HomeMy WebLinkAboutReso 2019-060 - Schedule of Fees & Service Charges RESOLUTION NO. 2019-060
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
REDDING AMENDING ITS SCHEDULE OF FEES AND SERVICE
CHARGES
WHEREAS:
A. On October 4, 1988, by Resolution 88-364, the City council adopted a Schedule of
Fees and Service Charges (Schedule), which has been subsequently amended
from time-to-time.
B. Pursuant to said resolution, the City Manager is authorized and directed to revise,
supplement, and maintain the Schedule so that it will be, to the greatest extent
possible, a comprehensive list of fees and City permits and services; and that a fee
that is not on the Schedule will not be invalid but should be made a part thereof at
the earliest possible time.
C. It is the desire of the City Council that all City services be self-supporting and not
subsidized as to their operational costs by revenues raised through the imposition
of ad valorem taxes or other sources of revenue.
D. On an annual basis and in accordance with City Council Policy 802, on June 18,
2019, the Director of Finance submitted to the City Council proposed increases
and changes in the Schedule and made a part hereof by this reference.
E. A public hearing on the proposed increases and changes was held on this date,
prior to the adoption of this resolution.
NOW, THEREFORE, the City Council of the City of Redding FINDS,
DETERMINES, and RESOLVES as follows:
1. With respect to the proposed changes in fees and charges and/or new fees in the
attached Schedule, the City Council finds and determines that:
a. The fees and charges previously established by resolution continue to be
reasonably related to the cost of providing the specific services for which
the fees are charged, except as modified herein. The modifications reflect
the increases or decreases in the costs of providing the specific services
related to the charges.
b. The new fees are reasonably related to or are less than the cost of
providing the specific service for which the fee is to be charged, and is �.
necessary to cover the City's costs of providing the service.
c
C. The provisions of the California Environmental Quality Act do not apply
to the new or increased fees, which are for the purpose of meeting
operating expenses of a portion thereof.
d. The proposed new fees and increases will not exceed the governmental
costs in providing said services in Fiscal Year 2019-20.
2. That the fees and charges be amended as indicated in the attached Schedule of
Fees and Service Charges, to cover the City's costs of providing the services.
I HEREBY CERTIFY that the foregoing resolution was introduced and adopted at a
regular meeting of the City Council of the City of Redding on the 18`h day of June, 2019,
by the following vote:
AYES: COUNCIL MEMBERS: Resner, Schreder,and Winter
NOES: COUNCIL MEMBERS: McElwain
ABSENT: COUNCIL MEMBERS: Dacquisto
ABSTAIN: COUNCIL MEMBERS: None
11
JULIE WINTE , Mayo
V
Attest: Form Approved:
�i", /--�) Aakz —
PAMELA MIZE, City Cle BARRY E. DeWALT, City Attorney
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information FResolution or Authority
Service Charge Fee Ordinance
FINANCE DEPARTMENT
Comprehensive Annual Financial Report(CAFR) 10.00 Per Copy Reso.2006-90
Budget Report 15.00 Per Copy Reso.2006-90
Photocopies 0.25 Per Page Reso.2006-90
General Account Receivable Late Fee 1.50% 1.5%applied to unpaid balance/month Reso. 92-426 CC Policy 0415
Late Penalty(mailed,15-day I first notice) 16.00 Reso.2009-177
Disconnect Notice Penalty mailed,7day/final notice 20.00 Reso.2009-177 Proposition 4
Late Pena mailed,15-day/first notice Commercial 3.00% Unpaid delinquent balance Reso.2009-110
CITY MANAGER
Retail Cannabis Sales RFP fee 1,000.00 CPI Reso.2018-036 R.M.C.6.12
CITY CLERK
Business License Fee
Delinquency Penalty 10% Per Month Ord.1935 R.M.C.6.02.180
Noncompliance Penalty 25% Of License Fee Ord.2149
Duplicate License 10.00 Reso.2006.90
Dog License Fee
Unaltered
1-year license 20+2 surchg. Reso.2007-175
2-year license 37+2 surchg. Reso.2007-175
3-year license 46+2 surchg. Reso.2007-175
Spayed or neutered
1-year license 10.00 Reso.2007-175
2-year license 18.50 Reso.2007-175
3-year license 23.00 Reso.2007-175
Replacement tag 3.00 Reso.2007-175
Fees to seniors(60 or Older) 50%of stated fees Reso.2006-90
Partial year(after 12131),1-year license only 50%of stated fees Reso.2006-90
Late Penalty Fee 15.00 Reso.2006-90
Dep.for redempt.of impounded dog when rabies 25.00 Ord.1960
vaccine is required
Dog Kennel License
0-10 dogs 64.00 Reso.2009-110
11 or more dogs 128.00 Reso.2009-110
Dog Kennel License Penalty Fee 21.00 Reso.2009-110
Dangerous Dog Licensing Fee 63.00 Reso.2009-110
Handbill Permit
Permit Fee 50.00 Per Quarter Reso.2006-90 R.M.C.6.36.110
Filing Fee for Notice of Intent to Circulate Petition in Municipal 200.00 Reso 2006-06
Election E.C.§9202(b)
Photocopies 0.25 Per Page Reso.2006-90 Proposition 4
Photocopies of FPPC Documents 0.10 Per Page Reso.2006.90 G.C.§81008(a)
Photocopies from Microfiche/Microfilm 0.55 Per Page Reso.2006-90 Proposition 4
Photocopies from Aperture Cards 2.00 Per Pae Reso.2006-90 Proposition 4
Photocopies on USB flash Drives 6.50 Per Flash Drive Reso.2017-054
Closing Out Sale Permit sale lasting over 60 days) 0.00 For 30-day extension Ordinance 609 R.M.C.6.34.050
Community Room/Plaza-
Includes fresh charge,tables and chairs as specified,whiteboard f
easel and podium
Private Party Rates:
Full Day:7 am to midnight• 345.00 Includes 5 tableland 25 chairs CPI Reso.2019-060
420.00 Includes 10 tables and-75 chairs CPI Reso.2019-060
484.00 Includes 15 tables and-100 chairs CPI Reso.2019-060
Hall Day:Any combination of between two and eight hours258.00 Includes 5 tables and 25 chairs CPI Reso.20194160
345.00 Includes 10 tables and 75 chairs CPI Reso.2019-060
400.00 Includes 15 tables and 100 chairs CPI Reso.2019.060
Minimum Day(up to 2 hours)' 107.00 Includes 5 tables and 25 chain CPI Reso.2019-060
199.00 Includes 10 tables and 75 chairs CPI Reso.2019-080
258.00 Includes 15 tables and-100 chairs CPI Reso.2019460
-All Private Party Rates represent non-holiday and non-weekend
dates. Private Party Rates for holidays increase by 200%of stated
rate:and for weekends increase by$100 of stated rate.
Government and Non-profit rates
Full Day:7 am to midnight 216.00 Includes 5 tables and 25 chairs CPI Reso.2019-060
312.00 Includes 10 tables and 75 chairs CPI Reso.2019-060
376.00 Includes 15 tables and 100 chairs CPI Reso.2019-060
Half Day:Any combination of between two and eight hours` 161.00 Includes 5 tables and 25 chairs CPI Reso.2019-060
258.00 Includes 10 tables and 75 chairs CPI Reso.2019-060
312.00 Includes 15 tables and 100 chairs CPI Reso.2019.060
Minimum Day(up to 2 hours) 77.00 Includes 5 tables and 25 chairs CPI Reso.20194160
174.00 Includes 10 tables and 75 chairs CPI Reso.2019-060
216.00 Includes 15 tables and AGO chairs CPI Reso.2019-060
Cleaning/Damage deposit 268.00 CPI Reso.2019-060
Equipment:
Microphone/PA,Movie Screen, Built-in Projector 10.00 Each CPI Reso.2019-060
Council Chambers(Government On 30.00 Per Hour CPI Reso.2019-060
Downtown Promenade 346.00 Security Deposit CPI Reso.2019-060
Page 1 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
CITY TREASURER
Assessment Splits(resulting from parcel splits)
Two-to four-way splits 88.00 Reso.2006-90 Proposition 4
Each additional lot over four ins lit 10.00 Reso.2006-90 Proposition 4
Release of Assessment Lien Recording Fee 13.00 Reso.2014-069 Proposition 4
Retumed Payment Charge checks.credit cards.etc. 35.00 Reso.2014-069 G.C.§6157
Parking Permits
Downtown Mall 63.00 CPI Reso.2019-060
Public Parking Lots 40.00 CPI Reso.2019-060
Construction Parking Meter Hoods 5.00 Deposit per hood Ordinance 967 R.M.C.11.28.090
Construction Parkin Meter Hoods 10.00 Plus:per quarter Ordinance 967 R.M.C.11.29.100
Utility Parking Meter Hoods 5.00 Deposit per hood Ordinance 967 R.M.C.11.28.090
Unlit Parkin Meter Hoods 10.00 Plus: er uarter er hood Ordinance 967 R.M.C.11.29.100
COMMUNITY SERVICES DEPARTMENT-RECREATION DIVISION
NOTE.For Field rentals only:
Local Non-Profit Youth Leagues are exempt from the Use Fees,but are required to pay any Materials cost. Non-Profit Youth'Travel'teams are still subject to the Use Fees.
Definitions:
Non-Profit Use:Use by any non-profit agency/group that offers a non-restrictive activity,recreational in nature. Any proceeds from this use must be
directed toward community service group activities.
Commercial Use'. An use that creates revenue to be used at the discretion of the s ors ring group.
Technology Surcharge 5.00% Applies to all program registrations. Reso.2010-164
Baseball/Softball Fields.
Light Fee 36.00 CPI Reso.2019-060 Proposition 4
Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060
Use Fee-Three Hours and More 100.00 CPI Reso.2019-060
Additional Labor 17.00 Per Hour CPI Reso.2019-060 Proposition 4
Tiger Field
Light Fee 36.00 CPI Reso.2019-060 Proposition 4
Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060
Use Fee-Three Hours and More 100.00 CPI Reso.2019-060
Additional Labor 17.00 Per Hour CPI Reso.2019-060
Materials At Cost Reso.2016-071
Soccer Fields.
Light Fee 36.00 CPI Reso.2019-060 Proposition 4
Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060
Use Fee-Three Hours and More 100.00 CPI Reso.2019-060
Additional labor 17.00 Per Hour CPI Reso.2019-060 Proposition 4
Materials At Cost Reso.2016-071
Enterprise Roller Hockey Rink/Pickle Ball Court
Use Fee-Less Than Three Hours 50.00 CPI Reso.2019-060
Use Fee-Three Hours and More 100.00 CPI Reso.2019-060
Additional Labor 17.00 CPI Reso.2019-060
Materials At Cost Reso.2016-071
Park Site and Trail Reservation Fee per session(Except Fantasy
Fountain,Junior Bike Park,Lake Redding Gazebo&Pavilion.
Sculpture Park and Civic Am hitheatre: 50.00 CPI Reso.2019-060
Fantasy Fountain
Per 2-Hour Session 300.00 CPI Reso.2019-060
Junior Bike Park
Per 2-Hour Session 300.00 CPI Reso.2019.060
Lake Redding Gazebo&Pavilion
Per Session 90.00 CPI Reso.2019-060
sculpture Park
Reservation Fee 50.00 CPI Reso.2019-060 Proposition 4
Non-Profit:Reservation Fee with Community Room Restroom 75.00 CPI Reso.2019-060 Proposition 4
Commercial: Reservation Fee with Community Room 101.00 CPI Reso.2019-060 Proposition 4
Restroom
Cleaning/Damage Deposit If Required) 345.00 CPI Reso.2019-060 Proposition 4
Civic Amphitheatre
Individuals and Local Non-Profit Reservation Fee 50.00 CPI Reso.2019-060 Proposition 4
Non-Local Non-Profit Reservation Fee 139.00 CPI Reso.2019-060 Proposition 4
Commercial(Standard)Use Fee 276.00 CPI Reso.2019-060 Proposition 4
Ckanin /Damage Deposit(If Required) 345.00 CPI Reso.2019-060 jProposrhon4
Cancellation Fee Charged on all Refunds 7.00 Reso.2014-069
Redding Aquatic Center.
Lost Card Re lacement Fee 7.00 Per Card Replaced Reso.2006-90
Page 2 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
COMMUNITY SERVICES DEPARTMENT-RECREATION DIVISION-Continued
Caldwell Recreation Center.
Rental Fee(All day use during normal park hours;$220.50 due
when making reservations with a completed Rental Application and
$220.50 due 60 days prior to the event or at the time of making the
reservation if less than 60 days prior to the event.)
435.00 CPI Reso.2019-060 Proposition 4
Cleaning/Damage Deposit(fee due 3 weeks prior to the event) 323.00 CPI Reso.2019-060 Pro osition 4
Benton Dog Park
Park Lighting(Park lights to be controlled and fees collected For Each 15 Minutes of Park Lights. Reso.2006-90
through the use of coin-operated timers.) 0.25
Class Cancellation Fee 7.00 Per Individual Per Session Reso.2007-175
Sundial Bridge:Deck Lighting Policy
Special Requests from Community 100.00 Per Request Reso.20184132
FIRE DEPARTMENT
Hazardous Material Response
Engine 37.00 Per quarter hour per engine CPI Reso.2019-060 Proposition
Per quarter hour per incident Commander
Incident 11.00 and actual cost per incident CPI Reso.20194160 Proposition 4
Fire Prevention Inspection Report 5200. Per report CPI Reso.2019-060 Proposition 4
Fire Hazard Mitigation Inspection 16.00 Reso.2007-175
Land Clearing Permit 33.00 Per permit CPI Reso.2019-060 Proposition 4
Agricultural Bum Permit 50.00 Per permit CPI Reso.2019-060 Proposition 4
Licensed Care Pre-Inspection(prior to occupancy)
Facilities 25 or less 50.00 Reso.2006-90 Proposition 4
Facilities greater than 25 100.00 Reso.2007-175 Proposition 4
Investigation Report 75.00 Per report MO 2011-108 Proposition 4
Basic Fire Report 15.00 Per report Reso.2006-90 Proposition 4
Weed Abatement Fee 74.00 Admin fee+cost of procedures CPI Reso.2019-060 Proposition 4
Weed Abatement Appeal Fee 312.00 Includes Hearing Officer I CPI Reso.2019-060 Proposition 4
False Alarm Fee 658.00 CPI Reso.2019-060 Proposition 4
Emergency Response to DUI collision 312.00 CPI Reso.2019-060
Fire Inspection Third Time and Thereafter 50.00 Reso.2006-90
Fire Inspection Fee
Fire Clearance Annual Inspection
Facilities 7-25 occupants 70.00 Flat Fee Reso.2006-90
Facilities 26.50 occupants 105.00 Flat Fee Reso.2006-90
Facilities over 50 occupants 140.00 Flat Fee Reso.2006-90
Annual Licensed Care Inspection
Facilities 7-25 occupants 70.00 Flat Fee Reso.2006-90
Facilities 26-50 occupants 105.00 Flat Fee Reso.2006-90
Facilities over 50 occupants 140.00 Flat Fee Reso.2006-90
Fire Safety Inspection
Drinking/Dining-Over 50 occupants 70.00 Per hour MO 2011-108
Hotel,Motel,Apartment House 70.00 Per hour MO 2011-108
Hazardous Occupancy-(High Risk Businesses) 70.00 Per hour MO 2011-108
Other State Required Inspections 70.00 Per hour MO 2011-108
Day Care
Commercial 70.00 Flat Fee Reso.2006-90
Residential-(Large Family Daycare) 50.00 Flat Fee Reso.2006-90
Hospitals,Surgical Centers,I-Occupancies 70.00 Per Hour Reso.2006-90
Fire Code Permits: All R.M.C.
Aircraft Refueling Vehicles 49.00 Per Pam-it CPI Reso.2019-060 9.20.010+
Aircraft Repair Hangars 49.00 Per Permit CPI Reso.2019-060 9.20.130
Automobile Wrecking Yards 104.00 Per Permit CPI Reso.2019-060
Bonfires or Rubbish Fires 31.00 Per Permit CPI Reso.2019.060
Candles and Open Flames in Public Assembly 49.00 Per Permit CPI Reso.2019-060
Combustible Fiber Storage 49.00 Per Perrot CPI Reso.2019-060
Compressed Gases and Cryogens 49.00 Per Permit CPI Reso.2019-060
Explosive and Blasting Permits:
Blasting 104.00 Per Permit CPI Reso.2019-060
Powder Sales 49.00 Per Permit CPI Reso.2019.060
Transportation 16.00 Per Permit CPI Reso.2019-060
Fireworks:
Public Display 199.00 Per Event CPI Reso.2019-060
Special Effects 107.00 Per Event CPI Reso.2019-060
Flammable Liquids:
Storage,handling,or use of Class I liquids in excess of 5 gallons
inside a building or 10 gallons not inside a building 49.00 Per Permit CPI Reso.2019-060
Storage,handling,or use of Class 11 or III-A liquids in excess of
25 gallons in a building or 60 gallons not in a building 49.00 Per Permit CPI Reso.2019-060
Install or after any flammable liquid tank or piping 49.00 Per Tank CPI Reso.2019-060
Garages 49.00 Per Permit CPI Reso.2019-060 9.20.130
Hazardous Materials 104.00 Per Permit CPI Reso.2019.060
Hazardous Production Materials 104.00 Per Permit CPI Reso.2019-060
High Piled Storage 49.00 Per Permit CPI Reso.2019-060
Junk yards 104.00 Per Permit CPI Reso.2019-060
Liquefied Petroleum Gas 49.00 Per Permit CPI Reso.2019-060
Magnesium Working 49.00 Per Permit CPI Reso.2019-060
Covered Mall,Special Uses 49.00 Per Permit CPI Reso.2019-060
Places of Assembly 49.00 Per Permit CPI Reso.2019-060
Page 3 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
FIRE DEPARTMENT-Continued
Public Assembly Pemxt Fee 49.00 Per Permit CPI Reso.2019-060
Tents&Canopies 49.00 Per Permit CPI Reso.2019-060
Air-Support Structures 49.00 Per Permit CPI Reso.2019-060
Welding or Cutting Operations 49.00 Per Permit CPI Reso.2019-060
Storage and handling of Level 2 and 3 aerosol products in excess of
500 pounds 49.00 Per Permit CPI Reso.2019-060
Carnivals and fairs or festival 48.00 Per Permit Reso.2009.110
Motor vehicle fuel dispensing stations 48.00 Per Permit Reso.2009-110
Tire Storage 48.00 Per Permit Reso.2009-110
Permit Reinspection 27.00 Per Hour(1/2 hour min charge) CPI Reso.2019-060
Permit Inspection on Sunday Double the stated fee Reso.2006-90
Other Required Fire Code Permits 45.00 Per Permit Reso.2009-110
Conference/Meeting Room
1-4 hours 34.00 CPI Reso.2019-060 Proposition 4
4.1 or more hours 67.00 CPI Raso.2019-060 Proposition 4
Photograph Copies 7.70 Per each copy CPI Reso.2019-060
POLICE DEPARTMENT
Fingerprint Rolling Fee 25.00 Reso.2017-054 P.C.§13300
Police Report copies(pickup)
C.V.C.§20012&
Paper copy 0.25 Per Page Reso.2006.90 G.C.§6257
Microfilm copy 0.55 Per page microfilm copy Reso.2006-90
Reports mailed to requester
40 pages and under 5.00 Reso.2006-90
Over 40 pages 5.00 Plus$0.25 for each page over 40 pages Reso.2006-90
Log entries 0.25 Per Pae Reso.2006-90
License to sell firearms 30.00 Reso.2009-110 PC 12071
License to sell firearms renewal 15.00 Reso.2009-110
Concealed weapons permits:
New 59.00 Plus DOJ Fees CPI Reso.2019-060 P.C.§12054
Renewal 35.00 Plus DOJ Fees CPI Reso.2019-060 P.C.§12054
Second-hand dealer permit:
R.M.C.6.30.040&
Initial Fee 65.00 Plus DOJ Fees CPI Reso.2019-060 Proposition 4
Per employee 25.00 Plus DOJ Fees CPI Reso.2019-060
Renewal 65.00 Plus DOJ Fees CPI Reso.2019-060
Cardroom license,application 828.00 CPI Reso.2019-060 R.M.C.6.14.060
Cardroom table fee,per table per year 334.00 Per table,per year CPI Reso.2019-060 R.M.C.8.14.060
Cardroom pemtit new(ownerlemployee) 42.00 Plus DOJ Fees CPI Reso,2019-060 R.M.C.8.14.100
Cardroom permit renewal 25.00 CPI Reso.2019-060 R.M.C.6.14.100
Emergency response DUI arrest&traffic collision 98.00 Per hour per officer CPI Reso.2019-060 G.C.153150.98--
Taxi inspection(yearly) 21.00 Per Taxi Reso.2006-90 Proposition 4
Taxi Driver applicant DOJ Fees+fingerprinting Reso.2006-90 Proposition 4
Tow Truck inspection(yearly) 46.00 Per Truck CPI Reso.2019-060 Proposition 4
Tow Truck re-inspection
Topside 96.00 Per Truck CPI Reso.2019-060 Proposition
Underneath 194.00 Per Truck CPI Reso.2019-060 Proposition 4
HUD Applicant Clearance 43.00 Plus DOJ Fees Reso.2014-069
Photograph Copies:
Black&White or Color 2.00 Per Photo Reso.2006-90 G.C.§6257
Digital pictures on CD includes mailing) 4.00 Per CO Reso.2006-90 G.C.§6257
Audiocassette copies includes cost of mailing) 4.00 Per tape Reso.2006-90 G.C.§6257
Videocassette copies 20.00 Plus cost of tape&reproduct. Reso.2006-90 G.C.§6257
Towed vehicle release fee 160.00 Reso.2007-175 Ordinance 2226
Repossessed vehicle fee 15.00 Reso.2006-90 G.C.§41612
Prop"return fee 16.00 Plus cost of C.O.D. Reso.2006-90 Proposition 4
Publications/Equipment Usage:
Daily bulletin 0.25 Per Page Reso,2006-90 Not required
Firearms TrainingSimulator 23.00 Per Hour(agencies on:::] Reso.2006-90 Not required
Late Payment Penalty 20.00 Reso.2009-23
ELECTRIC UTILITY DEPARTMENT-Customer Service
On-site delivery of disconnect notification(door-hanger) 50.00 Reso.2006-90 R.M.C.14.20.020
Field Collection 50.00 Reso.2006-90 Proposition 4
Voltmeter Reading 75.00 MO 2011-108 Proposition 4
Meter Tampering-Fee 500.00 Up to 8500 Reso.2006-90 Proposition 4
Priority Service Connection Fee when called after 11:00 am 50.00 Called after 11:00 am on day of connection Reso.2017-104 Proposition 4
Watt-Hour Meter Testing Fee 75.00 MO 2011-108 Proposition 4
Credit Report 5.00 Reso.2006-90 Proposition 4
Service Reconnection at Pole/Transformer 99.00 MO 2011-108
Service Disconnection at Pole/Transformer 99.00 MO 2011-108
Load Profiling/Energy Usage Monitoring ProgranJlandline or
Ethernet net cable 50.001 month
Load Profiling/Energy Usage Monitoring PrograMwireless
connection 65.001 month
Level II REU Energy Audit 125.00
ELECTRIC UTILITY DEPARTMENT
Conference/Meeting Room:
1-4 hours 35.00 CPI Reso.2019-060 Proposition 4
4.1-or more hours/da 69.00 CPI Reso.2019-060 Proosition 4
Page 4 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019.20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
ELECTRIC UTILITY DEPARTMENT
Permit Processin Fees
Temporary Power Connection and Meter Set Fee 51.00 With Permit CPI Reso.2019-060
PUBLIC WORKS DEPARTMENT-MUNICIPAL UTILITIES
Water
Water Service Installation(includes meter)
Service Size,518"to 3/4"meter1,364.00 CCI Reso.2019-060 R.M.C.14.08.310
Service Size,314"meter 1,420.00 CCI Reso.2019.060 R.M.C.14.08.310
Service Size,1"meter 1.489.00 CCI Reso.2019.060 R.M.C.14.08.310
Service Size,11/2"meter 1.961.00 CCI Reso.2019-060 R.M.C.14.08.310
Service Size,2"meter 2,095.00 CCI Reso.2019-060 R.M.C.14.08.310
Time and Material plus
Service Size,3"-12"meter 15% Reso 2017-054 R.M.C.14.08.310
Water Meter Set Installation(meter only)
Meter Size,5/8"to 3/4"meter 118.00 CCI Raw.2019-060 R.M.C.14.08.310
Meter Size,314"meter 143.00 CCI Reso.2019.060 R.M.C.14.08.310
Meter Size,1"meter 190.00 CCI Reso 2017-054 R.M.C.14.08.310
Meter Size,1112"meter 446.00 CCI Reso.2019-060 R.M.C.14.08.310
Meter Size,2"meter 526.00 CCI Reso.2019.060 R.M.C.14.08.310
Paving Cut Charge water service779.00 CCI Reso,2019-060 R.M.C.14.08.310
Water Service Split(multiple meters onparcel) 616.00 CCI Reso.2019-060 R.M.C.14.08.310
Installation of new water services by City utility crews is not available Reso.2008-97
on designated arterial streets and State highways. Installation of
new water services in these areas will be the responsibility of the
owner.
Backflow Prevention Assembly and Testing 3.20 Per month CPI Reso.2019-060 RMC 14.08.160
Commemal Fire Service Commodity Charge Four(4)times the
regular service rate RMC 14.08.320
Hydrant Meter Charge $25 Non-refundable
Charge.($225
Refundable Deposit) RMC 14.08.075
Private Fire Hydrant Service 5.20 Per Hydrant CPI Reso.2019-060 RMC 14.08.370
Private Fire Service Lines: RMC 14.08.320
Fixed Monthly service charge RMC 14.08.320
Line size 4" 4.20 CPI Reso.2019-060 RMC 14.08.320
Line size 6" 6.30 CPI Read.2019-060 RMC 14.08.320
Line size 8" 8.40 CPI Reso.2019-060 RMC 14.08.320
Line size 10" 10.00 CPI Reso.2019-060 RMC 14.08.320
Line size 12" 12.00 CPI Reso.2019-060 RMC 14.08.320
Fire Hydrant Service Outside Incorporated area of City
Demand Charge 11.00 Per Month CPI Reso.2019-060
Maintenance Cost 13.00 Per Month CPI Reso.2019-060
Billing/Collection Charge 3.70 Per Month CPI Reso.2019-060
City Council Policy
Surcharge/Monthly Service Fee times 1.5 13.00 Per Month CPI Reso.2019-060 1411
Total per month 40.70
Wastewater
Wastewater Line Tap
Tap Fee,6x4 to 8x6 219.00 CCI Reso.2019-060 R.M.C.14.16.205
Wastewater Groundwater or Surface Water Discharge Permit
Application Fee 500.00 Reso.2006-90 R.M.C.14.16.250
Wastewater Groundwater or Surface Water Discharge Permit
Renewal Fee 100.00 Reso.2006-90 R.M.C.14.16.250
1 times the rate per volume discharged as
Wastewater Groundwater or Surface Water Discharge Service
1 times the rate listed in R.M.C.14.16.240.A for consumption. Reso.2006-90 R.M.C.14.16.250
Charge
Storm Drain
Drainage Basin Inlet Marker installed -Required on all new inlets 17.00 CCI Reso.2019-060
PUBLIC WORKS DEPARTMENT-ENGINEERING DIVISION
Applied to all fees except Transportation
Technology Surcharge 5.00%Permits Reso.2007-175
Permit Processing Fees
Plan review of Public Improvement:
Permit Processing for improvements,landscape maintenance distract
formation,and final map review associated with new development Cost
(1%of the estimated cost of construction to be paid to the City at (includes overhead as Cost
the time plans are submitted for review,the balance based on actual annually approved by (includes overhead as annually approved by
cost of review to be paid prior to the beginning of construction.) Caltrans) Caltrans Reso.2013-061
Cost
(includes overhead as Cost
annually approved by (includes overhead as annually approved by
Change order Paid prior to acceptance of improvements) Caltrans) Cahrans Reso.2013-061
Public Works Inspection:
Inspection of public improvements associated with new development
to be paid by developer. At the time of permit issuance a deposit of Cost
2%of the value of the construction shall be deposited with the City. (includes overhead as Cost
The unused balance,if any,*11 be returned after final acceptance annually approved by (includes overhead as annually approved by
of the improvements. Caltrans) Caltrans) Reso.2013-061 R.M.C.17.74.05
Reinspection-If during final inspection the work has not been
approved,all subsequent inspections will be based on actual cost of
ins ection and are not subject to the 2%maximum inspection fee.
Final paric,l map review fee coven 2 plan checks 410.00 CPI Reso.2019-060R.M.C.17.16.030 8
Page 5 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
PERMIT PROCESSING FEES-Continued
Lot merger/property line adjustments for 2 parcels with maximum
of 2 plan checks 194.00 CPI Reso.2019-060
Cost Cost
(includes overhead as
annually approved by (includes overhead as annually approved by
Third and subsequent checks Caltrans) Caltrans) Reso.2013-061
Cost
Cost
(includes overhead as
annually approved by (includes overhead as annually approved by
Lot merger/property line adjustment for 3 or more lots($150 Caltrans) Caltrans)
deposit due with application-balance due pFOF to recordation Reso.2013-061
Grading Permit.
50 to 1,000 yards 462.00 CPI Reso.2019-060 R.M.C.16.4.070
1,001 to 2,000 yards 560.00 CPI Reso.2019-060 R.M.C.16.4.070
2,001 to 3,000 yards 658.00 CPI Reso.2019-060 R.M.C.16.4.070
3,001 to 4,000 yards 754.00 CPI Reso.2019-060 R.M.C.16.4.070
4.001 to 5,000 yards 862.00 CPI Reso.2019-060 R.M.C.16.4.070
5,001 to 10,000 yards 1,034.00 CPI Reso.2019-060 R.M.C.16.4.070
For each additional 5,000 yards or fraction thereof in excess of
10,000 yards 199.00 CPI Reso.2019-060 R.M.C.16.4.070
Clearing(for grading):
1 to 2 acres 104.00 CPI Reso.2019-060 R.M.C.16.4.070
2.1 to 5 acres 150.00 CPI Reso.2019-060 R.M.C.16.4.070
5.1 to 10 acres 312.00 CPI Reso.2019-060 R.M.C.16.4.070
For each additional 5 acres or fraction thereof in excess of 10
acres 46.00 CPI Reso.2019-060 R.M.C.16.4.070
Appeals for radio 81.00 CPI Reso.2019-060 R.M.C.16.4.070
Encroachment permit fees(2%due at time of submittal for plan
review,remaining 3%due when permit is issued. Exception:
Encroachment permit applications for public improvements of
$500,000 or greater may request plan check and inspection fees be
calculated based on the subdivision related improvement provisions $78.00 or 5%of Engineer's Estimate,
of this schedule.) 83.00 whichever is greater CPI Reso.2019-060 Proposition 4
Transportation Permit:
Single occurrence 16.00 Reso.2006-175 V.C.35795(b)
Annual or repetitive occurrence 90.00 Reso.2006-175 V.C.35795(b)
DEVELOPMENT SERVICES DEPARTMENT-ALL DIVISIONS
Technology Surcharge 5.00%1 Applies to all fees Reso.2007-175
DEVELOPMENT SERVICES DEPARTMENT-BUILDING DIVISION
Building Permit Microfilming f Imaging Charge 1.50 CPI Reso.2019-060 Froposition 4
Imposed at full cost of procedure Reso.88-364
Abatements-Imposed when no response to attorney demand letter Proposition 4
Permit Processing Fees
Building Permit Fees Total Valuation
$ 1 to$ 500 24.60 CPI Reso.2019-060
Plus 3.32 for each additional 100 over first
501 to 2,000 24.60 500 CPI Reso.2019-060
Plus 14.70 for each add'I 1000 over first
2,001 to 25,000 74.40 2,000 CPI Reso.2019-060
Plus 10.70 for each add'I 1000 over first
25,001 to 50.000 412.50 25,000 CPI Reso.2019-060
Plus 7.35 for each add]1000 over first
50,001 to 100,000 679.90 50,000 CPI Reso.2019-060
Plus 5.69 for each add'I 1000 over first
100,001 to 500,000 1,047.20 100,000 CPI Reso.2019-060
Plus 4.87 for each add'I 1000 over first
500,001 to 1,000,000 3,323.90 500,000 CPI Reso.2019-060
Plus 3.32 for each add'I 1000 over first
1,000,001 and up 5,758.80 1,000,000 CPI Reso.2019-060
Temporary Certificate of Occupancy
Large Commercial 550.00 First 60 daysCPI Reso.2019-060
550.00 Each additional 30 days CPI Reso.2019-060
Small Commercial 279.00 First 60 days CPI Reso.2019-060
279.00 Each additional 30 days CPI Reso.2019-060
Residential 53.00 CPI Reso.2019-060
Model Home Permit
Residential 334.00 CPI Reso.2019-060
Building Permit Prior to Subdivision Acceptance
Residential 279.00 CPI Reso.2019-060
Authorization to Start Work
Commercial 167.00 CPI Reso.2019-060
Water Efficient Landscape Documentation
2,500 square feet to 40,000 square feet of Landscaping 364.00 CPI Reso.2019-060 Ordinance 2449
Over 40,000 square feet of Landscaping 511.00 CPI Reso.2019-060 Ordinance 2449
Note:Plan check fees are 65%of building permit fees. Fees for
repetitive plan checks(where the same plans are used in more than
one location)may be adjusted at the discretion of the Director of Typically 50%of cost of original plan check
Development Services or his designee, fee
Plan Check-Outside normal business hours 116.00' Per Hour 2 hour minimum CPI Reso.2019-060
Electric Permit Fees
Permit Issuance-each permit 45.00 ' Per each permit CPI Reso.2019-060
Each supplemental permit 7.40 Per each supplemental permit CPI Reso.2019-060
System Fee Schedule
New Residential Building
Page 6 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
ELECTRIC PERMIT FEES-Continued
Multi Family 0.054 Per square foot CPI Reso.2019-060
Single-two family 0.063 Persquare foot CPI Reso.2019-060
New Non-residential Buildings
3,000 square fee 0.074 Per square foot CPI Reso.2019-060
3,001 to 10,000 square feet 0.063 Per square foot CPI Reso.2019-060
Over 10,000 square feet 0.047 Per square foot CPI Reso.2019-060
Private Swimming Pools 47.00 Per swimming pool CPI Reso.2019-060
Electric Service
1 -200 amps 30.00 CPI Reso.2019-060
201-1000 amps 60.00 CPI Reso.2019-060
over 1000 ams 124.00 CPI Reso.2019-060
Unit Fee Schedule
Receptacle,Switch and Lighting Outlets
First 20 1.20 Each CPI Reso.2019-060
Additional Outlets 0.80 Each CPI Reso.2019-060
Lighting Fixtures
First 20 1.20 Each CPI Reso.2019-060
Additional Fixtures 0.80 Each CPI Reso.2019-060
Pole or Platform Lighting Fixtures 1.20 Each CPI Reso.2019-060
Temporary Power Pole Inspection 27.00 CPI Reso.2019-060
Theatrical Type Lighting Fixtures 1.20 Each CPI Reso.2019-060
Residential Appliances 4.70 Each CPI Reso.2019-060
Nonresidential Appliances 4.70 Each CPI Reso.2019-060
Photo Voltaic Systems-Residential
7 to 15 Kw 450.00 Reso.2015-071 AB 1414
16 Kw and up Plus 15.00 per Kw or fraction there of above
450.00 15 Kw Reso.2015-071 AB 1414
Photo Voltaic Systems-Commercial
1 to 50 Kw 1,000.00 Reso.2015-071 SB 1222
51 to 250 Kw Plus 7.00 per Kw or fraction there of
1,000.00 between 51 Kw and 250 Kw Reso.2015-071 SB 1222
251 Kw and up Plus 5.00 per Kw for each Kw or fraction
2,400.00 there of above 250 Kw Reso.2015-071 SB 1222
Power Apparatus per HP,KW,KAVA or KVAR
Up to and including 1 4.70 Each CPI Reso.2019-060
Over 1 and not over 10 12.90 Each CPI Reso.2019-060
Over 10 and not over 50 25.80 Each CPI Reso.2019-060
Over 50 and not over 100 48.40 Each CPI Reso.2019-060
Over 100 74.30 Each CPI Reso.2019-060
Busways-Trolley and plug-in type 7.50 Each CPI Reso.2019-060
Signs,Outline Lighting.and Marquees
Supplied from one branch circuit 75.00 Each CPI Reso.2019-060
Additional Branch Circuits per Sign Services 8.00 Each CPI Reso.2019-060
600 Volts or Less and not over 200 amperes 80.00 Each CPI Reso.2019-060
600 volts or less 8 over 200 amperes to 1,000 amps. 90.00 Each CPI Reso.2019-060
Over 600 volts or over 1000 amperes 150.00 Each CPI Reso.2019-060
Misc.Apparatus,Circuits,Conduits,and Conductors for which a
permit is required but no other fee is set 25.00 ' CPI Reso.2019-060
Energy Service Change(Residential) 125.00 CPI Reso.2019-060
Energy Service Chane Commercial 175.00 ' CPI Reso.2019-060
Energy Permit Fee 45.00 ' CPI Reso.2019-060
Fire Permit Fees
Fire 8 Life Safety Plan Check and Inspection
Commercial and Multi-Family Sprinkler Plan Check Fee
Total Value
$ 1.00 to $ 500.00 3.00 CPI Reso.2019-060 Proposition 4
Plus$0.38 for each add'I$100 over the first
$ 501.00 to$ 2,000.00 3.00 $500 CPI Reso.2019-060 Proposition 4
Plus$1.79 for each add'I$1000 over the first
$ 2,001.00 to$ 25,000.00 8.70 $2,000 CPI Reso.2019-060 Proposition 4
Plus$1.24 for each add'I$1,000 over the
$ 25,001.00 to$ 50,000.00 49.80 first$25,000 CPI Reso.2019-060 Proposition 4
Plus$0.87 for each add1$1,000 over the
$ 50,001.00 to$100,000.00 80.90first$50,000 CPI Reso.2019.060 Proposition 4
Plus$0.66 for each add'I$1,000 over the
$ 100.001.00 to$ 500,000.00 124.60 first$100,000 CPI Reso.2019-060 Proposition 4
Plus$0.55 for each add'I$1,000 over the
$ 500,001.00 to$1,000.000.00 387.60 first$500,000 CPI Reso.2019-060 Proposition 4
Plus$0.43 for each add]$1,000 over the
$1,000,001.00 and up 665.00 first$1,000,000 CPI Reso.2019-060 Proposition 4
Miscellaneous Plan Check 72.00 Cost+71%Overhead Reso.2013-078 Proposition 4
Buckeye Single Family Resident Site Review 50.00 ' Reso.2006-90
8ucke a Sin le Famil Resident Site Visit 50.00 ' Reso.2006-90
R-3 Fire Sprinkler Plan Check 100.00 ' CPI Reso.2019-060
Commercial Sprinkler System Inspection and Test
Per Sprinkler Riser or Floor plus 100.00 ' Per sprinkler nser CPI Reso.2019-060
Per
Sp
nnkler Head 2.10 ' Per S nnkler Head CPI Reso.2019-060
R-3 Fire S nnkler Feld Ins ection and Test 2.10 ' Per Sprinkler Head CPI Reso.2019-060
Fire S rinkler Re-Ins ection 3rd time 8 thereafter 50.00 Reso.2006-90
R-1,2,4 Fire Sprinkler Field Inspection and Test
Per Sprinkler Riser or Floor plus 100.00 ' Per sprinkler nser CPI Reso.2019-060
Per S rinkler Head 2.10 ' Per S rinkler Head CPI Reso.2019.060
Hood and Duct Fire Suppression System Plan Review 8 Inspection
125.00 ' CPI Reso.2019-060
Review 8 Inspection of Fire Service Line 66.00 CPI Reso.2019-060
Review 8 Ins ection of Fire Pum 66.00 CPI Reso.2019-060
Review 8 Ins ection of Stand i e Systems 66.00 CPI Reso.2019-060
-7
Fire Alarm Plan Check Fee 107.00 CPI Reso.2019-060
Fire Alarm Field Inspection and Test plus 67.00 CPI Reso.2019-060
Plusper
devise 1.20 Per device CPI Reso.2019-060
Page 7 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
Mechanical Permit Fees
Permh Issuance 45.00 ' Each CPI Reso.2019-060
Su Iemental Permit Issuance 7.50 Each CPI Reso.2019-060
Unit Fee Schedule
Installation of force air or gravity type furnace or burner
Up to and including 100,000 Btu/h 15.00 Per Each CPI Reso.2019-060
Over 100,000 Btu/h 28.00 Per Each CPI Reso.2019-060
Installation or relocation of floor furnace 15.00 Per Each CPI Reso.2019-060
Installation or relocation of suspended heater,recessed wall
heater or floor mounted heater 15.00 Per Each CPI Reso.2019-060
Installation,relocation or replacement of appliance vent 7.50 Per Each CPI Reso.2019-060
Repair or alteration of,or addition of each heating appliance,
refrigeration unit,cooling unit,absorption unit or each heating,
cooling,absorption or evaporative cooling system including 15.00 Per Each CPI Reso.2019-060
Installation or relocation of boiler or compressor
Replacement of each heating appliance.refrigeration
unit,cooling unit,absorbtion unit or each heating,cooling,
absorbtion or evaporative cooling system including
installation of controls(Residential) 125.00 ' Per Each CPI Reso.2019-060
Replacement of each heating appliance,refrigeration
unit,cooling unit,absorbtion unit or each heating,cooling,
absorbtion or evaporative cooling system including
installation of controls(Commercial) 150.00' Per Each CPI Reso.2019-060
Up to 3 horsepower or 100,000 Stu/h 15.00 Per Each CPI Reso.2019-060
Up to 15 horsepower or 500,000 Btu/h 28.00 Per Each CPI Reso.2019-060
Up to 30 horsepower or 1,000,000 Btu/h 36.00 Per Each CPI Reso.2019-060
Up to 50 horsepower or 1,750,000 Bluth 53.00 Per Each CPI Reso.2019-060
Over 50 horsepower or 1,750,000 Btu/h 91.00 Per Each CPI Reso.2019-060
Air-handling unit
Up to 10,000 cubic feet per minute 10.00 Per Each CPI Reso.2019-060
Over 10,000 cubic feet per minute 18.00 Per Each CPI Reso.2019-060
Evaporative Cooler,not portable 15.00 Per Each CPI Reso.2019-060
Ventilation fan connected to single duct 7.50 Per Each CPI Reso.2019-060
Ventilation system not part of heating or a/c system 10.00 Per Each CPI Reso.2019-060
Installation of each hood served by mechanical exhaust 10.00 Per Each CPI Reso.2019-060
Installation or relocation of domestic incinerator 18.00 Per Each CPI Reso.2019-060
Installation or relocation of conmercial or industrial type Per Each
incinerator 75.00 CPI Reso.2019-060
Solar Collector 6.20 Per Collector CPI Reso.2019-060
Solar Storage Tank 6.20 Per Tank CPI Reso.2019-060
Plumbing Permit Fees
Permit Issuance 45.00' Per Each CPI Reso.2019-060
Supplemental Issuance 7.50 Per Each CPI Reso.2019-060
Unit Fee Schedule
Plumbing Fixture or Trap 9.80 Per Each CPI Reso.2019-060
Building Sewer or Trailer Park Sewer 26.00 Per Each CPI Reso.2019-060
Rainwater System 9.80 Per Each CPI Reso.2019-060
Cesspool 36.00 Per Each CPI Reso.2019-060
Private Sewage Disposal System 75.00 Per Each CPI Reso.2019-060
Swimming Pool 75.00 Per Each CPI Reso.2019-060
Water heater and/or vent 12.00 Per Each CPI Reso.2019-060
Industrial-waste pretreatment interceptor 20.00 Per Each CPI Reso.2019-060
Installation,alteration,or repair of water piping and or water-
treating equipment 4.70 Per Each CPI Reso.2019-060
Repair or alteration of drainage or vent piping 4.70 Per Each CPI Reso.2019-060
Lawn Sprinkler System on any one Meter 14.00 Per Each CPI Reso.2019-060
Atmospheric Type Vacuum Breakers Reso.2019-060
1 to 5 12.00 Per Each CPI Reso.2019-060
Overs 3.90 Per Each CPI Reso.2019-060
Back-flow Protection Device
2 inches or smaller 12.00 Per Each CPI Reso.2019-060
Over 2 inches 26.00 Per Each CPI Reso.2019460
Gas Piping System
1 to four 4.70 Per Each CPI Reso.2019-060
5 or more 1.20 Per Each CPI Reso.2019-060
Water Heater replacement(Residential) 100.00' Per Each CPI Reso.2019-060
Water Heater replacement(Commercial) 150.00' Per Each CPI Reso.2019-060
Other Inspections and Fees(AN Permit Types)
Inspection Outside Normal Business Hours 119.00 Per Hour(2 hour minimum) CPI Reso.2019-060
Reinspection Fees Assessed Under Provisions of Section 108.8 77.00 Per Hour CPI Reso.2019-060
Inspection where no separate fee is indicated 77.00 Per Hour CPI Reso.2019-060
Additional Administrative Review/Plan Review 86.00 Per Hour CPI Reso.2019-060
Appliances Regulated by Code not in other category 10.00 CPI Reso.2019-060
Demolition Permit 150.00' CPI Reso.2019-060
Manufactured Home Fee 355.00 CPI Reso.2019-060
Appeals
Board of Appeals 150.00' CPI Reso.2019-060
Effective Date of Fee is September 1,2019
All Building Division fees assessed on permits for the repair or replacement of structures located on properties affected by the CARR Fire shall be reduced by 20%
DEVELOPMENT SERVICES DEPARTMENT-PLANNING DIVISION
Pre-a lication review fee
10.00%1 10%of total application fee Reso.2006-90
Publication and Documents:
Statistical Reports 6 to 11 Based on size of document Reso.2006-90
General Plan,Elements,etc. 6 t0 17 Based on size of document Reso.2006-90
Area/Specific Plans 6 to 28 Based on size of document Reso.2006-90
Large Scale Copies 6 to 28 See GIS Section Reso.2006-90
Page 8 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
DEVELOPMENT SERVICES DEPARTMENT-PLANNING DIVISION-Continued
Cost for copies of documents and maps not specified above shall be
established by the Development Services Director
Speck Plan Preparation Cost Recovery and Update Fee Fee=A((M(1+bn)]+[U(1+b5)]}Where: Reso.2009-110
A=Number of gross acres in the project
area;M=The City's average cost per gross
acre of preparing the Specific Plan and the
MEIR and completing any City-initiated
annexation of the property. The final
amount will be set at the time of final
recordation of the City-initiated annexation.
Where a privately initiated annexation
Precedes a City-sponsored annexation(if
any),the fee will be determined based on
the average cost per acre,as describe
above,without the annexation costs;b=
The projected annual inflation rate. The
average annual inflation rate used for this
calculation will be based on the average
inflation rate for the previous 5 years as
measured by the consumer price index. The
rate will be revised each year at the time of
the required annual report on the Specific
Plan:n=Number of years since the year of
Specific Plan adoption;U=Contribution
towards cost of necessary updates to the
Specific Plan and accompanying Master
Environmental Impact Report.
Permit Processing Fees
Parcel Maps/Property Line Adjustment:
Administrative Parcel Map-exempt from CA Environmental All G.C.§66451.2 8
Quality Act(CEQA) 3,673.00 ' CPI Reso.2019-060 §66451.33
Major 2-to 4-Parcel Split-NOT exempt from CEQA 7,000.00 ' CPI Reso.2019-060
Property Line Adjustment 772.00' CPI Reso.2019-060
Parcel Map Amendment or Extension 3,000.00' CPI Reso.2019-060
Administrative Parcel Map Amendment or Extension 2 000.00' CPI Reso.2019-060
Subdivisions:
Subdivision and Condominium Conversions: Deposit Actual Cost
5 to 25 lots 10,701.00 Cost+-100%Overhead CPI Reso.2019-060 All G.C.§66451.2 8
26 to 50 lots 13,544.00 Cost+100%Overhead CPI Reso.2019-060
51 to 100 lots 18,410.00 Cost+100%Overhead CPI Reso.2019-060
101 or more lots 20,177.00 Cost+100%Overhead CPI Reso.2019-060
Extension 2,422.00 Cost+100%Overhead CPI Reso.2019-060
Amendment 4,759.00 Cost+100%Overhead CPI Reso.2019-060
Reversion to Acreage 626.00 Cost+100%Overhead CPI Reso,2019-060
Deposit Actual Cost
Cost+100%Overhead(does not include
Annexation 3,983.00 LAFCO&State Fees) CPI Reso.2019-060
Abandonment:
Summary Vacation 286.00 ' CPI Reso.2019-060 Proposition 4
Right of Way 4,500.00' CPI Reso.2019-060 Proposition 4
Easement 500.00' CPI Reso.2019-060 Proposition 4
Use Permits/Site Development Permits&Planned Development Plans
Residential Project:
First 4 units 4,000.00' CPI Reso.2019-060 G.C.§65104
5 to 49 units 10,000.00' CPI Reso.2019-060 G.C.§65104
50 or more units 15,000.00' CPI Reso.2019-060 G.C.§65104
Mobile Home Park 10,000.00' CPI Reso.2019-060 G.C.§65104
Miscellaneous 1,464.00 Plus$500 per additional location CPI Reso.2019-060 G.C.§65104
Commercial/Industrial New Construction
1 acre or less 6,000.00' CPI Reso.2019-060 G.C.§65104
1.1 to 5 acres 10,000.00' CPI Reso.2019-060 G.C.§65104
5.1 to 10 acres 13,000.00' CPI Reso.2019-060 G.C.§65104
Over 10 acres 16,000.00' CPI Reso.2019.060 G.C.§65104
Amendment 2,000.00' CPI Reso.2019-060 G.C.§65104
Extension 1,000.00' CPI Reso.2019-060 G.C.§65104
Site Development Permit-Director 3,000.00' CPI Reso.2019-060 G.C.§65104
Site Development Permit-Director Amendment 2,000.00' CPI Reso.2019-060 G.C.§65104
Temporary Use Permit 897.00' Plus$250 per additional location CPI Reso.2019-060 G.C.§65104
Final Plan Review 2,000.00' CPI Reso.2019-060 G.C.§65104
Short Term Rental-Vacation Rental 1,000.00' CPI Reso.2019-060
Tree Permit 50.00' Per Tree CPI Reso.2019-060 G.C.665104
Administrative Sign Permits:
Temporary Promotional Advertising 383.00 ' CPI Reso.2019-060 G.C.§65104
Permanent Advertising Sin 713.00 ' CPI Reso.2019-060 G.C.§65104
General Plan Amendments I Specific Plans: All G.C.§65104 and
§65456(b)
1 acre or less 10,000.00 ' CPI Reso.2019-060
1.1 to 10 aces 12,000.00 ' CPI Reso.2019.060
10.1 to 100 acres 15,000.00 ' CPI Reso.2019.060
Over 100 acres 20,000.00 ' CPI Reso,2019-060
Deposit Actual
General Plan Amendment ext 3,305.00 Cost+100%Overhead CPI Reso.2019-060 G.C.§65104
Rezoning:
Planned Development Overlay District only 3,500.00 ' CPI Reso.2019-060 G.C.§65104
1 acre or less 5,500.00 ' CPI Reso.2019-060 G.C.§65104
1.1 to 10 acres 8,500.00 ' CPI Reso.2019-060 G.C.565104
Page 9 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
Permit Processing Fees-Continued
10.1 to 100 acres 15,000.00' CPI Reso.2019-060 G.C.§65104
Over 100 acres 20,000.00' CPI Reso.2019-060 G.C. 65104
Variance:
Zoning Exception 1,000.00 ' CPI Reso.2019460 G.C.§65104
Zoning Exception Amendment 1,200.00' CPI Reso.2019-060 G.C.§65104
Major Variance 6,349.00' CPI Reso.2019-060 G.C.§65104
Variance Amendment 4,048.00' CPI Reso.2019-060 G.C. 65104
Recreational Vehicle Parking Exception 500.00' CPI Reso.2019-060
Recreational Vehicle Parking Exception Renewal 250.00' CPI Reso.2019-060
Development Agreement Application 6,514.00 CPI Reso.2019-060 G.C.§65865(d)
Deposit Actual
Ordinance Amendment ext 3,305.00 Cost+100%Overhead CPI Reso.2019-060 G.C. 65104
Surface Mining/Reclamation Plans 5,351.00 CPI Reso.2019-060 R.M.C.18.63.050
Annual Surface Mining Inspection Administrative Fee 883.00 CPI Reso.2019-060 R.M.C.18.63.050
AN Pub.Resources
Environmental Impact Report Processing: Deposit Actual Code§21089(a)
0.1 to 5 acres 4,759.00 Cost+100%Overhead CPI Reso.2019-060
5.1 to 10 acres 5,771.00 Cost+100%Overhead CPI Reso.2019-060
10.1 to 20 acres 7,396.00 Cost+100%Overhead CPI Reso.2019-060
20.1 to 40 acres 12,241.00 Cost+100%Overhead CPI Reso,2019-060
40.1 to 100 acres 18 246.00 Cost+100%Overhead CPI Reso.2019-060
Foreach 25 acres or fraction thereof in excess of 100 acres 1,927.00 Cost+100%Overhead CPI Reso,2019-060
Environmental Assessment and Negative Declarations/De Minimis 20%of total application fee Reso.2006-90 Pub.Resources
Code§21089(a)
Deposit Actual
CEQA Mitigation Monitoring-Deposit 550.00 Cost+100%Overhead CPI Reso.2019-060
Deposit Actual
Pre-application Review Fee/Traffic or Special Study Review 20%of total application Cost+100%Overhead Reso.2006-90
fee
Appeals:
Applicant 1,000.00 ' CPI Reso.2019-060 G.C.§65104
Administrative Permit(appeal by applicant)to Bar 1,000.00 CPI Reso.2019-060 G.C. 65104
Land Use History/Toxic Hazard Review/qualified Historic Property
Designation 345.00 Plus Time and Materials CPI Reso.2019-060 Proposition 4
Street Renaming Request
0-1000 feet of street 1,257.00' CPI Reso.2019-060 Proposition 4
Over 1000 feet of street 1,482.00 CPI Reso.2019-060 Proposition 4
Floodplain Determination/Zoning Confirm Lefter/ABC Public
Necessity Determin. 170.00' CPI Reso.2019.060
Elevation Certificate 156.00 CPI Reso.2019-060
Certificate of Compliance Letter 1,500.00- CPI Reso.2019-060
LOMA I LOMR Processing
Letter of Map Amendment(LOMA) 327.00' CPI Read.2019-060
Letter of Map Revision LOMR 563.00 Cost+100%Overhead CPI Reso.2019-060
Effective date of fee is September 1,2019
Application Fees
Residential Cannabis Cultivation Recreational 100.00 CPI Reso.2018-036 R.M.C.6.12
Residential Cannabis Cultivation Medical Medical Marijuana State ID Card Required Reso.2018-036 R.M.C.6.12
Cannabis Retail 5,000.00 CPI Reso.2018-036 R.M.C.6.12
Commerical Cannabis Cultivation 5,000.00 CPI Reso.2018-036 R.M.C.6.12
Cannabis Manufacturing 5,000.00 CPI Reso.2018-036 R.M.C.6.12
Cannabis Distribution 5,000.00 CPI Reso.2016-036 R.M.C.6.12
Cannabis Processing 5,000.00 CPI Reso.2018-036 R.M.C.6.12
Cannabis Testing 5,000.00 CPI Reso.2018-036 R.M.C.6.12
Cannabis Storage 5,000.00 CPI Reso.2018-036 R.M.C.6.12
Cannabis Microbusiness 5,000.00 CPI Reso.2019-060 R.M.C.6.12
AN Cannabis Businesses-Annual Renewal 2,550.00 CPI Reso.2016-036 R.M.C.6.12
Residential Cannabis Cultivation Recreational-Annual Renewal 20.00 CPI Reso.2018-036 R.M.C.6.12
Residential Cannabis Cultivation Medical-Annual Renewal Medical Marijuana State ID Card Required Reso.2018-036 R.M.C.6.12
Commercial change of promises 7,500.00 CPI Reso.2016-036
Annual License Fees
AN Cannabis Businessess 27,900.00 1 CPI Reso.2018-036 R.M.C.6.12
Cannabis Microbusiness 60,000.00 CPI Reso.2019-060 R.M.C.6.12
COMMUNITY SERVICES DEPARTMENT-BUILDING MAINTENANCE DIVISION
Corporation Yard Training Room
1-4 hours 34.00 CPI Reso.2019-060
4.1 or more hours per da 69.00 CPI Reso.2019-060
INFORMATION TECHNOLOGY DEPARTMENT-GIS DIVISION
Maps
Color Plots
8.5 x 11 6.00 Reso.2006.90 Proposition 4
11 X 17 12.00 Reso.2006.90
18 x 24 29.00 CPI Reso.2019-060 Proposition 4
24 x 36 35.00 CPI Reso.2019-060 Proposition 4
36 x 48 and Larger 43.00 CPI Reso.2019-060 Proposition 4
Maps/GIS Data in Electronic Format 74.00 Per Megabyte(MB)$70 minimum charge CPI Reso.2019-060 Proposition 4
Additional copies of Color Plots
8.5 x 11 4.00 Reso.2006-90 Proposition 4
11 X 17 6.00 Reso.2006-90
18 x 24 and Larger 22.00 CPI Reso.2019-060 Proposition 4
Page 10 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
Information Technology Department-continued
Custom Mapping or GIS Analysis 86.00 Per Hour CPI Reso.2019-060
Fees for documents,data reports.specialty mapping and GIS services not specified above shall be based on cost and established by the GIS Manager
PUBLIC WORKS DEPARTMENT-SOLID WASTE TRANSFER 1 RECYCLING FACILITY
Fees for Loads Without Covers.Effective July 1,2004,the fee for a Reso.2008-97
load without a cover in an open trailer or open truck or pickup bed
shall be twice the posted rate for a load with a cover. The customer
shall pay this fee pror to disposal.
Fees for Tarps in Lieu of Twice the Rate for Uncovered Loads. In The cost of the tarp shall be the Solid Waste Reso,2008-97
lieu of paying twice the rate,the customer may purchase a tarp at Utility's cost to purchase the tarp,plus a
the Transfer Station in a size sufficient to cover the load. The City handling charge.
shall refuse service to customers who do not pay the fee or
purchase a tarp for a load without a cover at the Transfer Station or
other City disposal sites after July 1,2004.
PUBLIC WORKS DEPARTMENT-SOLID WASTE TRANSFER I RECYCLING FACILITY-Continued
Green Waste(no concreteldirt/rocks/asphalt)
Per Ton Rate 24.75 Reso.2017-054 R.M.C.9.28.110
Pickup
Minimum(4-30 gal cans/bags,up to level pick up bed 11.25 Reso.2017-054 R.M.C.9.28.110
Above Pickup Bed 12.25 Reso.2017-054 R.M.C.9.28.110
Above Pickup Cab 13.25 Reso.2017-054 R.M.C,9.28.110
Bag or Waste Can-33 gallon(Maximum of 3) 3.00 Reso.2017-054 R.M.C.9.28.110
Household Waste
Per Ton Rate-under 2 tons or<5 cubic yards 80.00 Reso.2017-054 R.M.C.9.28.110
2 tons or more or>5 cubic yards 82.DD Reso.2017-054 R.M.C.9.28.110
Pickup
Minimum(4-30gal cans/bags,up to level pickup bed 22.00 Reso.2017-054 R.M.C.9.28.110
Above Pickup Bed 24.25 Reso.2017-054 R.M.C.9.28.110
Above Pickup Cab 27.25 Reso.2017-054 R.M.C.9.28.110
Bag or Waste Can-33 gallon maximum of 3 3.00 Reso.2017-054 R.M.C.9.28.110
Clean wood(wood without paint or other
treatment)will be charged at same rate as
Construction Waste self-haul green waste. MO 2011-108 R.M.C.9.28.110
Car Tire(no wheel/rim) 2.75 Reso.2015-071 R.M.C.9.28.110
Car Tire with Rim 4.75 Reso.2015-071 R.M.C.9.28.110
Truck Tire no wheel/rim 46"diameter x 12"vide 8.25 Reso.2015-071 R,M.C.9.28.110
Commercial Copier/Printer 34.50 Reso.2016-071
Appliance with motor or compressor Market price Market price each month Reso.2008-97 R.M.C.9.28.110
Other Large Appliance with motor Market price Market price each month Reso.2008-97 R.M.C.9.28.110
Small Appliance without motor Market price Market price each month Reso.2008-97 R.M.C.9.28.110
Fluid removal 6.25 Reso.2017-054
Microwave 8.00 Reso.2016-071
Couch/Large chair/Table(hard to handle items) 8.25 Reso.2015-071 R.M.C.9.28.110
Mattress/Box Spring 8.25 Reso.2015-071 R.WCA.28.110
Motor Removal 6.25 Reso.2015-071 R.M.C.9.28.110
Refrigerant removal 6.25 Reso.2015-071 R.M.C.9.28.110
Mercury Switch Processing 13.00 Reso.2015-071 R.M.C.9.28.110
Latex paint .50/poundReso.2012-74 R.M.C.9.28.110
Flammable liquids,solvents .50/pound Reso.2012-74 R.M.C.9.28.110
Oil based paint,tar,adhesives,stains,petroleum .50/pound' Reso.2012-74 R.M.C.9.28.110
Aerosols-poison,corrosive base 2.00 each Reso.2012-74 R.M.C.9.28.110
Poison solids 1.75/pound Reso.2012-74 R.M.C.9.28.110
Halogenated oil 5.00 J gallon Reso.2012-74 R.M.C.9.28.110
Antifreeze No charge' Reso.2012-74 R.M.C.9.28.110
Oil filters,used motor oil No charge' Reso.2012-74 R.M.C.9.28.110
Aerosol paint cans 1.00/each Reso.2012-74 R.M.C.9.28.110
Propane cylinders-16 oz only 2.50/each Reso.2012-74 R.M.C.9.28.110
PCB ballasts 1.25 each Reso.2012-74 R.M.C.9.28.110
Non-PCB ballasts No charge' Reso.2012-74 R.M.C.9.28.110
HID lamps 1.50/each Reso.2012-74 R.M.C.9.28.110
Alkaline batteries 1.25!pound Reso.2012-74 R.M.C.9.28.110
Fluorescent light tubes .15/foot Reso.2012-74 R.M.C.9.28.110
Compact fluorescent blubs .50 I each Reso.2012-74 R.M.C.9.28.110
Materials not listed TBD based on material
type
Pro"ssin /a erwork fee 25.00/visit
'No charge will continue as long as the City's vendor continues
to not charge the City.
Page 11 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
PUBLIC WORKS DEPARTMENT-SOLID WASTE TRANSFER I RECYCLING FACILITY-Continued
Special handling Fee
The Solid Waste Utility shall review the City's
A special handling fee shall be charged by the Solid Waste Utility cost to dispose of scrap metals monthly and
shall adjust the fees in order-to-offset thewhen market conditions result in a loss on recycling scrap metals on
difference between the City's cost and what
the following items:oven;stove;refrigerator,freezer;washer, Reso.2008-97
it receives from the sales of scrap metals.
dishwasher;water heater,dryer;window-mount HVAC unit;
Fees will be based on the fee schedule
equivalently sized machines or equipment.
below if the City is paying to recycle scrap
metals.
Large Scrap Metal Loads:Large loads of scrap metals shall be
charged a special handling fee as follows:
0-200 pounds 5.50 Reso.2017-054
>200-400 pounds 8.50 Reso.2017-054
>400-600 pounds 11.75 Reso.2017-054
>600-600 pounds 14.75 Reso.2017-054
Duplicate Receipt Fee 2.00 Reso.2008-97
Compost Sales
Retail.The Solid Waste Utility shall sell any compost it produces
to customers for not less than the average retail price of three local,
retail outlets that sell equivalent compost. Each May,the Solid The City may provide a discount of up to
Waste Utility shall conduct a survey to establish price. If there is not 15%for purchases of five(5)or more cubic Reso.2009-110
a comparable compost on the market,the Utility shall set the price yards.
for a reasonable cost recovery and to minimize the amount of grass
it shall bury at the landfill.
Wholesale 80%of retail price for retail businesses Reso.2008-97
Wood Chips Same formula as for Compost Reso.2008-97
Unscreened Mulch $1 per cubic yard less than screened Reso.2008-97
compost
DeliveryCosts: If the buyer of compost,mulch or wood chips
does not provide transportation,the Solid Waste Utility may truck
compost,mulch or wood chips at the actual cost plus 10%to any
location within the City of within five(5)miles of the Solid Waste
Transfer/Recycling Facility,whichever is further.The minimum bad
the City shall truck shall be five(5)tons or ten(10)cubic yards. If a
driver or vehide is not available,the Utility may decline to provide
this service. MO 2011-108
Residential Special Collection Program:Customers who request The Solid Waste Utility shall adjust the fees
special,curbside collections of large,bulky items that do not fit in a for the Residential Special Collection
wheeled waste cart shall pay a fee equal to the rate for disposal at Program for Hard-to-handle Items on an
the transfer station plus additional labor and equipment costs.If the annual basis,after adoption of the City's
item is not subject to a disposal fee,a handling fee equal to the budget,to reflect current costs.Maximum of
Hard-to-handle fee at the transfer station shall apply. six(6)items in one(1)trip.
MO 2011-108
Non-Curbside Collection Surcharge.(Wheeled Waste Carts)
Rate/Month 4.00 Reso.2015-071
Replacement FeeThe City reserves the right to charge the
customer for the replacement cost of a lost,
stolen,damaged,or destroyed wheeled
waste cart,metal container,or drop box(es).
MO 2011-108
Emergency/Overtime Fee' Customers requesting emergency service
requiring overtime shall pay an overtime fee
that shall include the overtime rate for the
employee and equipment costs.This fee is
in addition to the regular fee for the"let
container,drop-boxes,or compactors.
MO 2011-108
All solid waste charges are subject to a 1.36%Landfill monitoring
fee.
PUBLIC WORKS DEPARTMENT-AIRPORTS:
Delinquency Pena -Rentals 50.00 Per Occurrence Reso,2007-175 R.M.C.3.04.020
Rentals-Municipal Airport:
Closed Hangar 1-20 174.00 Per Month CPI Reso,2019-060 R.M.C.3.04.020
Closed Hangar 21-29 and 31-40 189.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 30 w/Office 236.00 Per Month CPI Reso.2019-060 R.M.C.3.04.021
Closed Hangar 41-70 205.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 71-80 236.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 81-88 279.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 90-98 334.00 Per Month CPI Reso.2019.060 R.M.C.3.04.020
Port-A-Port 291.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Twin Engine 442.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Jet Pod-Hangar 89 1,184.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Aircraft Tie-Down(single) 40.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Aircraft Tie-Down(twin 8 helicopter) 75.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Aircraft Tie-down(Commercial Use) 112.00 Per Month CPI Reso.2019-060 R.M.C.3.04.021
Transient Tie-Doom
Single 5.00 Per Night Reso.2006-90 R.M.C.3.04.020
Twin 6.00 Per Night Reso.2006-90 R.M.C.3.04.020
Small Business Jet 20.00 Per Night Reso.2006-90 R.M.C.3.04.020
Helicopter 6.00 Per Night Reso.2006-90 R.M.C.3.04.020
Tie-Down Parking-Violation Penalty 50.00 Reso.2007-175 R.M.C.3.04.020
Hangar Office-Single 32.00 Per Month CPI Reso,2019-060 R.M.C.3.04.020
Hangar Office-Twin 55.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Electric Outlet Fee 6.00 Per Outlet Reso.2006-90 R.M.C.3.04.020
Large Aircraft Overnight Fee greater than 2,500 sq.ft 35.00 Per Night CPI Reso.2019-060 R.M.C.3.04.020
Non-Aeronautical Use of Hangars-Premium 99.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Page 12 of 13
CITY OF REDDING
SCHEDULE OF FEES AND SERVICE CHARGES
Fiscal Year 2019-20
2019-20 Last Changed
Type of Fee or Adopted Additional Information Inflation Resolution or Authority
Service Charge Fee Indicator Ordinance
PUBLIC WORKS DEPARTMENT-AIRPORTS-Continued
Rentals-Benton Airport:
Closed Hangar 1-20 161.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 21-30 174.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 31-40 236.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Closed Hangar 41-50 291.00 Per Month CPI Reso.2019-060 R.M.C.3.O4.020
Open Hangar 114.00 Per Month CPI Reso.2019460 R.M.C.3.04.020
Sun Shade Hangar 114.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Aircraft Tie-Down(single) 40.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Aircraft Tie-Down(twin&helicopter) 75.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Aircraft Tie-down(Commercial Use) 112.00 Per Month CPI Reso.2019-060 R.M.C.3.04.021
Transient Tie-Down
Single 5.00 Per Night Reso.200690 R.M.C.3.04.020
Twin 6.00 Per Night Reso.200690 R.M.C.3.04.020
Helicopter 6.00 Per Night React.200690 R.M.C.3.04.020
Tie-Down Parking-Violation Penalty 50.00 Reso.2007-175 R.M.C.3.04.020
Hangar Office-Single 32.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Electric Outlet Fee 6.00 Per Outlet Reso.2006-90 R.M.C.3.04,020
Large Aircraft Overnight Fee greater than 2,500 sq.ft 35.00 Per Night CPI Reso.2019-060 R.M.C.3.04.020
Non-Aeronautical Use of Hangars-Premium 99.00 Per Month CPI Reso.2019-060 R.M.C.3.04.020
Landing Fees:
Aircraft providing regularly scheduled passenger or freight services
(regardless of might) 1.30 Per 1,000 lbs.certified gross landing might Reso.2015-071 R.M.C.3.04.030
Landing Fees:
Non-scheduled passenger or freight aircraft over 60,000 lbs gross
weight 1.30 Per 1,000 lbs,certified gross landing might Reso.2017-054 R.M.C.3.04.030
Landing Fees:
Aircraft operating from Redding Municipal Airport in performance of
special contracts for fighting fire or otherwise with federal,state,or 38.30 For aircraft up to and including 30,000 lbs.of R.M.C.3.04.030
county governments: certified gross landing weight Reso.2015-071
51.07 For aircraft up to and including 60,000 lbs.o/ R.M.C.3.04.030
certified gross landing weight Reso.2015-071
57.44 For aircraft up to and including 80,000 lbs.of
certified gross landing weight Reso.2015-071 R.M.C.3.04.030
63.84 For aircraft over 80,000 lbs.of certified gross
landing weight Reso.2015-071 R.M.C.3.04.030
Helicopter Landing Fee at CDF/USFS pads only 30.00 Per Landing Reso.2007-175 R.M.C.3.04.030
Fuel Flowage Fee 0.07 Per Gallon Reso.2006-90 R.M.C.3.04.025-
Enplaning
.04.020En lanin Passenger Charge 4.50 Per Passenger Reso.2006-90 P.L.101-506Title IX
Ground Rental Rate
Benton Airport
Non-Commercial 0.50 Per square foot per year Reso.2006-90
Commercial 0.40 Per square foot per year Reso.2006.90
Municipal Airport.
Non-Commercial 0.50 Per square foot per year Reso.2006-90
Commercial 0.44 Per square foot per year Reso.2006-90
Small Package Delivery Vehicle User Fee 45.00 Per vehicle per month Reso.2009-110
Reso.2006-90
Hangar Waiting List Deposit 100.00
Paid Parking:
0-4 hours No Charge Reso.2015-071
Daily Parking Rate 9.00 Reso.2015-071
Daily Parking Rate for Vehicles Parked in Short-Term Parking over
Four Hours 18.00 Reso.2015-071
Weekly Rate 54.00 Reso.2015-071
Late Payment Processing Fee 5.00
Title 49 Code of Fed.
SIDA Background Check-Badge Fee 100.00 Per Person MO 2011-108 Regulation Part 1542
SIDA Renewal 20.00 Annual/Per Person/Per Year Reso.2009-110
CHRC Vatting-Process Fee 35.00 Biennial I Per Person Reso.2015-071
Airport Access Bade Fee 20.00 Annual/Per Person/Per Year Reso.2007-175
Lost or Damaged/SIDA or Access Bade Replacement Fee 25.00 Per Occurrence Reso.2009-110
Lon -Tarin Parkin -Special Circumstances 120.00 Annual Reso.2006-90
Air Stairs 50.00 Per Use Reso.2006-90
ADA Jet Aircraft Passenger Ramp 100.00 Per Use Reso.2006-90
ADA Commuter Aircraft Passenger Ramp 50.00 Per Use Reso.2006-90
Juty 21,2010 staff
Commercial Mobile Vendor User Fee 10.00 Per Month report
HOUSING AND COMMUNITY DEVELOPMENT
Photocopies 0.25 Per Copy Reso.2016-071
Copies on CD 4.00 Per CD Reso.2016-071
Substitution and Reconveyance Fee(Auto-adjusted to Shasta
County Fee Schedule) 39.50 Per Reconveyance Reso.2019-060
Subordination Processing Fee 100.00 Reso.2016-071
Page 13 of 13