City Council, Special Meeting
City Council Chambers
777 Cypress Avenue,
Redding, California
June 21,2005,9:30 a.m.
The meeting was called to order by Mayor Mathena with the following Council Members
present: Dickerson, Murray, Pohlmeyer and Stegall.
Also present were City Manager Warren, Assistant City Manager Perry, Assistant City
Manager Starman, Deputy City Manager Bachman, City Attorney Duvernay, Electric Utility
Director F eider, Police ChiefMoty, Development Services DirectorHamilton, Fire Chief Fry
Community Services Director Niemer, Support Services Director Kersten, Personnel
Director Johnson, City Treasurer Clark, Finance Officer Strong, Information Technology
Manager Zempel, City Clerk Strohmayer and Assistant City Clerk Sherman.
I
. RESOLUTION - Adopting the City of Redding Biennial Budget for Fiscal Years 2005-2007
(B-130-070)
Mayor Mathena applauded staffs dedication to the budget process and preparation of a
balanced budget for fiscal years ending June 30, 2006 and 2007. He commented that this
biennial budget proved to be especially challenging given the fact that the City is anticipating
$3 million in take aways from the state.
City Manager Warren explained that the biennial budget approach produces a more
comprehensive and efficient method for administering the City's finances over a two-year
period. The ultimate goal is to consistently produce a balanced budget while maintaining
services in accordance with City Council's direction. Mr. Warren reported that Redding's
budget for 2005-06 amounts to $237.8 million and $242.2 million for 2006-07. He said that
the philosophy behind the budget is what it accomplishes and how it prepares the City for
the future. Mr. Warren defined the four tenets of the budget: 1) It is Revenue Driven - The
biennial budget allows the City Council, staff and the public to look at a conservatively
projected revenue stream for the next two years. 2) Balance Between the Departments - An
important component of the budget is to ensure that all departments do well and that funding
and expenditures are spread evenly across the board; some departments should not suffer
while others prosper. 3) A Balance Between Capital Projects, Personnel and Materials
and Supplies - Historically, the City has balanced these major expenditures groups well, and
4) Fitting the Budget within the Ten-Year Plan - Very few cities approach the budget
process in this manner, but it has proven to be very successful for Redding.
I
Mr. Warren referenced the Mayor's earlier comment with regard to the challenges facing the
City's budget process this year, and while the state will be taking approximately $3 million
from the General Fund over the next two years, the good news is that Measure lA, a
constitutional amendment prohibiting the state from raiding local coffers to balance its
budget, was successful and will take effect in 2006. He pointed to the ever-increasing costs
associated with CalPERS as another challenge recalling that, two years ago, CalPERS
advised cities that they were super funded and no premiums would be required for the next
ten years. However, City staff was skeptical and continued to budget for CalPERS without
change. Mr. Warren said that when the stock market took a significant downturn, many
cities were in dire financial straits, but prudent budgeting allowed Redding to fare better than
most. While significant insurance increases continue to be problematic within the budget
process amounting to $1.2 million in 2005-06 and $600,000 in 2006-07, he pointed out that
it is anticipated that both CalPERS and insurance rates will stabilize in the near future.
I
Mr. Warren said that in order to address these challenges which heavily impacted the General
Fund, 22 positions are being left unfilled for the next two years, General Fund transfers to
rolling stock were reduced by 10% or $100,000 and the Personnel Department will be
bringing Workers Compensation claims in house for a significant savings. However, he
related that while great strides have been made, there is still a back log of street repairs due
to insufficient funding, only about one-half of the funding needed for public art is available,
and no money is available for construction of a new public safety building or for purchasing
open space and other properties. The Storm Drain Utility does not have sufficient funding
and has the added burden of complying with strict state regulations, and while parking funds
are also in the "red," that issue may be solved by potential parking improvements in the
Downtown Area.
6/21/2005
147
I
Mr. Warren pointed out that the Budget Committee zeroed in on the skyrocketing fees
charged to the City for credit card purchases and recommended eliminating their use for
payment of Permit Center fees (which tend to be significant) in order to save the City
approximately $40,000. He added that staff and the Committee recommend reducing the
86% to 89% cost recovery subsidy for planning and engineering fees associated with
development permits by increasing fees to attain a 25% cost recovery the first year and 30%
the second year. This will allow Redding to come closer to the 45% state average. The
proposed Aquatic Center entry fee increase of$l for adults and .50 cents for children will
be put in place to provide "scholarship" funding for low-income individuals to access
recreation facilities and programs, and Airport parking will increase from $5.50 to $6.50 per
day.
Mr. Warren said that the budget provides the highest level of service possible given limited
resources and provides increased funding levels for certain items identified by the City
Council such as projects included in the Capital Improvement Plan, one-time severance
packages and Vacation Buy-Backs, $130,000 for operation of the Sundial Bridge, a $250,000
commitment to the new Library (this is in addition to the City's current commitment), and
another $400,000 in capital construction costs for the Library due to inflation. Mr. Warren
added that the McConnell Foundation has pledged to fund an amount equal to City and
County contributions to the Library. The City will be upgrading its 800 megahertz radio
system within this budget, $350,000 has been budgeted for Turtle Bay, the Airports fund is
now in the "black" and doing well, funds have been budgeted to conduct a community survey
relative to a sales tax increase, and neighborhood revitalization projects continue to work
well and have a dramatic impact on reducing crime rates. Mr. Warren reported that the
City's debt is less than 7% - very low when compared to most cities which have a 10% or
greater debt ratio.
I
City Manager Warren related that three new positions were added to the Engineering
Division due to the number of capital projects which must be completed, and 2.48 new
positions were added in the Electric Department to maintain service at a high level. He also
pointed out that the Risk Management Division will add one position to administer the
Worker's Compensation claims which are being brought in house as mentioned earlier.
Mr. Warren commented that the City's budget is leaner and does not include funding for
"extras"without sacrificing something else. Mr. Warren predicted, however, that within the
next six months, staff would be able to come back to Council with the good news that the
City is in better financial shape that anticipated and there will be an opportunity to do a few
other things at that time. He reaffirmed that the biggest capital project is the Stillwater
Business Park and it is moving along well.
Mr. Warren recognized all the department heads and their staff for meeting the challenges
and bringing in a very lean budget and he acknowledged the Finance Division for its
dedication and commitment to the process.
City Manager Warren introduced the Citizen's Budget Committee Members, Dennis Haws,
Ross Domke and Ginny Mistal explaining that these individuals were selected and invited
to sit in on the budget process, make suggestions and recommendations and to witness, first
hand, how the City develops its budget. He applauded their hard work and focus toward a
balanced budget.
I
Citizen's Budget Committee Members' Comments
Citizen's Budget Committee Member Ginny Mistal thanked the City Council for the
opportunity to again serve on the Committee commenting that the experience validated for
her the decisions made by the Budget Committee two years ago. Ms. Mistal supported the
biennial budget approach pointing out that many other cities are following Redding's lead
by developing two-year budgets. She emphasized that the Committee and staff scrutinized
each line item looking for reductions that would help address the $3 million that will be
taken by the state. She observed that current staffing shortages cannot be sustained long term
and expressed concern regarding escalating insurance and retirement benefits noting that
while staff has earned these benefits, it may be necessary to require employees to share the
cost. Ms. Mistal believed that transient occupancy tax (TOT) and sales tax should be
increased and that the Redding Municipal Airport must provide services commensurate with
other cities through gradual increases. She supported a continued Council presence at the
budget meetings and urged adoption of the budget as submitted.
6/21/2005
148
Committee Member Dennis Haws also appreciated the opportunity to serve on the Budget
Committee and noted that not all cities invite public participation. The Committee looked
at many ways to reduce costs and believed that every line item should be available for cuts.
He observed that employee wages and benefits comprise 80% of most departmental budgets
and asked department heads for reductions in this area. He further noted that insurance and
retirement benefits are escalating to the point that many cities can no longer afford to fund
these. He was impressed with the process and believed that long-term planning is a benefit
to the City and he urged Council's support of the budget.
Committee Member Russ Domke applauded the budget process as open and honest and said
that it had been a rewarding experience. He pointed out that the City must take a hard look
at health insurance benefits and consider mandating shared premiums with employees. He
also believed that the Vacation Buy Back program should be eliminated noting that
employees often earn vacation at an hourly wage rate significantly lower than when those
hours are redeemed, proving very costly for the City. Mr. Domke also believed that Turtle
Bay, while a wonderful community amenity, should follow suit by cutting its budget. He
asserted that the budget is fair and equitable and he encouraged City Council support.
I
Budget Assumptions
Deputy City Manager Bachman provided and overview of the budget assumptions relating
that the City maintains conservative assumption estimates, not only to produce a balanced
budget, but to ensure that the budget fits within the Ten-Year Financial Plan, and that
reserves do not drop below 5%. Mr. Bachman said that Sales Tax Revenue and Transient
Occupancy Tax (TOT) is expected to increase by 4.0%, while a 4.5% increase in Property
Tax is anticipated. Motor vehicle in-lieu revenue is projected to increase 6.0% and revenue
from licenses and permits, fines and penalties should increase by 4%. Mr. Bachman
emphasized that conservative revenue projections are typically below actual revenues.
In response to Council Member Murray, Deputy City Manager Bachman responded that staff
looks at recent history, which reveals fairly good revenue growth, in developing assumptions.
Council Member Murray also questioned the 5% reserve minimum opining that this number
artificially inhibits the City's spending ability for much-needed services such as public
safety. He also questioned the 4.5% property tax increase projection maintaining that actual
increases amount to 2% per year. Mr. Murray acknowledged the rationale of conservative
projections but contended that 5% is an arbitrary number and departmental budgets must be
based on real numbers.
I
Deputy City Manager Bachman acknowledged that as budget years progress, staff can make
changes to the budget as Council directs.
Council Member Pohlmeyer said the budget assumptions appear sound and pointed out that
Council retains the ability to make changes to the budget when required. He cautioned
against changing the budget assumptions at this stage in the process because it would nullify
the entire proposed budget document.
Council Member Dickerson commented that he has served on several agencies that did not
set reserve limits and, as a result, were not able to develop balanced budgets. Mr. Dickerson
believed that this system works well because it is understood that the reserve cannot fall
below a given number in order to plan for the unforseen. Furthermore, while a 5% reserve
is probably too low, he said it can be changed if future revenue warrants.
Council Member Murray said that while he did not disagree, he pointed out that the labor
unions know that these are artificial numbers and that can be problematic during
negotiations, given the Budget Committee's recommendation to look at benefit cost sharing
for employees. He questioned a better time than now to review and modify the assumptions
and the reserve level.
I
Council Member Pohlmeyer said that it is the prerogative of the Mayor or any Council
Member to decide that the assumptions are inadequate and place the item on the City Council
agenda for further discussion. He said that it was his understanding that in the absence of
that discussion, the assumptions are acceptable. Mr. Pohlmeyer suggested that changing the
assumptions at this point in the process is simply too late for this budget cycle.
6/21/2005
149
Administrative' Services Department
Deputy City Manager Bachman related that there are no budget issues for the Finance
Division although it is down by 1 % positions. He acknowledged Council's concern with
regard to the Airports Division's ability to pay down its debt to the General Fund and he
commented that staff is working diligently on long-term debt reduction. To that eIld, he said
that approximately $3.1 million will be repaid to the General Fund leaving a balance of$2.1
million which should be retired by 2009. As earlier mentioned, Mr. Bachman said parking
rates at Redding Municipal Airport will be increased to a level consistent with airports of this
size, but he cautioned that increases should occur gradually so that ridership is not lost to
Sacramento.
I
Community Services Department
Community Services Director Niemer related that the Department includes the Recreation
Division, the Museum and the Park- In- Lieu and Park Development Divisions. She indicated
that the Departmental budget is status quo with the exception of having to increase the
Aquatic Center entry fees to address budget shortfalls. She indicated that because firm
commitments on expected grant money did not materialize, an additional $5,000 is needed
to provide recreation scholarships to low-income individuals at last year's levels. Ms.
Niemer said, however, that staffwill continue to work diligently to obtain maximum grant
funding to ensure facility and program affordability.
Council Member Stegall questioned the increased entry fees at the Aquatic Center and asked
if that would address the scholarship issue. She emphasized the importance of maintaining
recreational facilities and programs at an affordable level for the low-income and suggested
that the City Manager could find the $5,000 in the budget.
Community Services Director Niemer responded that the increase will address most
recreational scholarships and added that the Department is very close to meeting its needs.
I
In response to Council Member Murray, Ms Niemer explained that there is no single
recreation program which could stand to lose $5,000 to satisfy the shortfall, and cutting
smaller amounts from several programs would be ill advised, as well. Ms. Niemer was
confident that the funds could be raised by other means.
City Manger Warren indicated that if Council is so inclined, an additional $5,000 could be
added to the budget for scholarships.
Development Services Department
Development Services Director Hamilton said the departmental budget totals approximately
$7 million and remains status quo with 8% to 10% cuts across the board. He related that two
newly-created positions in the Engineering Division will be funded by Development Impact
and Utility Rate fees and have no impact to the General Fund. With regard to cost recovery
for planning and engineering fees, Mr. Hamilton acknowledged that these amounts have
ebbed and flowed over the years, and are currently at approximately 14% of costs. Staff
would like to increase cost recovery to 25% the first year and 30% the second year in order
to come closer to the state average of approximately 45%.
City Manager Warren intetjected that the budget is predicated on a significant increase in
these fees beginning October 1,2005, and once ~he proposed fee structUre is finalized, staff
will return to City Council for consideration.
I
Council Member Murray expressed frustration with a $2.8 million per year subsidy in
development fee~ while puplic ~afety response times for the Police and Fire Departments
continue to increase due to lack of sufficient personnel. He also pointed to recommendations
of the Zucker Rep~rt which have yet to be implemented su~h as a computer tracking system.
Mr. Murray suggested that the difference between a 45% cost recovery benchmark and
Redding's 70% level could fund the Department's unmet need and put more police officers
on the street.
City Manager Warren explained that after taking all issues into consideration, there simply
was not enough funding in this b~dget to accomplish everything.
Electric Utility Department
Electric Utility Director Feider said that this budget will serve the community well over the
next two years. He reported that the Department is six months into a new operating
6/21/2005
150
paradigm wherein Redding Electric Utility (REU) will dramatically reduce reliance on power
from the Western Area Power Authority (WAPA) in favor of environmentally-friendly
"Green Power" such as solar and wind. REU also continues to rely on natural gas-fired
generating capacity at the Redding Power Plant which is fast becoming expert in gas storage
techniques to minimize costs and maximize revenue for wholesale. He related that the
budget drivers are threefold: 1) the price of natural gas, 2) the weather, and 3) personnel
costs. Mr. F eider noted that personnel costs are up this year by approximately $3 million due
to PERS, PARS and insurance cost increases, bringing the total budget amount to $112.6
million for 2005-06 and $105.9 million for 2006-07. REU provides long-term resource
planning and secures contacts to supply needed power over and above what REU can
provide.
In response to Council Member Murray, Mr. Feider said there is about 350 megawatts of
power available to serve the City with a 15% reserve.
I
Fire Department
Fire Chief Fry said that the Department has no issues, and the total budget comprises
$13,954,830 for 2005-06 and $145,518,150 for 2006-07. He said that the Department's
biggest project is the opening of Fire Station 8 later this year which will be staffed by
existing fire personnel from Airport Fire Station No.7.
In response to Council Member Murray's question as to the number of plan checks and
inspections being performed by Fire Department personnel, Chief Fry stated that the
Department's full time inspector handles the plan checks while the engine companies go out
each day to perform onsite inspections. Mr. Fry indicated that this was the most efficient and
practical use of personnel because it allows the engine companies to become familiar with
building layouts should they have to respond in a fire.
General City Government
Assistant City Manager Bachman explained that General City Government is comprised of
the City Council, City Manager, City Attorney, City Clerk and City Treasurer Departments
and those budgets are status quo for the most part. He pointed out, however, that the City
Manager's and City Attorney's Offices combined are down 1.5 positions (an Economic
Development Director and a shared clerical position), but noted that once the Stillwater
Business Park gets underway, it will be necessary to return to City Council with a marketing
plan which may include a request to fill the Economic Development Director position.
I
Non Departmental
Deputy City Manager Bachman explained that the non-departmental budget covers
issues/items which are not the sole responsibility of anyone department or division. He
provided an overview of the community events supported by the City such as Marketfest, the
Banner Program, Ducky Derby, the Community Christmas Tree and Parade, Kool April
Nites, 3 on 3 Basketball, etc. Funding for these events totals $183,100 for 2005-06 and
$160,600 for 2006-07. Mr. Bachman added that $600,000 was added to cover one-time
retirement costs and an additional $200,000 in capital costs for the new Library. The City
also provides direct support to community projects such as the Shasta County Arts Council,
Diestelhorst Office Park, Superior California Development, Turtle Bay, etc. and these
projects total $1,859.260 for 2005-06 and $1,161,140 for 2006-07.
Turtle Bay Exploration Park
(C-070-250-250)
With regard to Turtle Bay support, Council Member Murray inquired about the funding
source. Mr. Bachman responded that $350,000 has been included in the 2005-06 budget to
assist Turtle Bay, and while no funding is included in the 2006-07 budget, $350,000 has been
earmarked in the City's Ten-Year Financial Plan which can be added to the 2006-07 budget
at Council's direction. He stated that if the intent of the City Council is to continue funding
Turtle Bay at previous levels ($400,000), $50,000 can be added to the 2006-07 budget to
accomplish that end. There is an opportunity, however, to shift an additional $100,000 to
Turtle Bay from other sources such as the Mosaiculture Project ($20,000), Special Projects
($20,000), Electric Utility Public Good funds ($35,000) and Water/Wastewater public
education funds ($25,000).
I
Mr. Warren added that during recent meetings with Turtle Bay President John Peterson, Mr.
Peterson pointed out that if the City continues its support of Turtle Bay, the McConnell
Foundation has indicated that it will also contribute funding for operational costs.
6/2112005
151
Council Member Murray stated that he did not favor adding an additional $50,000 to the
budget, but he supported shifting $100,000 from other areas as set forth above to Turtle Bay
for a total amount of $450,000.
Council Member Stegall questioned the expectations of Turtle Bay with regard to current
and ongoing City funding.
I
John Peterson, President of the Turtle Bay Exploration Park (Park), said the Park is doing
very well with increased memberships and patronage but is faced with additional expense
and a significant increase in personnel costs due to maintenance needs for the newly-
completed Arboretum and gardens. He urged the City Council to continue its financial
support ofthe Park adding that the McConnell Foundation would be more inclined to provide
funding at a level two to three times that of the City through a Foundation grant.
MOTION: Made by Council Member Stegall, seconded by Council Member Pohlmeyer to
maintain the City's level of financial commitment to Turtle Bay Exploration Park with
$400,000 from the General Fund and an additional $100,000 to be shifted from other areas
as defined above for a total of $500,000 for fiscal year 2005-06. The Vote: Unanimous
Ayes.
Municipal Utilities Department
Assistant City Manager Perry said that the Municipal Utilities Department is comprised of
five utility divisions, all of which are dealing with considerable growth and the challenge of
serving approximately 3,000 new residents with aging infrastructure.
I
He related that the Solid Waste Division is in good shape with planned increases. Water and
Wastewater Divisions are both on Master Plans and working smoothly. The Storm Drain
Utility Division is short on funding but increasing fees would require a 2/3 majority vote
from the public. He said that staff in the Streets Division is aggressively working on the
significant backlog of street repairs to the extent possible, and the debt service was reduced
by $800,000 by paying off some bonds. He pointed out that the biggest projects are
augmenting the water supply and the expansion of the Clear Creek Wastewater Treatment
Plant.
Council Member Murray questioned how spending an additional $3.8 million over previous
years in street repairs could be accomplished without adequate personnel resources.
Assistant City Manager Perry responded that the smaller jobs and repairs would go to
outsourcing contracts.
Personnel Department
Personnel Director Johnson advised that the Department has no budget issues but Worker's
Compensation claims, formerly managed by CMI, Inc., will be brought in house for a
significant savings. Even with increased personnel and equipment, it is anticipated that the
City will save approximately $390,000 over the next five years and provide more efficient
service to City employees.
I
In response to Council Member Murray, Ms. Johnson said that the City is effectively
utilizing its volunteer corps and, while they continue to actively recruit more volunteers,
most individuals are looking for gainful employment. With regard to employee morale, Ms.
Johnson reported that Personnel receives more phone calls from employees feeling the
effects of doing more with fewer resources, and from Department Directors who are
cognizant that the work must get done. At this time, she said, there are unfortunately not
enough employees to meet all the goals and this is an ongoing problem being experienced
by every city in the state.
Police Department
Police Chief Moty said that his Department is the largest in the General Fund and that staff
looked hard for areas to cut. He said that some projects will be placed on hold until budget
times are better. However, he pointed out that insufficient personnel resources and the
expanding population of the City, has increased response times for in-progress calls to
approximately 14.5 minutes. Mr. Moty said that as the City continues to grow, it is
imperative to plan and have sufficient resources on hand.
6/21/2005
152
Council Member Murray described the response time for in-progress calls as unacceptable
and reiterated his dissatisfaction that the proposed budget does not provide funding to
adequately staff public safety services.
Support Services Department
Support Services Director Kersten advised that the Department, which includes Information
Technology, Reprographics, the Convention Center and Visitor's Bureau, Fleet Maintenance,
Park and Facilities Maintenance and Purchasing has no budget issues. He said the
Department is diversified and budget cuts have been made as required, however, the 800 mhz
radio system must be replaced and the plan is to finance approximately $1.9 million of$2.7
million cost for the system.
Funding Requests Received After Preparation of the Proposed Budget
Deputy City Manager Bachman recalled that the City Council deferred the following funding
requests to today's discussions: 1) financial assistance for the Shasta County Detox Center,
and 2) a funding request from AmeriCorps Vista of America, coordinators ofthe "Bike the
Sundial" event. Mr. Bachman advised that the Detox Center issue can again be deferred as
the County works through problems surrounding this facility. However, AmeriCorp has
requested approximately $3,000 in City assistance for this community event to be held on
Sunday, July 16, 2005.
I
City Manager Warren said that because a representative from AmeriCorps Vista was unable
to attend today' s meeting to provide more information regarding the event, he would contact
the event coordinators and return to Council with additional information at a regular City
Council Meeting.
City Manager Warren recapped his understanding of City Council's direction as follows:
1) Add $5,000 to the Community Services Department budget to provide recreational
scholarships for City programs and facilities to service the low-income, 2) consider higher
fees and lower subsidies for planning and engineering permits to bring Redding's cost
recovery closer to the state average of 45%, and 3) consider funding a project tracking system
for the Development Services Division and additional police officers should future revenue
allow.
I
MOTION: Made by Council Member Pohlmeyer, seconded by Council Member Stegall
adopting Resolution No. 2005-77, a resolution of the City Council of the City of Redding
adopting and approving the Biennial Budget for Fiscal Years ending June 30, 2006 and June
30,2007. The Vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Council Members: Dickerson, Pohlmeyer, Stegall and Mathena
Council Members: Murray
Council Members: None
Council Members: None
Resolution No. 2005-77 is on file in the Office of the City Clerk.
ADJOURNMENT
There being no further business, at the hour of 12:35 p.m., Mayor Mathena declared the
meeting adjourned.