proposition 4 Licensed Care Pre-Inspection(prior to occupancy) Facilities 25 or less 50.00 Reso.2006-90 Proposition 4 Facilities greater than 25 100.00 Reso.2007-175 Proposition 4 Investigation Report 75.00 Per report MO 2011-108 Proposition 4 Basic Fire Report 15.00 Per report Reso.2006-90 Proposition 4 Weed Abatement Fee 74.00 Admin fee+cost of procedures CPI Reso.2019-060 Proposition 4 Weed Abatement Appeal Fee 312.00 Includes Hearing Officer I CPI Reso.2019-060 Proposition 4 False Alarm Fee 658.00 CPI Reso.2019-060 Proposition 4 Emergency Response to DUI collision 312.00 CPI Reso.2019-060 Fire Inspection Third Time and Thereafter 50.00 Reso.2006-90 Fire Inspection Fee Fire Clearance Annual Inspection Facilities 7-25 occupants 70.00 Flat Fee Reso.2006-90 Facilities 26.50 occupants 105.00 Flat Fee Reso.2006-90 Facilities over 50 occupants 140.00 Flat Fee Reso.2006-90 Annual Licensed Care Inspection Facilities 7-25 occupants 70.00 Flat Fee Reso.2006-90 Facilities 26-50 occupants 105.00 Flat Fee Reso.2006-90 Facilities over 50 occupants 140.00 Flat Fee Reso.2006-90 Fire Safety Inspection Drinking/Dining-Over 50 occupants 70.00 Per hour MO 2011-108 Hotel,Motel,Apartment House 70.00 Per hour MO 2011-108 Hazardous Occupancy-(High Risk Businesses) 70.00 Per hour MO 2011-108 Other State Required Inspections 70.00 Per hour MO 2011-108 Day Care Commercial 70.00 Flat Fee Reso.2006-90 Residential-(Large Family Daycare) 50.00 Flat Fee Reso.2006-90 Hospitals,Surgical Centers,I-Occupancies 70.00 Per Hour Reso.2006-90 Fire Code Permits: All R.M.C. Aircraft Refueling Vehicles 49.00 Per Pam-it CPI Reso.2019-060 9.20.010+ Aircraft Repair Hangars 49.00 Per Permit CPI Reso.2019-060 9.20.130 Automobile Wrecking Yards 104.00 Per Permit CPI Reso.2019-060 Bonfires or Rubbish Fires 31.00 Per Permit CPI Reso.2019.060 Candles and Open Flames in Public Assembly 49.00 Per Permit CPI Reso.2019-060 Combustible Fiber Storage 49.00 Per Perrot CPI Reso.2019-060 Compressed Gases and Cryogens 49.00 Per Permit CPI Reso.2019-060 Explosive and Blasting Permits: Blasting 104.00 Per Permit CPI Reso.2019-060 Powder Sales 49.00 Per Permit CPI Reso.2019.060 Transportation 16.00 Per Permit CPI Reso.2019-060 Fireworks: Public Display 199.00 Per Event CPI Reso.2019-060 Special Effects 107.00 Per Event CPI Reso.2019-060 Flammable Liquids: Storage,handling,or use of Class I liquids in excess of 5 gallons inside a building or 10 gallons not inside a building 49.00 Per Permit CPI Reso.2019-060 Storage,handling,or use of Class 11 or III-A liquids in excess of 25 gallons in a building or 60 gallons not in a building 49.00 Per Permit CPI Reso.2019-060 Install or after any flammable liquid tank or piping 49.00 Per Tank CPI Reso.2019-060 Garages 49.00 Per Permit CPI Reso.2019-060 9.20.130 Hazardous Materials 104.00 Per Permit CPI Reso.2019.060 Hazardous Production Materials 104.00 Per Permit CPI Reso.2019-060 High Piled Storage 49.00 Per Permit CPI Reso.2019-060 Junk yards 104.00 Per Permit CPI Reso.2019-060 Liquefied Petroleum Gas 49.00 Per Permit CPI Reso.2019-060 Magnesium Working 49.00 Per Permit CPI Reso.2019-060 Covered Mall,Special Uses 49.00 Per Permit CPI Reso.2019-060 Places of Assembly 49.00 Per Permit CPI Reso.2019-060 Page 3 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance FIRE DEPARTMENT-Continued Public Assembly Pemxt Fee 49.00 Per Permit CPI Reso.2019-060 Tents&Canopies 49.00 Per Permit CPI Reso.2019-060 Air-Support Structures 49.00 Per Permit CPI Reso.2019-060 Welding or Cutting Operations 49.00 Per Permit CPI Reso.2019-060 Storage and handling of Level 2 and 3 aerosol products in excess of 500 pounds 49.00 Per Permit CPI Reso.2019-060 Carnivals and fairs or festival 48.00 Per Permit Reso.2009.110 Motor vehicle fuel dispensing stations 48.00 Per Permit Reso.2009-110 Tire Storage 48.00 Per Permit Reso.2009-110 Permit Reinspection 27.00 Per Hour(1/2 hour min charge) CPI Reso.2019-060 Permit Inspection on Sunday Double the stated fee Reso.2006-90 Other Required Fire Code Permits 45.00 Per Permit Reso.2009-110 Conference/Meeting Room 1-4 hours 34.00 CPI Reso.2019-060 Proposition 4 4.1 or more hours 67.00 CPI Raso.2019-060 Proposition 4 Photograph Copies 7.70 Per each copy CPI Reso.2019-060 POLICE DEPARTMENT Fingerprint Rolling Fee 25.00 Reso.2017-054 P.C.§13300 Police Report copies(pickup) C.V.C.§20012& Paper copy 0.25 Per Page Reso.2006.90 G.C.§6257 Microfilm copy 0.55 Per page microfilm copy Reso.2006-90 Reports mailed to requester 40 pages and under 5.00 Reso.2006-90 Over 40 pages 5.00 Plus$0.25 for each page over 40 pages Reso.2006-90 Log entries 0.25 Per Pae Reso.2006-90 License to sell firearms 30.00 Reso.2009-110 PC 12071 License to sell firearms renewal 15.00 Reso.2009-110 Concealed weapons permits: New 59.00 Plus DOJ Fees CPI Reso.2019-060 P.C.§12054 Renewal 35.00 Plus DOJ Fees CPI Reso.2019-060 P.C.§12054 Second-hand dealer permit: R.M.C.6.30.040& Initial Fee 65.00 Plus DOJ Fees CPI Reso.2019-060 Proposition 4 Per employee 25.00 Plus DOJ Fees CPI Reso.2019-060 Renewal 65.00 Plus DOJ Fees CPI Reso.2019-060 Cardroom license,application 828.00 CPI Reso.2019-060 R.M.C.6.14.060 Cardroom table fee,per table per year 334.00 Per table,per year CPI Reso.2019-060 R.M.C.8.14.060 Cardroom pemtit new(ownerlemployee) 42.00 Plus DOJ Fees CPI Reso,2019-060 R.M.C.8.14.100 Cardroom permit renewal 25.00 CPI Reso.2019-060 R.M.C.6.14.100 Emergency response DUI arrest&traffic collision 98.00 Per hour per officer CPI Reso.2019-060 G.C.153150.98-- Taxi inspection(yearly) 21.00 Per Taxi Reso.2006-90 Proposition 4 Taxi Driver applicant DOJ Fees+fingerprinting Reso.2006-90 Proposition 4 Tow Truck inspection(yearly) 46.00 Per Truck CPI Reso.2019-060 Proposition 4 Tow Truck re-inspection Topside 96.00 Per Truck CPI Reso.2019-060 Proposition Underneath 194.00 Per Truck CPI Reso.2019-060 Proposition 4 HUD Applicant Clearance 43.00 Plus DOJ Fees Reso.2014-069 Photograph Copies: Black&White or Color 2.00 Per Photo Reso.2006-90 G.C.§6257 Digital pictures on CD includes mailing) 4.00 Per CO Reso.2006-90 G.C.§6257 Audiocassette copies includes cost of mailing) 4.00 Per tape Reso.2006-90 G.C.§6257 Videocassette copies 20.00 Plus cost of tape&reproduct. Reso.2006-90 G.C.§6257 Towed vehicle release fee 160.00 Reso.2007-175 Ordinance 2226 Repossessed vehicle fee 15.00 Reso.2006-90 G.C.§41612 Prop"return fee 16.00 Plus cost of C.O.D. Reso.2006-90 Proposition 4 Publications/Equipment Usage: Daily bulletin 0.25 Per Page Reso,2006-90 Not required Firearms TrainingSimulator 23.00 Per Hour(agencies on:::] Reso.2006-90 Not required Late Payment Penalty 20.00 Reso.2009-23 ELECTRIC UTILITY DEPARTMENT-Customer Service On-site delivery of disconnect notification(door-hanger) 50.00 Reso.2006-90 R.M.C.14.20.020 Field Collection 50.00 Reso.2006-90 Proposition 4 Voltmeter Reading 75.00 MO 2011-108 Proposition 4 Meter Tampering-Fee 500.00 Up to 8500 Reso.2006-90 Proposition 4 Priority Service Connection Fee when called after 11:00 am 50.00 Called after 11:00 am on day of connection Reso.2017-104 Proposition 4 Watt-Hour Meter Testing Fee 75.00 MO 2011-108 Proposition 4 Credit Report 5.00 Reso.2006-90 Proposition 4 Service Reconnection at Pole/Transformer 99.00 MO 2011-108 Service Disconnection at Pole/Transformer 99.00 MO 2011-108 Load Profiling/Energy Usage Monitoring ProgranJlandline or Ethernet net cable 50.001 month Load Profiling/Energy Usage Monitoring PrograMwireless connection 65.001 month Level II REU Energy Audit 125.00 ELECTRIC UTILITY DEPARTMENT Conference/Meeting Room: 1-4 hours 35.00 CPI Reso.2019-060 Proposition 4 4.1-or more hours/da 69.00 CPI Reso.2019-060 Proosition 4 Page 4 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019.20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance ELECTRIC UTILITY DEPARTMENT Permit Processin Fees Temporary Power Connection and Meter Set Fee 51.00 With Permit CPI Reso.2019-060 PUBLIC WORKS DEPARTMENT-MUNICIPAL UTILITIES Water Water Service Installation(includes meter) Service Size,518"to 3/4"meter1,364.00 CCI Reso.2019-060 R.M.C.14.08.310 Service Size,314"meter 1,420.00 CCI Reso.2019.060 R.M.C.14.08.310 Service Size,1"meter 1.489.00 CCI Reso.2019.060 R.M.C.14.08.310 Service Size,11/2"meter 1.961.00 CCI Reso.2019-060 R.M.C.14.08.310 Service Size,2"meter 2,095.00 CCI Reso.2019-060 R.M.C.14.08.310 Time and Material plus Service Size,3"-12"meter 15% Reso 2017-054 R.M.C.14.08.310 Water Meter Set Installation(meter only) Meter Size,5/8"to 3/4"meter 118.00 CCI Raw.2019-060 R.M.C.14.08.310 Meter Size,314"meter 143.00 CCI Reso.2019.060 R.M.C.14.08.310 Meter Size,1"meter 190.00 CCI Reso 2017-054 R.M.C.14.08.310 Meter Size,1112"meter 446.00 CCI Reso.2019-060 R.M.C.14.08.310 Meter Size,2"meter 526.00 CCI Reso.2019.060 R.M.C.14.08.310 Paving Cut Charge water service779.00 CCI Reso,2019-060 R.M.C.14.08.310 Water Service Split(multiple meters onparcel) 616.00 CCI Reso.2019-060 R.M.C.14.08.310 Installation of new water services by City utility crews is not available Reso.2008-97 on designated arterial streets and State highways. Installation of new water services in these areas will be the responsibility of the owner. Backflow Prevention Assembly and Testing 3.20 Per month CPI Reso.2019-060 RMC 14.08.160 Commemal Fire Service Commodity Charge Four(4)times the regular service rate RMC 14.08.320 Hydrant Meter Charge $25 Non-refundable Charge.($225 Refundable Deposit) RMC 14.08.075 Private Fire Hydrant Service 5.20 Per Hydrant CPI Reso.2019-060 RMC 14.08.370 Private Fire Service Lines: RMC 14.08.320 Fixed Monthly service charge RMC 14.08.320 Line size 4" 4.20 CPI Reso.2019-060 RMC 14.08.320 Line size 6" 6.30 CPI Read.2019-060 RMC 14.08.320 Line size 8" 8.40 CPI Reso.2019-060 RMC 14.08.320 Line size 10" 10.00 CPI Reso.2019-060 RMC 14.08.320 Line size 12" 12.00 CPI Reso.2019-060 RMC 14.08.320 Fire Hydrant Service Outside Incorporated area of City Demand Charge 11.00 Per Month CPI Reso.2019-060 Maintenance Cost 13.00 Per Month CPI Reso.2019-060 Billing/Collection Charge 3.70 Per Month CPI Reso.2019-060 City Council Policy Surcharge/Monthly Service Fee times 1.5 13.00 Per Month CPI Reso.2019-060 1411 Total per month 40.70 Wastewater Wastewater Line Tap Tap Fee,6x4 to 8x6 219.00 CCI Reso.2019-060 R.M.C.14.16.205 Wastewater Groundwater or Surface Water Discharge Permit Application Fee 500.00 Reso.2006-90 R.M.C.14.16.250 Wastewater Groundwater or Surface Water Discharge Permit Renewal Fee 100.00 Reso.2006-90 R.M.C.14.16.250 1 times the rate per volume discharged as Wastewater Groundwater or Surface Water Discharge Service 1 times the rate listed in R.M.C.14.16.240.A for consumption. Reso.2006-90 R.M.C.14.16.250 Charge Storm Drain Drainage Basin Inlet Marker installed -Required on all new inlets 17.00 CCI Reso.2019-060 PUBLIC WORKS DEPARTMENT-ENGINEERING DIVISION Applied to all fees except Transportation Technology Surcharge 5.00%Permits Reso.2007-175 Permit Processing Fees Plan review of Public Improvement: Permit Processing for improvements,landscape maintenance distract formation,and final map review associated with new development Cost (1%of the estimated cost of construction to be paid to the City at (includes overhead as Cost the time plans are submitted for review,the balance based on actual annually approved by (includes overhead as annually approved by cost of review to be paid prior to the beginning of construction.) Caltrans) Caltrans Reso.2013-061 Cost (includes overhead as Cost annually approved by (includes overhead as annually approved by Change order Paid prior to acceptance of improvements) Caltrans) Cahrans Reso.2013-061 Public Works Inspection: Inspection of public improvements associated with new development to be paid by developer. At the time of permit issuance a deposit of Cost 2%of the value of the construction shall be deposited with the City. (includes overhead as Cost The unused balance,if any,*11 be returned after final acceptance annually approved by (includes overhead as annually approved by of the improvements. Caltrans) Caltrans) Reso.2013-061 R.M.C.17.74.05 Reinspection-If during final inspection the work has not been approved,all subsequent inspections will be based on actual cost of ins ection and are not subject to the 2%maximum inspection fee. Final paric,l map review fee coven 2 plan checks 410.00 CPI Reso.2019-060R.M.C.17.16.030 8 Page 5 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance PERMIT PROCESSING FEES-Continued Lot merger/property line adjustments for 2 parcels with maximum of 2 plan checks 194.00 CPI Reso.2019-060 Cost Cost (includes overhead as annually approved by (includes overhead as annually approved by Third and subsequent checks Caltrans) Caltrans) Reso.2013-061 Cost Cost (includes overhead as annually approved by (includes overhead as annually approved by Lot merger/property line adjustment for 3 or more lots($150 Caltrans) Caltrans) deposit due with application-balance due pFOF to recordation Reso.2013-061 Grading Permit. 50 to 1,000 yards 462.00 CPI Reso.2019-060 R.M.C.16.4.070 1,001 to 2,000 yards 560.00 CPI Reso.2019-060 R.M.C.16.4.070 2,001 to 3,000 yards 658.00 CPI Reso.2019-060 R.M.C.16.4.070 3,001 to 4,000 yards 754.00 CPI Reso.2019-060 R.M.C.16.4.070 4.001 to 5,000 yards 862.00 CPI Reso.2019-060 R.M.C.16.4.070 5,001 to 10,000 yards 1,034.00 CPI Reso.2019-060 R.M.C.16.4.070 For each additional 5,000 yards or fraction thereof in excess of 10,000 yards 199.00 CPI Reso.2019-060 R.M.C.16.4.070 Clearing(for grading): 1 to 2 acres 104.00 CPI Reso.2019-060 R.M.C.16.4.070 2.1 to 5 acres 150.00 CPI Reso.2019-060 R.M.C.16.4.070 5.1 to 10 acres 312.00 CPI Reso.2019-060 R.M.C.16.4.070 For each additional 5 acres or fraction thereof in excess of 10 acres 46.00 CPI Reso.2019-060 R.M.C.16.4.070 Appeals for radio 81.00 CPI Reso.2019-060 R.M.C.16.4.070 Encroachment permit fees(2%due at time of submittal for plan review,remaining 3%due when permit is issued. Exception: Encroachment permit applications for public improvements of $500,000 or greater may request plan check and inspection fees be calculated based on the subdivision related improvement provisions $78.00 or 5%of Engineer's Estimate, of this schedule.) 83.00 whichever is greater CPI Reso.2019-060 Proposition 4 Transportation Permit: Single occurrence 16.00 Reso.2006-175 V.C.35795(b) Annual or repetitive occurrence 90.00 Reso.2006-175 V.C.35795(b) DEVELOPMENT SERVICES DEPARTMENT-ALL DIVISIONS Technology Surcharge 5.00%1 Applies to all fees Reso.2007-175 DEVELOPMENT SERVICES DEPARTMENT-BUILDING DIVISION Building Permit Microfilming f Imaging Charge 1.50 CPI Reso.2019-060 Froposition 4 Imposed at full cost of procedure Reso.88-364 Abatements-Imposed when no response to attorney demand letter Proposition 4 Permit Processing Fees Building Permit Fees Total Valuation $ 1 to$ 500 24.60 CPI Reso.2019-060 Plus 3.32 for each additional 100 over first 501 to 2,000 24.60 500 CPI Reso.2019-060 Plus 14.70 for each add'I 1000 over first 2,001 to 25,000 74.40 2,000 CPI Reso.2019-060 Plus 10.70 for each add'I 1000 over first 25,001 to 50.000 412.50 25,000 CPI Reso.2019-060 Plus 7.35 for each add]1000 over first 50,001 to 100,000 679.90 50,000 CPI Reso.2019-060 Plus 5.69 for each add'I 1000 over first 100,001 to 500,000 1,047.20 100,000 CPI Reso.2019-060 Plus 4.87 for each add'I 1000 over first 500,001 to 1,000,000 3,323.90 500,000 CPI Reso.2019-060 Plus 3.32 for each add'I 1000 over first 1,000,001 and up 5,758.80 1,000,000 CPI Reso.2019-060 Temporary Certificate of Occupancy Large Commercial 550.00 First 60 daysCPI Reso.2019-060 550.00 Each additional 30 days CPI Reso.2019-060 Small Commercial 279.00 First 60 days CPI Reso.2019-060 279.00 Each additional 30 days CPI Reso.2019-060 Residential 53.00 CPI Reso.2019-060 Model Home Permit Residential 334.00 CPI Reso.2019-060 Building Permit Prior to Subdivision Acceptance Residential 279.00 CPI Reso.2019-060 Authorization to Start Work Commercial 167.00 CPI Reso.2019-060 Water Efficient Landscape Documentation 2,500 square feet to 40,000 square feet of Landscaping 364.00 CPI Reso.2019-060 Ordinance 2449 Over 40,000 square feet of Landscaping 511.00 CPI Reso.2019-060 Ordinance 2449 Note:Plan check fees are 65%of building permit fees. Fees for repetitive plan checks(where the same plans are used in more than one location)may be adjusted at the discretion of the Director of Typically 50%of cost of original plan check Development Services or his designee, fee Plan Check-Outside normal business hours 116.00' Per Hour 2 hour minimum CPI Reso.2019-060 Electric Permit Fees Permit Issuance-each permit 45.00 ' Per each permit CPI Reso.2019-060 Each supplemental permit 7.40 Per each supplemental permit CPI Reso.2019-060 System Fee Schedule New Residential Building Page 6 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance ELECTRIC PERMIT FEES-Continued Multi Family 0.054 Per square foot CPI Reso.2019-060 Single-two family 0.063 Persquare foot CPI Reso.2019-060 New Non-residential Buildings 3,000 square fee 0.074 Per square foot CPI Reso.2019-060 3,001 to 10,000 square feet 0.063 Per square foot CPI Reso.2019-060 Over 10,000 square feet 0.047 Per square foot CPI Reso.2019-060 Private Swimming Pools 47.00 Per swimming pool CPI Reso.2019-060 Electric Service 1 -200 amps 30.00 CPI Reso.2019-060 201-1000 amps 60.00 CPI Reso.2019-060 over 1000 ams 124.00 CPI Reso.2019-060 Unit Fee Schedule Receptacle,Switch and Lighting Outlets First 20 1.20 Each CPI Reso.2019-060 Additional Outlets 0.80 Each CPI Reso.2019-060 Lighting Fixtures First 20 1.20 Each CPI Reso.2019-060 Additional Fixtures 0.80 Each CPI Reso.2019-060 Pole or Platform Lighting Fixtures 1.20 Each CPI Reso.2019-060 Temporary Power Pole Inspection 27.00 CPI Reso.2019-060 Theatrical Type Lighting Fixtures 1.20 Each CPI Reso.2019-060 Residential Appliances 4.70 Each CPI Reso.2019-060 Nonresidential Appliances 4.70 Each CPI Reso.2019-060 Photo Voltaic Systems-Residential 7 to 15 Kw 450.00 Reso.2015-071 AB 1414 16 Kw and up Plus 15.00 per Kw or fraction there of above 450.00 15 Kw Reso.2015-071 AB 1414 Photo Voltaic Systems-Commercial 1 to 50 Kw 1,000.00 Reso.2015-071 SB 1222 51 to 250 Kw Plus 7.00 per Kw or fraction there of 1,000.00 between 51 Kw and 250 Kw Reso.2015-071 SB 1222 251 Kw and up Plus 5.00 per Kw for each Kw or fraction 2,400.00 there of above 250 Kw Reso.2015-071 SB 1222 Power Apparatus per HP,KW,KAVA or KVAR Up to and including 1 4.70 Each CPI Reso.2019-060 Over 1 and not over 10 12.90 Each CPI Reso.2019-060 Over 10 and not over 50 25.80 Each CPI Reso.2019-060 Over 50 and not over 100 48.40 Each CPI Reso.2019-060 Over 100 74.30 Each CPI Reso.2019-060 Busways-Trolley and plug-in type 7.50 Each CPI Reso.2019-060 Signs,Outline Lighting.and Marquees Supplied from one branch circuit 75.00 Each CPI Reso.2019-060 Additional Branch Circuits per Sign Services 8.00 Each CPI Reso.2019-060 600 Volts or Less and not over 200 amperes 80.00 Each CPI Reso.2019-060 600 volts or less 8 over 200 amperes to 1,000 amps. 90.00 Each CPI Reso.2019-060 Over 600 volts or over 1000 amperes 150.00 Each CPI Reso.2019-060 Misc.Apparatus,Circuits,Conduits,and Conductors for which a permit is required but no other fee is set 25.00 ' CPI Reso.2019-060 Energy Service Change(Residential) 125.00 CPI Reso.2019-060 Energy Service Chane Commercial 175.00 ' CPI Reso.2019-060 Energy Permit Fee 45.00 ' CPI Reso.2019-060 Fire Permit Fees Fire 8 Life Safety Plan Check and Inspection Commercial and Multi-Family Sprinkler Plan Check Fee Total Value $ 1.00 to $ 500.00 3.00 CPI Reso.2019-060 Proposition 4 Plus$0.38 for each add'I$100 over the first $ 501.00 to$ 2,000.00 3.00 $500 CPI Reso.2019-060 Proposition 4 Plus$1.79 for each add'I$1000 over the first $ 2,001.00 to$ 25,000.00 8.70 $2,000 CPI Reso.2019-060 Proposition 4 Plus$1.24 for each add'I$1,000 over the $ 25,001.00 to$ 50,000.00 49.80 first$25,000 CPI Reso.2019-060 Proposition 4 Plus$0.87 for each add1$1,000 over the $ 50,001.00 to$100,000.00 80.90first$50,000 CPI Reso.2019.060 Proposition 4 Plus$0.66 for each add'I$1,000 over the $ 100.001.00 to$ 500,000.00 124.60 first$100,000 CPI Reso.2019-060 Proposition 4 Plus$0.55 for each add'I$1,000 over the $ 500,001.00 to$1,000.000.00 387.60 first$500,000 CPI Reso.2019-060 Proposition 4 Plus$0.43 for each add]$1,000 over the $1,000,001.00 and up 665.00 first$1,000,000 CPI Reso.2019-060 Proposition 4 Miscellaneous Plan Check 72.00 Cost+71%Overhead Reso.2013-078 Proposition 4 Buckeye Single Family Resident Site Review 50.00 ' Reso.2006-90 8ucke a Sin le Famil Resident Site Visit 50.00 ' Reso.2006-90 R-3 Fire Sprinkler Plan Check 100.00 ' CPI Reso.2019-060 Commercial Sprinkler System Inspection and Test Per Sprinkler Riser or Floor plus 100.00 ' Per sprinkler nser CPI Reso.2019-060 Per Sp nnkler Head 2.10 ' Per S nnkler Head CPI Reso.2019-060 R-3 Fire S nnkler Feld Ins ection and Test 2.10 ' Per Sprinkler Head CPI Reso.2019-060 Fire S rinkler Re-Ins ection 3rd time 8 thereafter 50.00 Reso.2006-90 R-1,2,4 Fire Sprinkler Field Inspection and Test Per Sprinkler Riser or Floor plus 100.00 ' Per sprinkler nser CPI Reso.2019-060 Per S rinkler Head 2.10 ' Per S rinkler Head CPI Reso.2019.060 Hood and Duct Fire Suppression System Plan Review 8 Inspection 125.00 ' CPI Reso.2019-060 Review 8 Inspection of Fire Service Line 66.00 CPI Reso.2019-060 Review 8 Ins ection of Fire Pum 66.00 CPI Reso.2019-060 Review 8 Ins ection of Stand i e Systems 66.00 CPI Reso.2019-060 -7 Fire Alarm Plan Check Fee 107.00 CPI Reso.2019-060 Fire Alarm Field Inspection and Test plus 67.00 CPI Reso.2019-060 Plusper devise 1.20 Per device CPI Reso.2019-060 Page 7 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance Mechanical Permit Fees Permh Issuance 45.00 ' Each CPI Reso.2019-060 Su Iemental Permit Issuance 7.50 Each CPI Reso.2019-060 Unit Fee Schedule Installation of force air or gravity type furnace or burner Up to and including 100,000 Btu/h 15.00 Per Each CPI Reso.2019-060 Over 100,000 Btu/h 28.00 Per Each CPI Reso.2019-060 Installation or relocation of floor furnace 15.00 Per Each CPI Reso.2019-060 Installation or relocation of suspended heater,recessed wall heater or floor mounted heater 15.00 Per Each CPI Reso.2019-060 Installation,relocation or replacement of appliance vent 7.50 Per Each CPI Reso.2019-060 Repair or alteration of,or addition of each heating appliance, refrigeration unit,cooling unit,absorption unit or each heating, cooling,absorption or evaporative cooling system including 15.00 Per Each CPI Reso.2019-060 Installation or relocation of boiler or compressor Replacement of each heating appliance.refrigeration unit,cooling unit,absorbtion unit or each heating,cooling, absorbtion or evaporative cooling system including installation of controls(Residential) 125.00 ' Per Each CPI Reso.2019-060 Replacement of each heating appliance,refrigeration unit,cooling unit,absorbtion unit or each heating,cooling, absorbtion or evaporative cooling system including installation of controls(Commercial) 150.00' Per Each CPI Reso.2019-060 Up to 3 horsepower or 100,000 Stu/h 15.00 Per Each CPI Reso.2019-060 Up to 15 horsepower or 500,000 Btu/h 28.00 Per Each CPI Reso.2019-060 Up to 30 horsepower or 1,000,000 Btu/h 36.00 Per Each CPI Reso.2019-060 Up to 50 horsepower or 1,750,000 Bluth 53.00 Per Each CPI Reso.2019-060 Over 50 horsepower or 1,750,000 Btu/h 91.00 Per Each CPI Reso.2019-060 Air-handling unit Up to 10,000 cubic feet per minute 10.00 Per Each CPI Reso.2019-060 Over 10,000 cubic feet per minute 18.00 Per Each CPI Reso.2019-060 Evaporative Cooler,not portable 15.00 Per Each CPI Reso.2019-060 Ventilation fan connected to single duct 7.50 Per Each CPI Reso.2019-060 Ventilation system not part of heating or a/c system 10.00 Per Each CPI Reso.2019-060 Installation of each hood served by mechanical exhaust 10.00 Per Each CPI Reso.2019-060 Installation or relocation of domestic incinerator 18.00 Per Each CPI Reso.2019-060 Installation or relocation of conmercial or industrial type Per Each incinerator 75.00 CPI Reso.2019-060 Solar Collector 6.20 Per Collector CPI Reso.2019-060 Solar Storage Tank 6.20 Per Tank CPI Reso.2019-060 Plumbing Permit Fees Permit Issuance 45.00' Per Each CPI Reso.2019-060 Supplemental Issuance 7.50 Per Each CPI Reso.2019-060 Unit Fee Schedule Plumbing Fixture or Trap 9.80 Per Each CPI Reso.2019-060 Building Sewer or Trailer Park Sewer 26.00 Per Each CPI Reso.2019-060 Rainwater System 9.80 Per Each CPI Reso.2019-060 Cesspool 36.00 Per Each CPI Reso.2019-060 Private Sewage Disposal System 75.00 Per Each CPI Reso.2019-060 Swimming Pool 75.00 Per Each CPI Reso.2019-060 Water heater and/or vent 12.00 Per Each CPI Reso.2019-060 Industrial-waste pretreatment interceptor 20.00 Per Each CPI Reso.2019-060 Installation,alteration,or repair of water piping and or water- treating equipment 4.70 Per Each CPI Reso.2019-060 Repair or alteration of drainage or vent piping 4.70 Per Each CPI Reso.2019-060 Lawn Sprinkler System on any one Meter 14.00 Per Each CPI Reso.2019-060 Atmospheric Type Vacuum Breakers Reso.2019-060 1 to 5 12.00 Per Each CPI Reso.2019-060 Overs 3.90 Per Each CPI Reso.2019-060 Back-flow Protection Device 2 inches or smaller 12.00 Per Each CPI Reso.2019-060 Over 2 inches 26.00 Per Each CPI Reso.2019460 Gas Piping System 1 to four 4.70 Per Each CPI Reso.2019-060 5 or more 1.20 Per Each CPI Reso.2019-060 Water Heater replacement(Residential) 100.00' Per Each CPI Reso.2019-060 Water Heater replacement(Commercial) 150.00' Per Each CPI Reso.2019-060 Other Inspections and Fees(AN Permit Types) Inspection Outside Normal Business Hours 119.00 Per Hour(2 hour minimum) CPI Reso.2019-060 Reinspection Fees Assessed Under Provisions of Section 108.8 77.00 Per Hour CPI Reso.2019-060 Inspection where no separate fee is indicated 77.00 Per Hour CPI Reso.2019-060 Additional Administrative Review/Plan Review 86.00 Per Hour CPI Reso.2019-060 Appliances Regulated by Code not in other category 10.00 CPI Reso.2019-060 Demolition Permit 150.00' CPI Reso.2019-060 Manufactured Home Fee 355.00 CPI Reso.2019-060 Appeals Board of Appeals 150.00' CPI Reso.2019-060 Effective Date of Fee is September 1,2019 All Building Division fees assessed on permits for the repair or replacement of structures located on properties affected by the CARR Fire shall be reduced by 20% DEVELOPMENT SERVICES DEPARTMENT-PLANNING DIVISION Pre-a lication review fee 10.00%1 10%of total application fee Reso.2006-90 Publication and Documents: Statistical Reports 6 to 11 Based on size of document Reso.2006-90 General Plan,Elements,etc. 6 t0 17 Based on size of document Reso.2006-90 Area/Specific Plans 6 to 28 Based on size of document Reso.2006-90 Large Scale Copies 6 to 28 See GIS Section Reso.2006-90 Page 8 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance DEVELOPMENT SERVICES DEPARTMENT-PLANNING DIVISION-Continued Cost for copies of documents and maps not specified above shall be established by the Development Services Director Speck Plan Preparation Cost Recovery and Update Fee Fee=A((M(1+bn)]+[U(1+b5)]}Where: Reso.2009-110 A=Number of gross acres in the project area;M=The City's average cost per gross acre of preparing the Specific Plan and the MEIR and completing any City-initiated annexation of the property. The final amount will be set at the time of final recordation of the City-initiated annexation. Where a privately initiated annexation Precedes a City-sponsored annexation(if any),the fee will be determined based on the average cost per acre,as describe above,without the annexation costs;b= The projected annual inflation rate. The average annual inflation rate used for this calculation will be based on the average inflation rate for the previous 5 years as measured by the consumer price index. The rate will be revised each year at the time of the required annual report on the Specific Plan:n=Number of years since the year of Specific Plan adoption;U=Contribution towards cost of necessary updates to the Specific Plan and accompanying Master Environmental Impact Report. Permit Processing Fees Parcel Maps/Property Line Adjustment: Administrative Parcel Map-exempt from CA Environmental All G.C.§66451.2 8 Quality Act(CEQA) 3,673.00 ' CPI Reso.2019-060 §66451.33 Major 2-to 4-Parcel Split-NOT exempt from CEQA 7,000.00 ' CPI Reso.2019-060 Property Line Adjustment 772.00' CPI Reso.2019-060 Parcel Map Amendment or Extension 3,000.00' CPI Reso.2019-060 Administrative Parcel Map Amendment or Extension 2 000.00' CPI Reso.2019-060 Subdivisions: Subdivision and Condominium Conversions: Deposit Actual Cost 5 to 25 lots 10,701.00 Cost+-100%Overhead CPI Reso.2019-060 All G.C.§66451.2 8 26 to 50 lots 13,544.00 Cost+100%Overhead CPI Reso.2019-060 51 to 100 lots 18,410.00 Cost+100%Overhead CPI Reso.2019-060 101 or more lots 20,177.00 Cost+100%Overhead CPI Reso.2019-060 Extension 2,422.00 Cost+100%Overhead CPI Reso.2019-060 Amendment 4,759.00 Cost+100%Overhead CPI Reso.2019-060 Reversion to Acreage 626.00 Cost+100%Overhead CPI Reso,2019-060 Deposit Actual Cost Cost+100%Overhead(does not include Annexation 3,983.00 LAFCO&State Fees) CPI Reso.2019-060 Abandonment: Summary Vacation 286.00 ' CPI Reso.2019-060 Proposition 4 Right of Way 4,500.00' CPI Reso.2019-060 Proposition 4 Easement 500.00' CPI Reso.2019-060 Proposition 4 Use Permits/Site Development Permits&Planned Development Plans Residential Project: First 4 units 4,000.00' CPI Reso.2019-060 G.C.§65104 5 to 49 units 10,000.00' CPI Reso.2019-060 G.C.§65104 50 or more units 15,000.00' CPI Reso.2019-060 G.C.§65104 Mobile Home Park 10,000.00' CPI Reso.2019-060 G.C.§65104 Miscellaneous 1,464.00 Plus$500 per additional location CPI Reso.2019-060 G.C.§65104 Commercial/Industrial New Construction 1 acre or less 6,000.00' CPI Reso.2019-060 G.C.§65104 1.1 to 5 acres 10,000.00' CPI Reso.2019-060 G.C.§65104 5.1 to 10 acres 13,000.00' CPI Reso.2019-060 G.C.§65104 Over 10 acres 16,000.00' CPI Reso.2019.060 G.C.§65104 Amendment 2,000.00' CPI Reso.2019-060 G.C.§65104 Extension 1,000.00' CPI Reso.2019-060 G.C.§65104 Site Development Permit-Director 3,000.00' CPI Reso.2019-060 G.C.§65104 Site Development Permit-Director Amendment 2,000.00' CPI Reso.2019-060 G.C.§65104 Temporary Use Permit 897.00' Plus$250 per additional location CPI Reso.2019-060 G.C.§65104 Final Plan Review 2,000.00' CPI Reso.2019-060 G.C.§65104 Short Term Rental-Vacation Rental 1,000.00' CPI Reso.2019-060 Tree Permit 50.00' Per Tree CPI Reso.2019-060 G.C.665104 Administrative Sign Permits: Temporary Promotional Advertising 383.00 ' CPI Reso.2019-060 G.C.§65104 Permanent Advertising Sin 713.00 ' CPI Reso.2019-060 G.C.§65104 General Plan Amendments I Specific Plans: All G.C.§65104 and §65456(b) 1 acre or less 10,000.00 ' CPI Reso.2019-060 1.1 to 10 aces 12,000.00 ' CPI Reso.2019.060 10.1 to 100 acres 15,000.00 ' CPI Reso.2019.060 Over 100 acres 20,000.00 ' CPI Reso,2019-060 Deposit Actual General Plan Amendment ext 3,305.00 Cost+100%Overhead CPI Reso.2019-060 G.C.§65104 Rezoning: Planned Development Overlay District only 3,500.00 ' CPI Reso.2019-060 G.C.§65104 1 acre or less 5,500.00 ' CPI Reso.2019-060 G.C.§65104 1.1 to 10 acres 8,500.00 ' CPI Reso.2019-060 G.C.565104 Page 9 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance Permit Processing Fees-Continued 10.1 to 100 acres 15,000.00' CPI Reso.2019-060 G.C.§65104 Over 100 acres 20,000.00' CPI Reso.2019-060 G.C. 65104 Variance: Zoning Exception 1,000.00 ' CPI Reso.2019460 G.C.§65104 Zoning Exception Amendment 1,200.00' CPI Reso.2019-060 G.C.§65104 Major Variance 6,349.00' CPI Reso.2019-060 G.C.§65104 Variance Amendment 4,048.00' CPI Reso.2019-060 G.C. 65104 Recreational Vehicle Parking Exception 500.00' CPI Reso.2019-060 Recreational Vehicle Parking Exception Renewal 250.00' CPI Reso.2019-060 Development Agreement Application 6,514.00 CPI Reso.2019-060 G.C.§65865(d) Deposit Actual Ordinance Amendment ext 3,305.00 Cost+100%Overhead CPI Reso.2019-060 G.C. 65104 Surface Mining/Reclamation Plans 5,351.00 CPI Reso.2019-060 R.M.C.18.63.050 Annual Surface Mining Inspection Administrative Fee 883.00 CPI Reso.2019-060 R.M.C.18.63.050 AN Pub.Resources Environmental Impact Report Processing: Deposit Actual Code§21089(a) 0.1 to 5 acres 4,759.00 Cost+100%Overhead CPI Reso.2019-060 5.1 to 10 acres 5,771.00 Cost+100%Overhead CPI Reso.2019-060 10.1 to 20 acres 7,396.00 Cost+100%Overhead CPI Reso.2019-060 20.1 to 40 acres 12,241.00 Cost+100%Overhead CPI Reso,2019-060 40.1 to 100 acres 18 246.00 Cost+100%Overhead CPI Reso.2019-060 Foreach 25 acres or fraction thereof in excess of 100 acres 1,927.00 Cost+100%Overhead CPI Reso,2019-060 Environmental Assessment and Negative Declarations/De Minimis 20%of total application fee Reso.2006-90 Pub.Resources Code§21089(a) Deposit Actual CEQA Mitigation Monitoring-Deposit 550.00 Cost+100%Overhead CPI Reso.2019-060 Deposit Actual Pre-application Review Fee/Traffic or Special Study Review 20%of total application Cost+100%Overhead Reso.2006-90 fee Appeals: Applicant 1,000.00 ' CPI Reso.2019-060 G.C.§65104 Administrative Permit(appeal by applicant)to Bar 1,000.00 CPI Reso.2019-060 G.C. 65104 Land Use History/Toxic Hazard Review/qualified Historic Property Designation 345.00 Plus Time and Materials CPI Reso.2019-060 Proposition 4 Street Renaming Request 0-1000 feet of street 1,257.00' CPI Reso.2019-060 Proposition 4 Over 1000 feet of street 1,482.00 CPI Reso.2019-060 Proposition 4 Floodplain Determination/Zoning Confirm Lefter/ABC Public Necessity Determin. 170.00' CPI Reso.2019.060 Elevation Certificate 156.00 CPI Reso.2019-060 Certificate of Compliance Letter 1,500.00- CPI Reso.2019-060 LOMA I LOMR Processing Letter of Map Amendment(LOMA) 327.00' CPI Read.2019-060 Letter of Map Revision LOMR 563.00 Cost+100%Overhead CPI Reso.2019-060 Effective date of fee is September 1,2019 Application Fees Residential Cannabis Cultivation Recreational 100.00 CPI Reso.2018-036 R.M.C.6.12 Residential Cannabis Cultivation Medical Medical Marijuana State ID Card Required Reso.2018-036 R.M.C.6.12 Cannabis Retail 5,000.00 CPI Reso.2018-036 R.M.C.6.12 Commerical Cannabis Cultivation 5,000.00 CPI Reso.2018-036 R.M.C.6.12 Cannabis Manufacturing 5,000.00 CPI Reso.2018-036 R.M.C.6.12 Cannabis Distribution 5,000.00 CPI Reso.2016-036 R.M.C.6.12 Cannabis Processing 5,000.00 CPI Reso.2018-036 R.M.C.6.12 Cannabis Testing 5,000.00 CPI Reso.2018-036 R.M.C.6.12 Cannabis Storage 5,000.00 CPI Reso.2018-036 R.M.C.6.12 Cannabis Microbusiness 5,000.00 CPI Reso.2019-060 R.M.C.6.12 AN Cannabis Businesses-Annual Renewal 2,550.00 CPI Reso.2016-036 R.M.C.6.12 Residential Cannabis Cultivation Recreational-Annual Renewal 20.00 CPI Reso.2018-036 R.M.C.6.12 Residential Cannabis Cultivation Medical-Annual Renewal Medical Marijuana State ID Card Required Reso.2018-036 R.M.C.6.12 Commercial change of promises 7,500.00 CPI Reso.2016-036 Annual License Fees AN Cannabis Businessess 27,900.00 1 CPI Reso.2018-036 R.M.C.6.12 Cannabis Microbusiness 60,000.00 CPI Reso.2019-060 R.M.C.6.12 COMMUNITY SERVICES DEPARTMENT-BUILDING MAINTENANCE DIVISION Corporation Yard Training Room 1-4 hours 34.00 CPI Reso.2019-060 4.1 or more hours per da 69.00 CPI Reso.2019-060 INFORMATION TECHNOLOGY DEPARTMENT-GIS DIVISION Maps Color Plots 8.5 x 11 6.00 Reso.2006.90 Proposition 4 11 X 17 12.00 Reso.2006.90 18 x 24 29.00 CPI Reso.2019-060 Proposition 4 24 x 36 35.00 CPI Reso.2019-060 Proposition 4 36 x 48 and Larger 43.00 CPI Reso.2019-060 Proposition 4 Maps/GIS Data in Electronic Format 74.00 Per Megabyte(MB)$70 minimum charge CPI Reso.2019-060 Proposition 4 Additional copies of Color Plots 8.5 x 11 4.00 Reso.2006-90 Proposition 4 11 X 17 6.00 Reso.2006-90 18 x 24 and Larger 22.00 CPI Reso.2019-060 Proposition 4 Page 10 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance Information Technology Department-continued Custom Mapping or GIS Analysis 86.00 Per Hour CPI Reso.2019-060 Fees for documents,data reports.specialty mapping and GIS services not specified above shall be based on cost and established by the GIS Manager PUBLIC WORKS DEPARTMENT-SOLID WASTE TRANSFER 1 RECYCLING FACILITY Fees for Loads Without Covers.Effective July 1,2004,the fee for a Reso.2008-97 load without a cover in an open trailer or open truck or pickup bed shall be twice the posted rate for a load with a cover. The customer shall pay this fee pror to disposal. Fees for Tarps in Lieu of Twice the Rate for Uncovered Loads. In The cost of the tarp shall be the Solid Waste Reso,2008-97 lieu of paying twice the rate,the customer may purchase a tarp at Utility's cost to purchase the tarp,plus a the Transfer Station in a size sufficient to cover the load. The City handling charge. shall refuse service to customers who do not pay the fee or purchase a tarp for a load without a cover at the Transfer Station or other City disposal sites after July 1,2004. PUBLIC WORKS DEPARTMENT-SOLID WASTE TRANSFER I RECYCLING FACILITY-Continued Green Waste(no concreteldirt/rocks/asphalt) Per Ton Rate 24.75 Reso.2017-054 R.M.C.9.28.110 Pickup Minimum(4-30 gal cans/bags,up to level pick up bed 11.25 Reso.2017-054 R.M.C.9.28.110 Above Pickup Bed 12.25 Reso.2017-054 R.M.C.9.28.110 Above Pickup Cab 13.25 Reso.2017-054 R.M.C,9.28.110 Bag or Waste Can-33 gallon(Maximum of 3) 3.00 Reso.2017-054 R.M.C.9.28.110 Household Waste Per Ton Rate-under 2 tons or<5 cubic yards 80.00 Reso.2017-054 R.M.C.9.28.110 2 tons or more or>5 cubic yards 82.DD Reso.2017-054 R.M.C.9.28.110 Pickup Minimum(4-30gal cans/bags,up to level pickup bed 22.00 Reso.2017-054 R.M.C.9.28.110 Above Pickup Bed 24.25 Reso.2017-054 R.M.C.9.28.110 Above Pickup Cab 27.25 Reso.2017-054 R.M.C.9.28.110 Bag or Waste Can-33 gallon maximum of 3 3.00 Reso.2017-054 R.M.C.9.28.110 Clean wood(wood without paint or other treatment)will be charged at same rate as Construction Waste self-haul green waste. MO 2011-108 R.M.C.9.28.110 Car Tire(no wheel/rim) 2.75 Reso.2015-071 R.M.C.9.28.110 Car Tire with Rim 4.75 Reso.2015-071 R.M.C.9.28.110 Truck Tire no wheel/rim 46"diameter x 12"vide 8.25 Reso.2015-071 R,M.C.9.28.110 Commercial Copier/Printer 34.50 Reso.2016-071 Appliance with motor or compressor Market price Market price each month Reso.2008-97 R.M.C.9.28.110 Other Large Appliance with motor Market price Market price each month Reso.2008-97 R.M.C.9.28.110 Small Appliance without motor Market price Market price each month Reso.2008-97 R.M.C.9.28.110 Fluid removal 6.25 Reso.2017-054 Microwave 8.00 Reso.2016-071 Couch/Large chair/Table(hard to handle items) 8.25 Reso.2015-071 R.M.C.9.28.110 Mattress/Box Spring 8.25 Reso.2015-071 R.WCA.28.110 Motor Removal 6.25 Reso.2015-071 R.M.C.9.28.110 Refrigerant removal 6.25 Reso.2015-071 R.M.C.9.28.110 Mercury Switch Processing 13.00 Reso.2015-071 R.M.C.9.28.110 Latex paint .50/poundReso.2012-74 R.M.C.9.28.110 Flammable liquids,solvents .50/pound Reso.2012-74 R.M.C.9.28.110 Oil based paint,tar,adhesives,stains,petroleum .50/pound' Reso.2012-74 R.M.C.9.28.110 Aerosols-poison,corrosive base 2.00 each Reso.2012-74 R.M.C.9.28.110 Poison solids 1.75/pound Reso.2012-74 R.M.C.9.28.110 Halogenated oil 5.00 J gallon Reso.2012-74 R.M.C.9.28.110 Antifreeze No charge' Reso.2012-74 R.M.C.9.28.110 Oil filters,used motor oil No charge' Reso.2012-74 R.M.C.9.28.110 Aerosol paint cans 1.00/each Reso.2012-74 R.M.C.9.28.110 Propane cylinders-16 oz only 2.50/each Reso.2012-74 R.M.C.9.28.110 PCB ballasts 1.25 each Reso.2012-74 R.M.C.9.28.110 Non-PCB ballasts No charge' Reso.2012-74 R.M.C.9.28.110 HID lamps 1.50/each Reso.2012-74 R.M.C.9.28.110 Alkaline batteries 1.25!pound Reso.2012-74 R.M.C.9.28.110 Fluorescent light tubes .15/foot Reso.2012-74 R.M.C.9.28.110 Compact fluorescent blubs .50 I each Reso.2012-74 R.M.C.9.28.110 Materials not listed TBD based on material type Pro"ssin /a erwork fee 25.00/visit 'No charge will continue as long as the City's vendor continues to not charge the City. Page 11 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance PUBLIC WORKS DEPARTMENT-SOLID WASTE TRANSFER I RECYCLING FACILITY-Continued Special handling Fee The Solid Waste Utility shall review the City's A special handling fee shall be charged by the Solid Waste Utility cost to dispose of scrap metals monthly and shall adjust the fees in order-to-offset thewhen market conditions result in a loss on recycling scrap metals on difference between the City's cost and what the following items:oven;stove;refrigerator,freezer;washer, Reso.2008-97 it receives from the sales of scrap metals. dishwasher;water heater,dryer;window-mount HVAC unit; Fees will be based on the fee schedule equivalently sized machines or equipment. below if the City is paying to recycle scrap metals. Large Scrap Metal Loads:Large loads of scrap metals shall be charged a special handling fee as follows: 0-200 pounds 5.50 Reso.2017-054 >200-400 pounds 8.50 Reso.2017-054 >400-600 pounds 11.75 Reso.2017-054 >600-600 pounds 14.75 Reso.2017-054 Duplicate Receipt Fee 2.00 Reso.2008-97 Compost Sales Retail.The Solid Waste Utility shall sell any compost it produces to customers for not less than the average retail price of three local, retail outlets that sell equivalent compost. Each May,the Solid The City may provide a discount of up to Waste Utility shall conduct a survey to establish price. If there is not 15%for purchases of five(5)or more cubic Reso.2009-110 a comparable compost on the market,the Utility shall set the price yards. for a reasonable cost recovery and to minimize the amount of grass it shall bury at the landfill. Wholesale 80%of retail price for retail businesses Reso.2008-97 Wood Chips Same formula as for Compost Reso.2008-97 Unscreened Mulch $1 per cubic yard less than screened Reso.2008-97 compost DeliveryCosts: If the buyer of compost,mulch or wood chips does not provide transportation,the Solid Waste Utility may truck compost,mulch or wood chips at the actual cost plus 10%to any location within the City of within five(5)miles of the Solid Waste Transfer/Recycling Facility,whichever is further.The minimum bad the City shall truck shall be five(5)tons or ten(10)cubic yards. If a driver or vehide is not available,the Utility may decline to provide this service. MO 2011-108 Residential Special Collection Program:Customers who request The Solid Waste Utility shall adjust the fees special,curbside collections of large,bulky items that do not fit in a for the Residential Special Collection wheeled waste cart shall pay a fee equal to the rate for disposal at Program for Hard-to-handle Items on an the transfer station plus additional labor and equipment costs.If the annual basis,after adoption of the City's item is not subject to a disposal fee,a handling fee equal to the budget,to reflect current costs.Maximum of Hard-to-handle fee at the transfer station shall apply. six(6)items in one(1)trip. MO 2011-108 Non-Curbside Collection Surcharge.(Wheeled Waste Carts) Rate/Month 4.00 Reso.2015-071 Replacement FeeThe City reserves the right to charge the customer for the replacement cost of a lost, stolen,damaged,or destroyed wheeled waste cart,metal container,or drop box(es). MO 2011-108 Emergency/Overtime Fee' Customers requesting emergency service requiring overtime shall pay an overtime fee that shall include the overtime rate for the employee and equipment costs.This fee is in addition to the regular fee for the"let container,drop-boxes,or compactors. MO 2011-108 All solid waste charges are subject to a 1.36%Landfill monitoring fee. PUBLIC WORKS DEPARTMENT-AIRPORTS: Delinquency Pena -Rentals 50.00 Per Occurrence Reso,2007-175 R.M.C.3.04.020 Rentals-Municipal Airport: Closed Hangar 1-20 174.00 Per Month CPI Reso,2019-060 R.M.C.3.04.020 Closed Hangar 21-29 and 31-40 189.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 30 w/Office 236.00 Per Month CPI Reso.2019-060 R.M.C.3.04.021 Closed Hangar 41-70 205.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 71-80 236.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 81-88 279.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 90-98 334.00 Per Month CPI Reso.2019.060 R.M.C.3.04.020 Port-A-Port 291.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Twin Engine 442.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Jet Pod-Hangar 89 1,184.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Aircraft Tie-Down(single) 40.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Aircraft Tie-Down(twin 8 helicopter) 75.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Aircraft Tie-down(Commercial Use) 112.00 Per Month CPI Reso.2019-060 R.M.C.3.04.021 Transient Tie-Doom Single 5.00 Per Night Reso.2006-90 R.M.C.3.04.020 Twin 6.00 Per Night Reso.2006-90 R.M.C.3.04.020 Small Business Jet 20.00 Per Night Reso.2006-90 R.M.C.3.04.020 Helicopter 6.00 Per Night Reso.2006-90 R.M.C.3.04.020 Tie-Down Parking-Violation Penalty 50.00 Reso.2007-175 R.M.C.3.04.020 Hangar Office-Single 32.00 Per Month CPI Reso,2019-060 R.M.C.3.04.020 Hangar Office-Twin 55.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Electric Outlet Fee 6.00 Per Outlet Reso.2006-90 R.M.C.3.04.020 Large Aircraft Overnight Fee greater than 2,500 sq.ft 35.00 Per Night CPI Reso.2019-060 R.M.C.3.04.020 Non-Aeronautical Use of Hangars-Premium 99.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Page 12 of 13 CITY OF REDDING SCHEDULE OF FEES AND SERVICE CHARGES Fiscal Year 2019-20 2019-20 Last Changed Type of Fee or Adopted Additional Information Inflation Resolution or Authority Service Charge Fee Indicator Ordinance PUBLIC WORKS DEPARTMENT-AIRPORTS-Continued Rentals-Benton Airport: Closed Hangar 1-20 161.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 21-30 174.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 31-40 236.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Closed Hangar 41-50 291.00 Per Month CPI Reso.2019-060 R.M.C.3.O4.020 Open Hangar 114.00 Per Month CPI Reso.2019460 R.M.C.3.04.020 Sun Shade Hangar 114.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Aircraft Tie-Down(single) 40.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Aircraft Tie-Down(twin&helicopter) 75.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Aircraft Tie-down(Commercial Use) 112.00 Per Month CPI Reso.2019-060 R.M.C.3.04.021 Transient Tie-Down Single 5.00 Per Night Reso.200690 R.M.C.3.04.020 Twin 6.00 Per Night Reso.200690 R.M.C.3.04.020 Helicopter 6.00 Per Night React.200690 R.M.C.3.04.020 Tie-Down Parking-Violation Penalty 50.00 Reso.2007-175 R.M.C.3.04.020 Hangar Office-Single 32.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Electric Outlet Fee 6.00 Per Outlet Reso.2006-90 R.M.C.3.04,020 Large Aircraft Overnight Fee greater than 2,500 sq.ft 35.00 Per Night CPI Reso.2019-060 R.M.C.3.04.020 Non-Aeronautical Use of Hangars-Premium 99.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020 Landing Fees: Aircraft providing regularly scheduled passenger or freight services (regardless of might) 1.30 Per 1,000 lbs.certified gross landing might Reso.2015-071 R.M.C.3.04.030 Landing Fees: Non-scheduled passenger or freight aircraft over 60,000 lbs gross weight 1.30 Per 1,000 lbs,certified gross landing might Reso.2017-054 R.M.C.3.04.030 Landing Fees: Aircraft operating from Redding Municipal Airport in performance of special contracts for fighting fire or otherwise with federal,state,or 38.30 For aircraft up to and including 30,000 lbs.of R.M.C.3.04.030 county governments: certified gross landing weight Reso.2015-071 51.07 For aircraft up to and including 60,000 lbs.o/ R.M.C.3.04.030 certified gross landing weight Reso.2015-071 57.44 For aircraft up to and including 80,000 lbs.of certified gross landing weight Reso.2015-071 R.M.C.3.04.030 63.84 For aircraft over 80,000 lbs.of certified gross landing weight Reso.2015-071 R.M.C.3.04.030 Helicopter Landing Fee at CDF/USFS pads only 30.00 Per Landing Reso.2007-175 R.M.C.3.04.030 Fuel Flowage Fee 0.07 Per Gallon Reso.2006-90 R.M.C.3.04.025- Enplaning .04.020En lanin Passenger Charge 4.50 Per Passenger Reso.2006-90 P.L.101-506Title IX Ground Rental Rate Benton Airport Non-Commercial 0.50 Per square foot per year Reso.2006-90 Commercial 0.40 Per square foot per year Reso.2006.90 Municipal Airport. Non-Commercial 0.50 Per square foot per year Reso.2006-90 Commercial 0.44 Per square foot per year Reso.2006-90 Small Package Delivery Vehicle User Fee 45.00 Per vehicle per month Reso.2009-110 Reso.2006-90 Hangar Waiting List Deposit 100.00 Paid Parking: 0-4 hours No Charge Reso.2015-071 Daily Parking Rate 9.00 Reso.2015-071 Daily Parking Rate for Vehicles Parked in Short-Term Parking over Four Hours 18.00 Reso.2015-071 Weekly Rate 54.00 Reso.2015-071 Late Payment Processing Fee 5.00 Title 49 Code of Fed. SIDA Background Check-Badge Fee 100.00 Per Person MO 2011-108 Regulation Part 1542 SIDA Renewal 20.00 Annual/Per Person/Per Year Reso.2009-110 CHRC Vatting-Process Fee 35.00 Biennial I Per Person Reso.2015-071 Airport Access Bade Fee 20.00 Annual/Per Person/Per Year Reso.2007-175 Lost or Damaged/SIDA or Access Bade Replacement Fee 25.00 Per Occurrence Reso.2009-110 Lon -Tarin Parkin -Special Circumstances 120.00 Annual Reso.2006-90 Air Stairs 50.00 Per Use Reso.2006-90 ADA Jet Aircraft Passenger Ramp 100.00 Per Use Reso.2006-90 ADA Commuter Aircraft Passenger Ramp 50.00 Per Use Reso.2006-90 Juty 21,2010 staff Commercial Mobile Vendor User Fee 10.00 Per Month report HOUSING AND COMMUNITY DEVELOPMENT Photocopies 0.25 Per Copy Reso.2016-071 Copies on CD 4.00 Per CD Reso.2016-071 Substitution and Reconveyance Fee(Auto-adjusted to Shasta County Fee Schedule) 39.50 Per Reconveyance Reso.2019-060 Subordination Processing Fee 100.00 Reso.2016-071 Page 13 of 13