Loading...
HomeMy WebLinkAboutReso 2018-007 - Capital Improvement Plan RESOLUTION NO. 2018-007 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING ADOPTING THE REDDING CAPITAL IMPROVEMENT PLAN FOR 2017-18 TO 2022-23 WHEREAS, a Capital Improvement Plan (CIP) has been prepared which identifies the City's long-term capital improvement project needs in a comprehensive and consistent format; and WHEREAS, the CIP was prepared in a format and with content that is consistent with the requirements of Government Code Section 66002, which establishes requirements for the preparation of a CIP that includes projects subject to development impact fees; and WHEREAS,the CIP was reviewed by the Redding Planning Commission on November 21,2017, and was approved as consistent with the General Plan pursuant to Government Code Section 65103c; and WHEREAS, on January 16, 2018, the City Council held a duly noticed public hearing to allow opportunity for public comment on the draft CIP; and WHEREAS, having satisfied the requirements of law governing preparation, content, general plan consistency, and opportunity for public review, the City Council wishes to adopt said CIP to formalize the document so it can become available for consideration in budgeting, land use 51) planning, and accounting, among other benefits; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding does o hereby approve and adopt the Redding Capital Improvement Plan for 2017-18 to 2022-23 included CC herewith as Attachment "A." G I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the 0 City Council of the City of Redding on the 16th day of January, 2018, and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: McElvain, Sullivan,Weaver,Winter, & Schreder NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None In , Le va, \/ I‘/5-Wi SCHREDER, Mayor ATTEST: FORM APPROVED: I Lk) . PAM MIZE, City Oldli BARRY E. DeWALT, i y Attorney CITY O F REDD • r ►A011. ► �r.� � C A Lr - : . CAPITAL IMPROVEMENT PLAN TABLE OF CONTENTS A Introduction A-1 B General Overview • Division Descriptions B-1 • Project Summary B-6 • Funding Overview by Division B-11 • Funding Overview by Source B-14 C Detailed Program Summary • Airports C-1 • Community Services C-6 • Redding Electric Utility C-10 • Solid Waste C-23 • Storm Drain Utility C-27 • Streets C-31 • Wastewater C-43 • Water C-49 • Future/Unfunded Projects C-55 SECTION A INTRODUCTION INTRODUCTION The City of Redding's 2017-18 to 2022-23 Capital Improvement Plan (CIP) is a five-year outlook on anticipated capital projects in the City of Redding. The City is required by Government Code 66002 to prepare and adopt a CIP. This document is used as a tool to help ensure that the City's short- and long-term capital investments are made in the context of careful consideration of the City's needs as well as the resources available to fund the related capital projects. THE CIP AND GOOD PLANNING In general, all projects have their roots in the City's General Plan and in a particular department's master plan or other long-range planning document. For example, the General Plan includes goals and policies related to the City's wastewater treatment and collection system while the Wastewater Master Plan incorporates this direction, accounts for expected growth and the condition of the existing infrastructure, anticipates revenue, and identifies resulting infrastructure needs. These needs are then rolled into projects, a project delivery schedule is developed and then the projects summarized in the CIP. Section 65103c of the Government Code requires planning agencies to review the CIP for consistency with the General Plan. The Planning Commission reviewed the CIP on November 21, 2017, and found it consistent with the General Plan. THE CIP AND THE CITY'S 2-YEAR BUDGET AND 10-YEAR FINANCIAL PLAN The budgeting for the City's CIP starts with the development of CIP FUNDING SUMMARY the City's 2-year budget and 10-year financial plan. This biennial process includes a Shasta County State Utility Rates` $500,000 combination of detailed staff $171,393,5810.2% $450,000 analysis and broad public 53.3% V0.1% involvement. It is during this RRA process that basic municipal -.51,970,950 operational and specific 0.6% infrastructure needs are Airport Fund identified and matched with $589,886 revenues generated from 0.2% various local, state and federal Airport PFC funding sources. This CIP is a $1,907,187 projected $322 million plan with 0.6% revenue from 33 different Local Streets and Grants sources that can be grouped Roads Fund 592,395,279 into eight different funding $19,660,989 28.7% source categories. A detailed 6.1% breakdown of the CIP funding by General Fund $88,890 Impact Fees Donations funding source can be found 0.0% $32,709,126 beginning on page B15 while a 10.2% $ 00%0 summary by funding source category is provided on the chart. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 A-1 TEAM EFFORT IN BUILDING THE CIP The document is prepared by the Engineering Division in the Public CIP FUNDING BY DIVISION Works Department with input from Streets all Departments in the City. As $99,613,887 noted above, many other 31.0% Wastewater commissions, community groups $69,635,035 and partners have ongoing input Storm Drain 21.6% into the planning and budget $4,232,060 documents that are the foundation 1.3% of the CIP. The plan includes projects from all areas in the City including, but not limited to, '>a projects that improve the City's Solid Waste $3,258,993 streets, sewer facilities, water 1.o% § facilities, storm drain facilities, t- , .;: airports, and park facilities. The REU Y '`' major emphasis in this CIP is rehabilitation and replacement of $60,590,2601 .8 � ` aging infrastructure in the City's five rate-funded utilities and Water $45,992,180 streets program. This section Community 14.3% contains two charts breaking out Services Airports the CIP by program and each of $7,269,470 $31,144,763 2.3% 9.7% the programs by their basic funding sources. FUNDING TYPE BY DIVISION Wastewater ■Airport Fund Water •Donation 4 General Fund Solid Waste Grant •Impact Fees Streets ■Local Streets and Roads Fund Storm Drain ■PFC ■State REU ■Streets •Utility Rates Community Services I RRA Airports I . A County 0% 20% 40% 60% 80% 100% CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 A-2 CIP ORGANIZATION The document includes a general overview followed by detailed program-by-program summaries of the entire plan. Section B - General Overview The general overview includes an overview of each City division contributing to the CIP, followed by a division by division summary of all projects with projected project costs (project development plus construction) and anticipated year of construction and concluding with a detailed overview of the various funding sources. The City's CIP includes 151 projects with a projected funding need of $322 million. The funding for the five-year CIP consists of local, state and federal funding from 33 different funding sources. Section C - Detailed Program Summaries The detailed program summary includes an overview of the program including project by project summaries. These summaries include project descriptions, locations, funding sources, and anticipated schedule for when project development and construction funds will be needed. Funding Legend ATP —Active Transportation Program CDBG — Community Development Block Grant HBP — Local Highway Bridge Program HSIP — Highway Safety Improvement Program PFC — Passenger Facility Charge SRTS — Safe Routes to School STIP — State Transportation Improvement Program SB1 RMRA— Senate Bill 1 Road Maintenance and Rehabilitation Account PFC —Airport Passenger Facility Charge RRA— City of Redding as Successor Agency for the Redding Redevelopment Agency CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 A-3 SECTION B GENERAL OVERVIEW AIRPORTS There are two airports located within Redding. The Redding Municipal Airport, located in the southeast portion of the City, is designated as a certified airport for commercial airline operations. Benton Airpark, located close to Downtown Redding at Placer Street and Airpark Drive, is a general aviation facility which provides reliever support to the Redding Municipal Airport. Both facilities are owned and operated by the City. The availability of convenient air transportation for residents and businesses is an asset to the community and can be used as a marketing tool in the City's economic development efforts. The 2005 Airport Master Plans outline future improvements planned for the Redding Municipal Airport and Benton Airpark. In addition to a listing of proposed improvement projects, the Master Plans identify estimated costs and general time frames (short-term, long-term, etc.) for installation of the improvements. General Plan Consistency: The projects planned for both airports are consistent with the General Plan's goals, objectives, and policies, which promote the maintenance and enhancement of our airports to provide convenient airport service for the community and strive to minimize any adverse impacts resulting from aircraft operations or airport expansion. Reference: Goals T9, T10, PF14; Policies T9F, T10A, T100, PF14A, PF14B, and PF14C. COMMUNITY SERVICES The Community Services Department oversees all the programming within the park system and the development, expansion, and enhancement of the park, trail, and open-space amenities. Currently, the City of Redding owns and operates a complete range of park and recreation facilities that include 68 park sites on approximately 635 acres of land. The park system includes the smallest of neighborhood parks, large regional parks, state-of-the-art athletic facilities, and special-use facilities, e.g., boat ramps and a dog park. The trail system has been recognized by federal and state agencies as a model. The core of the trail system is the Sacramento River Trail with many connecting trails and public open spaces. With several large athletic facilities completed in the last decade, including the Big League Dreams Park, the Redding Aquatic Center, and the Redding Soccer Park, resources have been redirected to the development of large neighborhood parks. Currently, the Department has agreements with five subdivision developers to build neighborhood parks concurrent with the houses. Park development fee credits will fund the bulk of the construction. General Plan Consistency: The proposed park and recreation projects are consistent with the General Plan's goals, objectives, and policies which promote the improvement of park and recreation facilities Citywide. Reference: Goals R4, R11, R12, PF15; Policies (all policies listed under the noted goals). CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-1 PUBLIC SAFETY Police Department. The Redding Police Department has the primary responsibility of providing police protection and emergency-service response within the City limits. A mutual aid agreement is in effect with agencies on a statewide basis. The Redding Police Department has three main divisions —Administrative Services, Field Operations, and Investigations. Officers are assigned to seven beats throughout the City and are dispatched to calls via radio and mobile data computer. There are currently no planned 5-year capital improvements for the Police Department Fire Department. The Redding Fire Department has the primary responsibility of providing fire protection and emergency-service response within the City limits. A mutual aid agreement is in effect with California Department of Forestry and Fire Protection (CDF ) during the wildland fire season for wildland and structure fires within a one-mile fringe area surrounding the City. An automatic aid agreement with the Shasta County Fire Department is also in effect for structure fires outside the wildland fire season. Under these agreements, the Redding Fire Department responds within a one-mile fringe area surrounding the City and to county islands. Shasta County Fire Department responds to a small geographic area on the east side of the City. The Redding Fire Department has three main divisions: Administration, Operations, and Fire Prevention. It operates from eight stations and a Fire Headquarters at City Hall. There are currently no planned 5-year capital improvement needs for the Fire Department. REDDING ELECTRIC UTILITY As a California municipal corporation, the City of Redding owns, operates, and maintains power generation, transmission, and distribution facilities within the City limits. Given the investment in such facilities and a commitment to providing power at the lowest possible rates, it has historically been Redding's policy to be the sole provider of electric service within the City limits. As areas are annexed, City electric service is made available when PG&E facilities can be purchased or when service can be provided through a logical extension of the City's electric distribution system. Redding Electric Utility (REU) currently provides service to its customers in an area approximately 61 square miles in size, with 62 miles of 115-kV transmission lines and 736 miles of overhead and underground 12-kV distribution lines. REU is proud of its record over the past year of 99.97 percent electric service reliability. To remain competitive and to serve present and future demands for electric service, the Electric Utility plans on expanding the electric system in a logical manner to enhance its ability to deliver energy to customers and will acquire new energy resources as needed to meet customer energy needs. In addition to securing various long- and short-term power purchase contracts, the City owns and operates 183 MW of gas-fired generation within the City limits. General Plan Consistency: The projects planned for the Electric Utility are consistent with the General Plan's goals, objectives, and policies, which promote programs that provide safe, reliable, and competitively priced electricity for existing and future City electric customers. Reference: Goals CDD2 and PF7; Policies CDD2E, PF7A, PF7B, PF7C, PF7D, PF7E, and PF14F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-2 SOLID WASTE Solid waste generated in the City is disposed of at Shasta County's Richard W. Curry/West Central Sanitary Landfill. Under existing state permits, the landfill has sufficient capacity to accommodate the disposal of solid waste at least to the year 2030. Expansion of the facility also appears to be plausible at such time as increased capacity is warranted beyond the extent of existing permits. Although Shasta County owns the Richard W. Curry Landfill, it has contracted with the City of Redding for the operation and management of the facility. This arrangement was formalized in 1988. All residential, commercial, and industrial refuse in Redding is collected by City personnel. Since 1995, the City has operated its own Solid Waste Transfer Station for the transfer of City-collected residential, commercial, and industrial refuse and the transfer of self-haul public refuse. The facility also has the capability of processing materials collected by curbside recycling programs and contains a household hazardous waste drop-off/processing area and a composting area. General Plan Consistency: The proposed solid waste projects are consistent with the Solid Waste Facility Master Plan and the City's General Plan goals, objectives, and policies, which promote the efficient collection and disposal of solid waste, while maintaining an adequate waste-disposal capacity. Reference: Goals CDD2 and PF8; Policies CDD2E and PF8A. STORM DRAINS The Redding Planning Area contains 15 watershed basins. Public storm-drainage facilities within the City limits are operated and maintained by the City. Surrounding unincorporated areas are the responsibility of the County of Shasta. As new areas are annexed, the City assumes responsibility for stormwater management. The City currently has a range of public and private storm-drain facilities to provide safe and efficient capture and conveyance of stormwater runoff and minimize the risks of flooding. Storm-drain facilities include more than 200 miles of storm drain pipe, more than 7,000 inlets, 1,200 outfalls and 200 miles of open channel. These systems typically outfall into natural ravines or tributaries and ultimately to the Sacramento River. General Plan Consistency: The proposed storm-drainage projects are consistent with the General Plan's goals, objectives, and policies, which promote efforts to reduce flooding and to properly manage stormwater runoff from development. Reference: Goals CDD2 and PF9; Policies CDD2E, PF9A, PF9B, and PF9F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-3 PUBLIC SAFETY Police Department. The Redding Police Department has the primary responsibility of providing police protection and emergency-service response within the City limits. A mutual aid agreement is in effect with agencies on a statewide basis. The Redding Police Department has three main divisions —Administrative Services, Field Operations, and Investigations. Officers are assigned to seven beats throughout the City and are dispatched to calls via radio and mobile data computer. There are currently no planned 5-year capital improvements for the Police Department Fire Department. The Redding Fire Department has the primary responsibility of providing fire protection and emergency-service response within the City limits. A mutual aid agreement is in effect with California Department of Forestry and Fire Protection (CDF ) during the wildland fire season for wildland and structure fires within a one-mile fringe area surrounding the City. An automatic aid agreement with the Shasta County Fire Department is also in effect for structure fires outside the wildland fire season. Under these agreements, the Redding Fire Department responds within a one-mile fringe area surrounding the City and to county islands. Shasta County Fire Department responds to a small geographic area on the east side of the City. The Redding Fire Department has three main divisions: Administration, Operations, and Fire Prevention. It operates from eight stations and a Fire Headquarters at City Hall. There are currently no planned 5-year capital improvement needs for the Fire Department. REDDING ELECTRIC UTILITY As a California municipal corporation, the City of Redding owns, operates, and maintains power generation, transmission, and distribution facilities within the City limits. Given the investment in such facilities and a commitment to providing power at the lowest possible rates, it has historically been Redding's policy to be the sole provider of electric service within the City limits. As areas are annexed, City electric service is made available when PG&E facilities can be purchased or when service can be provided through a logical extension of the City's electric distribution system. Redding Electric Utility (REU) currently provides service to its customers in an area approximately 61 square miles in size, with 62 miles of 115-kV transmission lines and 736 miles of overhead and underground 12-kV distribution lines. REU is proud of its record over the past year of 99.97 percent electric service reliability. To remain competitive and to serve present and future demands for electric service, the Electric Utility plans on expanding the electric system in a logical manner to enhance its ability to deliver energy to customers and will acquire new energy resources as needed to meet customer energy needs. In addition to securing various long- and short-term power purchase contracts, the City owns and operates 183 MW of gas-fired generation within the City limits. General Plan Consistency: The projects planned for the Electric Utility are consistent with the General Plan's goals, objectives, and policies, which promote programs that provide safe, reliable, and competitively priced electricity for existing and future City electric customers. Reference: Goals CDD2 and PF7; Policies CDD2E, PF7A, PF7B, PF7C, PF7D, PF7E, and PF14F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 B-2 WATER The City provides water for domestic and fire-suppression uses to most of the City and to small portions of the surrounding unincorporated area. The water system is supplied by two treatment plants and well fields. Facilities include: the Foothill Treatment Plant, which has a capacity of 28 million gallons per day (mgd); the Buckeye Treatment Plant, which has a capacity of 14.0 mgd; the Enterprise and Cascade well systems, which have a capacity of 19.1 mgd; and the City's water distribution system, which has approximately 430 miles of water mains. The water system serves about 83 percent of the current population of Redding and about 1,800 residents in the surrounding unincorporated area. The water utility provides service to approximately 29,000 households. General Plan Consistency: The proposed water projects are consistent with the General Plan's goals, objectives, and policies, which support efforts to maintain an adequate level of service in the City's water treatment and distribution system as needed to meet existing and future needs. Reference: Goals CDD2 and PF5; Policies CDD2E, PF5A, PF5B, and PF5C. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-5 PUBLIC SAFETY Police Department. The Redding Police Department has the primary responsibility of providing police protection and emergency-service response within the City limits. A mutual aid agreement is in effect with agencies on a statewide basis. The Redding Police Department has three main divisions —Administrative Services, Field Operations, and Investigations. Officers are assigned to seven beats throughout the City and are dispatched to calls via radio and mobile data computer. There are currently no planned 5-year capital improvements for the Police Department Fire Department. The Redding Fire Department has the primary responsibility of providing fire protection and emergency-service response within the City limits. A mutual aid agreement is in effect with California Department of Forestry and Fire Protection (CDF ) during the wildland fire season for wildland and structure fires within a one-mile fringe area surrounding the City. An automatic aid agreement with the Shasta County Fire Department is also in effect for structure fires outside the wildland fire season. Under these agreements, the Redding Fire Department responds within a one-mile fringe area surrounding the City and to county islands. Shasta County Fire Department responds to a small geographic area on the east side of the City. The Redding Fire Department has three main divisions: Administration, Operations, and Fire Prevention. It operates from eight stations and a Fire Headquarters at City Hall. There are currently no planned 5-year capital improvement needs for the Fire Department. REDDING ELECTRIC UTILITY As a California municipal corporation, the City of Redding owns, operates, and maintains power generation, transmission, and distribution facilities within the City limits. Given the investment in such facilities and a commitment to providing power at the lowest possible rates, it has historically been Redding's policy to be the sole provider of electric service within the City limits. As areas are annexed, City electric service is made available when PG&E facilities can be purchased or when service can be provided through a logical extension of the City's electric distribution system. Redding Electric Utility (REU) currently provides service to its customers in an area approximately 61 square miles in size, with 62 miles of 115-kV transmission lines and 736 miles of overhead and underground 12-kV distribution lines. REU is proud of its record over the past year of 99.97 percent electric service reliability. To remain competitive and to serve present and future demands for electric service, the Electric Utility plans on expanding the electric system in a logical manner to enhance its ability to deliver energy to customers and will acquire new energy resources as needed to meet customer energy needs. In addition to securing various long- and short-term power purchase contracts, the City owns and operates 183 MW of gas-fired generation within the City limits. General Plan Consistency: The projects planned for the Electric Utility are consistent with the General Plan's goals, objectives, and policies, which promote programs that provide safe, reliable, and competitively priced electricity for existing and future City electric customers. Reference: Goals CDD2 and PF7; Policies CDD2E, PF7A, PF7B, PF7C, PF7D, PF7E, and PF14F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 8-2 SOLID WASTE Solid waste generated in the City is disposed of at Shasta County's Richard W. Curry/West Central Sanitary Landfill. Under existing state permits, the landfill has sufficient capacity to accommodate the disposal of solid waste at least to the year 2030. Expansion of the facility also appears to be plausible at such time as increased capacity is warranted beyond the extent of existing permits. Although Shasta County owns the Richard W. Curry Landfill, it has contracted with the City of Redding for the operation and management of the facility. This arrangement was formalized in 1988. All residential, commercial, and industrial refuse in Redding is collected by City personnel. Since 1995, the City has operated its own Solid Waste Transfer Station for the transfer of City-collected residential, commercial, and industrial refuse and the transfer of self-haul public refuse. The facility also has the capability of processing materials collected by curbside recycling programs and contains a household hazardous waste drop-off/processing area and a composting area. General Plan Consistency: The proposed solid waste projects are consistent with the Solid Waste Facility Master Plan and the City's General Plan goals, objectives, and policies. which promote the efficient collection and disposal of solid waste, while maintaining an adequate waste-disposal capacity. Reference: Goals CDD2 and PF8; Policies CDD2E and PF8A. STORM DRAINS The Redding Planning Area contains 15 watershed basins. Public storm-drainage facilities within the City limits are operated and maintained by the City. Surrounding unincorporated areas are the responsibility of the County of Shasta. As new areas are annexed, the City assumes responsibility for stormwater management. The City currently has a range of public and private storm-drain facilities to provide safe and efficient capture and conveyance of stormwater runoff and minimize the risks of flooding. Storm-drain facilities include more than 200 miles of storm drain pipe, more than 7,000 inlets, 1,200 outfalls and 200 miles of open channel. These systems typically outfall into natural ravines or tributaries and ultimately to the Sacramento River. General Plan Consistency: The proposed storm-drainage projects are consistent with the General Plan's goals, objectives, and policies, which promote efforts to reduce flooding and to properly manage stormwater runoff from development. Reference: Goals CDD2 and PF9; Policies CDD2E, PF9A, PF9B, and PF9F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 B-3 STREETS Redding is both defined and constrained by its network of highways, roads, trails, railroads, and transit services that move its residents and goods in, through, and out of the community. The City is responsible for ensuring the construction and maintenance of all public streets, sidewalks, bridges, bikeways, traffic signals, and street signage within the City limits. The City also maintains a variety of Caltrans facilities consistent with the terms of various cooperative agreements. Developers are either partially or totally responsible for new street construction depending on the type and location of the project. The City uses public funds to build or improve major streets when the improvements were not constructed as part of a land development project. General Plan Consistency: The projects planned for streets are consistent with the General Plan's goals, objectives, and policies, which promote the development and maintenance of a safe and efficient public-street and bicycle-route system. Reference: Goal T3, T4, T6, T8, PF11, and PF12; Policies T3A, T3D, T4A, T4B, T6D, T6E, T8B, T8C, PF11B, PF11C, PF11D, and PF11E. BUILDING MAINTENANCE The Building Maintenance Division is responsible for many internal City functions including the maintenance and repair of the City's facilities such as City Hall, the Corporation Yard and the multiple Redding Fire Stations to name a few. There are currently no planned 5-year capital improvements for the division. WASTEWATER The City of Redding is the sole provider of wastewater service within the City limits. The wastewater system has two major service areas, one served by the Clear Creek Wastewater Treatment Plant and the other served by the Stillwater Wastewater Treatment Plant. Facilities include: the Clear Creek Wastewater Treatment Plant, initially constructed in 1966, which currently has a capacity of 9.4 million gallons per day (mgd); the Stillwater Treatment Plant, put into service in 1992, which has a capacity of 4.0 mgd; and the wastewater collection system, which has approximately 430 miles of sewer mains, 17 lift stations, and over 7,000 manholes. The wastewater system serves nearly all developed property within the City, plus a few small developments in the surrounding unincorporated area. The City provides service to more than 43,000 household equivalents. One household equivalent is the average amount of wastewater produced by an average single-family residence, which is about 240 gallons per day. General Plan Consistency: The proposed wastewater projects are consistent with the General Plan's goals, objectives, and policies which support efforts to achieve and maintain an adequate level of service in the City's sewage collection and treatment system as needed to meet existing and future needs. Reference: Goals CDD2 and PF6; Policies CDD2E, PF6A, PF6B, and PF6C. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 B-4 WATER The City provides water for domestic and fire-suppression uses to most of the City and to small portions of the surrounding unincorporated area. The water system is supplied by two treatment plants and well fields. Facilities include: the Foothill Treatment Plant, which has a capacity of 28 million gallons per day (mgd); the Buckeye Treatment Plant, which has a capacity of 14.0 mgd; the Enterprise and Cascade well systems, which have a capacity of 19.1 mgd; and the City's water distribution system, which has approximately 430 miles of water mains. The water system serves about 83 percent of the current population of Redding and about 1,800 residents in the surrounding unincorporated area. The water utility provides service to approximately 29,000 households. General Plan Consistency: The proposed water projects are consistent with the General Plan's goals, objectives, and policies, which support efforts to maintain an adequate level of service in the City's water treatment and distribution system as needed to meet existing and future needs. Reference: Goals CDD2 and PF5; Policies CDD2E, PF5A, PF5B, and PF5C. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-5 PROJECT SUMMARY AIRPORTS Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page A-BEN-18-1 Rehab Parallel Taxiway B 2018-19 $883,000 C-1 A-BEN-18-2 Construct Perimeter Road 2017-18 $300,000 C-1 A-BEN-20-1 Eastside T-Hangar Taxilane Reconstruction 2019-20 $2,940,000 C-1 A-BEN-20-2 Runway Pavement Preservation 2019-20 $630,000 C-2 A-BEN-22-1 Northeast Apron and Taxilanes Reconstruction 2021-22 $1,942,000 C-2 A-BEN-23-1 Rehab Parallel Taxiway A 2022-23 $530,200 C-2 A-BEN-23-2 Westside T-Hanger Taxilane Reconstruction 2021-22 $3,500,000 C-3 A-MUN-16-2 T-Hangar Taxilane Reconstruction 2017-18 $4,254,563 C-3 A-MUN-18-7 New PAPI for Runway 30 2017-18 $90,000 C-3 A-MUN-19-1 Reconstruct Runway 16 Blast Pad, MAGVAR, and Taxiway H 2018-19 $4,460,000 C-4 A-MUN-19-2 Reconstruct Terminal/Airport Loop Access Road 2018-19 $4,215,000 C-4 A-MUN-21-1 Parallel Runway 2020-21 $5,300,000 C-4 A-MUN-22-3 Pavement Preservation -Aprons and Taxiways 2021-22 $1,000,000 C-5 A-MUN-23-6 All Weather Perimeter Road 2022-23 $1,100,000 C-5 $31,144,763 COMMUNITY SERVICES Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page CS-2005-17 Westridge Park Development 2020-21 $1,750,000 C-6 CS-2005-21 Shastina Ranch Park Development 2018-19 $1,720,000 C-6 CS-2005-23 Bel-Air Park Development 2018-19 $500,000 C-6 CS-2005-30 Highland Park Development 2017-18 $330,000 C-7 CS-2011-01 Salt Creek Heights Park 2018-19 $1,400,000 C-7 CS-2015-01 Henderson Open Space 2017-18 $626,840 C-7 CS-2017-01 Redding Riffle 2017-18 $630,470 C-8 CS-2017-02 Magnolia Park Acquisition 2017-18 $241,400 C-8 CS-2017-03 Rolling Hill Park 2017-18 $15,760 C-8 CS-2017-04 Country Heights Park 2017-18 $40,000 C-9 CS-2017-05 East Oaks Park 2017-18 $15,000 C-9 $7,269,470 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-6 PROJECT SUMMARY REU Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page REU-2007-03 Electric Utility GIS Mapping (GIS Conversion) 2017-18 $689,500 C-10 REU-2009-04 General Generator Upgrade Ongoing $16,140 C-10 REU-2011-02 Corporation Yard Expansion 2017-18 $1,100,000 C-10 REU-2011-07 Asphalt Paving (Plant Resurfacing) 2017-18 $100,000 C-11 REU-2013-03 CT Gas Leak Detection System 2017-18 $90,000 C-11 REU-2013-06 CT Unit#1 AVR Upgrade 2017-18 $128,000 C-11 REU-2015-02 Power Plant Generator Paint 2017-18 $197,480 C-12 REU-2015-04 Unit 5 Automation Upgrade 2017-18 $60,000 C-12 REU-2015-05 Vibration Monitor for Unit 9 2018-19 $40,000 C-12 REU-2015-07 Upstream NOx Analyzers 2016-17 $5,720 C-13 REU-2015-10 General Plant Automation 2017-18 $196,890 C-13 REU-2015-12 Electrical Equipment Improvement 2017-18 $125,000 C-13 REU-2015-13 Gas Chromatograph 2017-18 $17,000 C-14 REU-2015-16 Unit 1 Fast Start Upgrade 2017-18 $60,000 C-14 REU-2015-18 Units 3 and 4 Protective Relay Upgrade 2017-18 $180,000 C-14 REU-2015-19 Unit 4 Delta V Upgrade 2016-17 $21,470 C-15 REU-2015-22 Remittance Equipment Replacement 2017-18 $205,000 C-15 REU-2015-23 Customer Self-Service Suite 2017-18 $500,000 C-15 REU-2017-01 General System Improvements Ongoing $33,951,080 C-16 REU-2017-02 Catalyst Replacement Units 5&6 2017-18 $1,659,980 C-16 REU-2017-03 Redding Power Battery Monitoring Sty 2017-18 $100,000 C-16 REU-2017-04 Unit 4 Station Service Battery Replacement 2017-18 $110,000 C-17 REU-2017-05 Unit 5 Station Service Battery Replacement 2017-18 $87,000 C-17 REU-2017-06 Unit 5 Station Service Battery Storage Building 2017-18 $244,000 C-17 REU-2017-07 Upgrade Plant Safety Showers 2017-18 $50,000 C-18 REU-2017-08 Unit 9 Plant Controls Upgrade 2018-19 $350,000 C-18 REU-2017-09 Convert Peaking Generator Emissions Catalyst to Urea 2017-18 $80,000 C-18 REU-2017-10 Unit 2 Generator Protective Relays Upgrade 2018-19 $90,000 C-19 REU-2017-11 Substation Re-Roofing Project 2018-19 $39,000 C-19 REU-2017-12 Oregon Substation Modernization 2017-18 $3,500,000 C-19 REU-2017-13 Next Generation Firewalls 2017-18 $120,000 C-20 REU-2017-14 Substation Pole and Radio Replacement 2017-18 $123,000 C-20 REU-2017-15 Redding Power Substation Controls Modernization 2018-19 $138,000 C-21 REU-2017-16 Substation Network Upgrades 2017-18 $35,000 C-21 REU-2017-17 Waldon Substation Modernization 2017-18 $3,179,000 C-22 REU-2017-18 Future Revenue-Funded Capital Projects 2019-20 $13,002,000 C-22 $60,590,260 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-7 PROJECT SUMMARY SOLID WASTE Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page SW-4083-01 Benton Landfill Dirt Work 2017-18 $350,000 C-23 SW-4083-02 Benton Landfill Monitoring Station 2017-18 $55,000 C-23 SW-4941-01 Transfer Station Tipping Floor Ongoing $721,993 C-23 SW-4941-02 Transfer Facility Resurface Asphalt Ongoing $750,000 C-24 SW-4941-03 Slurry Seal 2018-19 $102,000 C-24 SW-4941-05 Recycling Baler 2018-19 $780,000 C-24 SW-4941-06 Crane Repairs 2019-20 $80,000 C-25 SW-4941-07 Wash Rack 2017-18 $20,000 C-25 SW-4941-08 Lift Station Retrofit 2017-18 $50,000 C-25 SW-4941-09 Feasibility Study(Organics Recycling) 2018-19 $50,000 C-26 SW-4941-10 Metal Shop Canopy 2018-19 $300,000 C-26 $3,258,993 STORM DRAIN Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page SD-3515-07 Mistletoe Area 2019-20 $300,000 C-27 SD-3515-08 Oregon Alley 2021-22 $250,000 C-27 SD-3515-09 Concrete Channel at Linden 2019-20 $350,000 C-27 SD-3525-08 Hollow Lane 2017-18 $444,150 C-28 SD-4044-04 Mullen Parkway Channel Improvements 2022-23 $500,000 C-28 SD-4044-05 Linden Ditch Detention 2023-24 $1,000,000 C-28 SD-4439-03 Hawthorne/Canby 2020-21 $300,000 C-29 SD-4439-04 Brock Drive 2019-20 $300,000 C-29 SD-4439-05 Crossfire and Tarmac 2020-21 $300,000 C-29 SD-4439-06 Ledell Drive 2022-23 $200,000 C-30 SD-4937-01 Master Plan Update N/A $287,910 C-30 $4,232,060 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-8 PROJECT SUMMARY STREETS Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page ST-3520-01 Small Projects Ongoing $150,000 C-31 ST-3520-01-2 Safety Projects Ongoing $4,950,000 C-31 ST-3520-01-4 Traffic Calming Ongoing $240,000 C-31 ST-3572-03 Bridge Maintenance 2018-19 $214,490 C-32 ST-3580-01 Pavement Maintenance Ongoing $16,039,142 C-32 ST-4226-01 Quartz Hill-Snow Lane to Terra Nova Lane 2017-18 $3,939,775 C-32 ST-4226-02-2 Placer Street Improvements-Airpark to Pleasant 2020-21 $1,750,000 C-32 ST-4226-08 Canby Road Widening 2018-19 $250,000 C-33 ST-4226-09 Churn Creek/RanchoNictor Roundabout 2018-19 $2,500,000 C-33 ST-4226-10 S Bonnyview 15 NB On-ramp 2017-18 $2,500,000 C-34 ST-4226-11 S Bonnyview/I-5 Interchange 2018-19 $3,800,000 C-34 ST-4407-01 Sidewalk Replacement Ongoing $968,800 C-34 ST-4527-06 Safe Routes to School -Bonnyview School 2018-19 $412,590 C-35 ST-4638-15 ADA Curb Ramps Ongoing $456,200 C-35 ST-4775-01 South Redding Pedestrian Improvements 2017-18 $850,000 C-35 ST-4775-07 Hartnell Avenue Safety Improvements 2018-19 $1,636,080 C-35 ST-4775-08 Churn Creek Road 2018-19 $1,777,000 C-36 ST-4775-09 Diestelhorst to Downtown 2018-19 $2,508,992 C-36 ST-4775-10 Bechelli Lane Improvements 2021-22 $8,421,000 C-37 ST-4775-11 West Street Improvements 2019-20 $3,196,000 C-37 ST-4783-07 Girvan Road Railroad Crossing Improvements 2018-19 $7,234,500 C-37 ST-4783-08 Shasta Street Railroad Crossing Improvements 2018-19 $417,555 C-38 ST-4803-01 Airport Corridor 2017-18 $2,470,950 C-38 ST-4895-09 Downtown Streets Circulation 2018-19 $10,556,630 C-3B ST-4908-04 Old Alturas Road Bridge over Churn Creek 2018-19 $2,575,815 C-39 ST-4908-05 Sacramento Drive Bridge over Olney Creek 2018-19 $4,043,000 C-39 ST-4908-06 Eastside Road Bridge over Canyon Hollow 2019-20 $2,637,955 C-39 ST-4908-07 Girvan Road Bridge over Olney Creek 2020-21 $2,774,303 C-40 ST-4908-08 Westside Road Bridge over Canyon Hollow 2019-20 $3,035,228 C-40 ST-4908-09 Canyon Road Bridge over ACID Canal 2019-20 $2,498,690 C-40 ST-4908-10 Eastside Road Bridge over Olney Creek 2018-19 $1,853,369 C-41 ST-4908-11 Sharon Avenue Bridge over ACID 2018-19 $1,017,523 C-41 ST-4956-04 Old Oregon Trail Widening 2017-18 $1,888,300 C-41 ST-NRTBD-01 Oasis Road Specific Plan Update N/A $50,000 C-42 $99,613,887 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-9 PROJECT SUMMARY WASTEWATER Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page WW-3512-01 Infiltration and Inflow Control Ongoing $7,776,370 C-43 WW-4086-02 Westside Interceptor- Phase III 2020-21 $7,543,080 C-43 WW-4203-02 Repair/Replace Sewer Lines Ongoing $37,729,800 C-43 WW-4801-05 SWWTP Scrubber Replacement 2020-21 $750,000 C-44 WW-LS-CC-02 Hartnell Lift Station Expansion 2019-20 $141,430 C-44 WW-LS-CC-04 North Market Lift Station 2019-20 $142,550 C-44 WW-LS-CC-7-8 Cheryl Lift Station 2021-22 $190,460 C-45 WW-P-CC-01 Lake Redding Interceptor I 2020-21 $5,353,814 C-45 WW-P-CC-01-2 Lake Redding Interceptor II 2022-23 $2,400,000 C-45 WW-P-CC-02 Cumberland Drive 2019-20 $665,608 C-46 WW-P-CC-06 Canby Bypass Phase I 2017-18 $515,064 C-46 WW-P-CC-23 Loma Street Alley 2018-19 $563,060 C-46 WW-P-CC-27 Redbud/Hallmark Alley 2017-18 $1,078,785 C-47 WW-P-CC-28 Woodacre Drive 2018-19 $512,394 C-47 WW-P-CC-5 Mercury Drive 2019-20 $662,600 C-47 WW-P-CC-8-9 Sulphur Creek 2022-23 $2,931,430 C-48 WW-P-S-01 Oasis Road 2019-20 $414,290 C-48 WW-P-S-08 Patterson Court 2019-20 $264,300 C-48 $69,635,035 WATER Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page W-3020-01-02 Pump Station Improvements Ongoing $1,444,785 C-49 W-3020-04 Pump House 1 Replacement Environmental 2017-18 $1,500,000 C-49 W-4286-01 Replace Water Mains Ongoing $17,831,321 C-49 W-4338--02-03 Well Rehabilitation Ongoing $2,251,180 C-50 W-4338-04 Well Head Treatment System 2017-18 $2,873,000 C-50 W-4492-01 Foothill Water Treatment Plant Maintenance Ongoing $5,348,559 C-50 W-4600-02 Cypress Avenue Booster Pump Station 2018-19 $1,269,480 C-51 W-4606-01 Buckeye Water Treatment Plant Maintenance Ongoing $907,013 C-51 W-4792-02 Reservoir Improvements 2017-18 $575,000 C-51 W-4795-03 Hill 900 Reservoir 2021-22 $3,211,740 C-52 W-CONV-01 Beltline 20" -Oasis to Mountain Lakes 2021-22 $548,548 C-52 W-CONV-02 Oasis 20" - UPRR to Beltline 2021-22 $1,026,635 C-52 W-CONV-03 Oasis 20" -Calexico to A6-V1 2022-23 $807,862 C-53 W-CONV-04 Lake Boulevard 24" -Oasis to Northpoint 2018-19 $5,321,400 C-53 W-CONV-09 Lake Boulevard 20" -Northpoint to Masonic 2020-21 $427,552 C-53 W-CONV-10 16" Masonic to Hilltop 2021-22 $648,105 C-54 $45,992,180 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-10 FUNDING OVERVIEW BY DIVISION AIRPORTS Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $18,315 $66,550 $176,550 $13,310 $113,036 $202,125 $589,886 Federal FAA Grant $5,530,386 $8,115,150 $3,342,300 $4,116,180 $2,846,940 $4,214,100 $28,165,056 PFC $538,877 $723,850 $46,700 $401,620 $102,740 $93,400 $1,907,187 State Aviation Grant $14,985 $54,450 $144,450 $10,890 $92,484 $165,375 $482,634 Total $6,102,563 $8,960,000 $3,710,000 $4,542,000 $3,155,200 $4,675,000 $31,144,763 COMMUNITY SERVICES Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total General Fund $50,000 $0 $0 $0 $0 $0 $50,000 In-Kind $10,000 $28,890 $0 $0 $0 $0 $38,890 Local Donations $45,760 $25,000 $0 $0 $0 $0 $70,760 Park Development Fees $543,150 $878,000 $1,312,500 $1,887,500 $1,220,000 $0 $5,841,150 State Park Grant $453,250 $815,420 $0 $0 $0 $0 $1,268,670 Total $1,102,160 $1,747,310 $1,312,500 $1,887,500 $1,220,000 $0 $7,269,470 REU Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $16,277,114 $8,667,146 $8,258,000 $8,505,000 $8,760,000 $9,023,000 $59,490,260 Electric System Financing $1,100,000 $0 $0 $0 $0 $0 $1,100,000 Total $17,377,114 $8,667,146 $8,258,000 $8,505,000 $8,760,000 $9,023,000 $60,590,260 SOLID WASTE Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $1,452,993 $1,025,000 $80,000 $650,000 $0 $51,000 $3,258,993 Total $1,452,993 $1,025,000 $80,000 $650,000 $0 $51,000 $3,258,993 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-11 FUNDING OVERVIEW BY DIVISION STORM DRAIN Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $137,910 $210,000 $350,000 $490,000 $0 $1,700,000 $2,887,910 Storm Drain Rates $444,150 $130,000 $520,000 $0 $250,000 $0 $1,344,150 Total $582,060 $340,000 $870,000 $490,000 $250,000 $1,700,000 $4,232,060 STREETS Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Caltrans $450,000 $0 $0 $0 $0 $0 $450,000 Dana Drive Impact Fees $50,000 $200,000 $0 $0 $0 $0 $250,000 Federal ATP Grant $3,951,968 $1,634,024 $2,148,000 $0 $6,740,000 $0 $14,473,992 Federal CDBG Grant $81,200 $75,000 $75,000 $75,000 $75,000 $75,000 $456,200 Federal HBP Grant $2,349,802 $4,690,048 $11,824,722 $0 $0 $0 $18,864,572 Federal HSIP Grant $1,318,742 $4,761,830 $750,000 $750,000 $750,000 $750,000 $9,080,572 Federal SRTS Grant $412,590 $0 $0 $0 $0 $0 $412,590 Local Streets and Roads Fund $1,984,164 $1,609,683 $1,938,000 $1,490,000 $1,210,000 $1,390,000 $9,621,847 North Redding Traffic Benefit $0 $50,000 $0 $0 $0 $0 $50,000 District Fees REU GHG Non-motorized Tran $143,030 $0 $0 $0 $156,970 $0 $300,000 RRA $1,970,950 $0 $0 $0 $0 $0 $1,970,950 SB1 RMRA $509,808 $1,529,334 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $10,039,142 Shasta County DPW $500,000 $0 $0 $0 $0 $0 $500,000 State AHSC Grant $1,200,000 $9,356,630 $0 $0 $0 $0 $10,556,630 State CPUC Grant $1,402,055 $6,250,000 $0 $0 $0 $0 $7,652,055 State Prop 1B Grant $287,138 $295,170 $0 $0 $0 $0 $582,308 State STIP Grant $0 $400,000 $0 $0 $0 $0 $400,000 Traffic Impact Fees $4,050,982 $5,588,769 $1,142,278 $100,000 $1,011,000 $2,000,000 $13,893,029 Water Rates $60,000 $0 $0 $0 $0 $0 $60,000 Total $20,722,429 $36,440,488 $19,878,000 $4,415,000 $11,942,970 $6,215,000 $99,613,887 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-1 2 FUNDING OVERVIEW BY DIVISION WASTEWATER Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $590,000 $590,725 $897,784 $3,024,762 $256,672 $3,127,180 $8,487,123 Wastewater Rates $7,699,000 $7,761,646 $8,935,326 $13,690,255 $11,733,685 $11,328,000 $61,147,912 Total $8,289,000 $8,352,371 $9,833,110 $16,715,017 $11,990,357 $14,455,180 $69,635,035 WATER Potential Funding Sources 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Connection Fees $0 $0 $24,798 $223,101 $636,973 $415,042 $1,299,914 Water Rates $11,463,014 $8,818,606 $3,287,631 $3,851,187 $6,564,203 $10,707,625 $44,692,266 Total $11,463,014 $8,818,606 $3,312,429 $4,074,288 $7,201,176 $11,122,667 $45,992,180 Note: The above is an overview of potential funding sources for projects contained in the main term of the Capital Improvement Plan and each project is subject to Redding City Council budgetary approval. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-13 FUNDING OVERVIEW BY SOURCE AIRPORT FUND Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $18,315 $66,550 $176,550 $13,310 $113,036 $202,125 $589,886 Total $18,315 $66,550 $176,550 $13,310 $113,036 $202,125 $589,886 COUNTY Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Shasta County DPW $500,000 $0 $0 $0 $0 $0 $500,000 Total $500,000 $0 $0 $0 $0 $0 $500,000 DONATION _ Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Donations $45,760 $25,000 $0 $0 $0 $0 $70,760 Total $45,760 $25,000 $0 $0 $0 $0 $70,760 GENERAL FUND Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total General Fund $50,000 $0 $0 $0 $0 $0 $50,000 In-Kind $10,000 $28,890 $0 $0 $0 $0 $38,890 Total $60,000 $28,890 $0 $0 $0 $0 $88,890 G RANT Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal ATP Grant $3,951,968 $1,634,024 $2,148,000 $0 $6,740,000 $0 $14,473,992 Federal CDBG Grant $81,200 $75,000 $75,000 $75,000 $75,000 $75,000 $456,200 Federal FAA Grant $5,530,386 $8,115,150 $3,342,300 $4,116,180 $2,846,940 $4,214,100 $28,165,056 Federal HBP Grant $2,349,802 $4,690,048 $11,824,722 $0 $0 $0 $18,864,572 Federal HSIP Grant $1,318,742 $4,761,830 $750,000 $750,000 $750,000 $750,000 $9,080,572 Federal SRTS Grant $412,590 $0 $0 $0 $0 $0 $412,590 State AHSC Grant $1,200,000 $9,356,630 $0 $0 $0 $0 $10,556,630 State Aviation Grant $14,985 $54,450 $144,450 $10,890 $92,484 $165,375 $482,634 State CPUC Grant $1,402,055 $6,250,000 $0 $0 $0 $0 $7,652,055 State Park Grant $453,250 $815,420 $0 $0 $0 $0 $1,268,670 State Prop 1B Grant $287,138 $295,170 $0 $0 $0 $0 $582,308 State STIP Grant $0 $400,000 $0 $0 $0 $0 $400,000 Total $17,002,116 $36,447,722 $18,284,472 $4,952,070 $10,504,424 $5,204,475 $92,395,279 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 F3 1 4 FUNDING OVERVIEW BY SOURCE IMPACT FEES Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Dana Drive Impact Fees $50,000 $200,000 $0 $0 $0 $0 $250,000 North Redding Traffic Benefit District $0 $50,000 $0 $0 $0 $0 $50,000 Fees Park Development Fees $543,150 $878,000 $1,312,500 $1,887,500 $1,220,000 $0 $5,841,150 Storm Drain Connection Fees $137,910 $210,000 $350,000 $490,000 $0 $1,700,000 $2,887,910 Traffic Impact Fees $4,050,982 $5,588,769 $1,142,278 $100,000 $1,011,000 $2,000,000 $13,893,029 Wastewater Connection Fees $590,000 $590,725 $897,784 $3,024,762 $256,672 $3,127,180 $8,487,123 Water Connection Fees $0 $0 $24,798 $223,101 $636,973 $415,042 $1,299,914 Total $5,372,042 $7,517,494 $3,727,360 $5,725,363 $3,124,645 $7,242,222 $32,709,126 LOCAL STREETS AND ROADS FUND Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Streets and Roads Fund $1,984,164 $1,609,683 $1,938,000 $1,490,000 $1,210,000 $1,390,000 $9,621,847 SB1 RMRA $509,808 $1,529,334 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $10,039,142 Total $2,493,972 $3,139,017 $3,938,000 $3,490,000 $3,210,000 $3,390,000 $19,660,989 PFC Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total PFC $538,877 $723,850 $46,700 $401,620 $102,740 $93,400 $1,907,187 Total $538,877 $723,850 $46,700 $401,620 $102,740 $93,400 $1,907,187 RRA Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total RRA $1,970,950 $0 $0 $0 $0 $0 $1,970,950 Total $1,970,950 $0 $0 $0 $0 $0 $1,970,950 STATE Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Caltrans $450,000 $0 $0 $0 $0 $0 $450,000 Total $450,000 $0 $0 $0 $0 $0 $450,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-15 FUNDING OVERVIEW BY SOURCE UTILITY RATES Funding Source 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $16,277,114 $8,667,146 $8,258,000 $8,505,000 $8,760,000 $9,023,000 $59,490,260 Electric System Financing $1,100,000 $0 $0 $0 $0 $0 $1,100,000 REU GHG Non-motorized Tran $143,030 $0 $0 $0 $156,970 $0 $300,000 Solid Waste Rates/Fees $1,452,993 $1,025,000 $80,000 $650,000 $0 $51,000 $3,258,993 Storm Drain Rates $444,150 $130,000 $520,000 $0 $250,000 $0 $1,344,150 Wastewater Rates $7,699,000 $7,761,646 $8,935,326 $13,690,255 $11,733,685 $11,328,000 $61,147,912 Water Rates $11,523,014 $8,818,606 $3,287,631 $3,851,187 $6,564,203 $10,707,625 $44,752,266 Total $38,639,301 $26,402,398 $21,080,957 $26,696,442 $27,464,858 $31,109,625$171,393,581 Total $67,091,333 $74,350,921 $47,254,039 $41,278,805 $44,519,703 $47,241,847$321,736,648 Note: The above is an overview of potential funding sources for projects contained in the main term of the Capital Improvement Plan and each project is subject to Redding City Council budgetary approval. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 B-16 SECTION C DETAILED PROGRAM SUMMARIES AIRPORTS Rehab Parallel Taxiway B Project# A-BEN-18-1 Description: The west side taxiway at Benton Airpark is in need of rehabilitation. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $50,335 Project Type: One-time Benton Airpark CIP Costs(detailed below) $883,000 Total Project Cost: $933,335 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $1,815 $46,750 $0 $0 $0 $0 $48,565 Federal FAA Grant $29,700 $765,000 $0 $0 $0 $0 $794,700 State Aviation Grant $1,485 $38,250 $0 $0 $0 $0 $39,735 Total $33,000 $850,000 $0 $0 $0 $0 $883,000 Project Development $33,000 $0 $0 $0 $0 $0 $33,000 Construction $0 $850,000 $0 $0 $0 $0 $850,000 Total $33,000 $850,000 $0 $0 $0 $0 $883,000 Construct Perimeter Road Project# A-BEN-18-2 Description: Construction of perimeter road to avoid ground vehicles, including heavy fueling trucks, driving on the Parallel Taxiway B. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $16,500 $0 $0 $0 $0 $0 $16,500 Federal FAA Grant $270,000 $0 $0 $0 $0 $0 $270,000 State Aviation Grant $13,500 $0 $0 $0 $0 $0 $13,500 Total $300,000 $0 $0 $0 $0 $0 $300,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $300,000 $0 $0 $0 $0 $0 $300,000 Total $300,000 $0 $0 $0 $0 $0 $300,000 Eastside T-Hangar Taxilane Reconstruction Project# A-BEN-20-1 Description: This project includes the reconstruction of 16,000 square yards of taxilanes on the eastside of Benton Airpark. These taxilanes are needed to access City-owned t-hangars. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $2,940,000 Total Project Cost: $2,940,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $0 $16,500 $145,200 $0 $0 $0 $161,700 Federal FAA Grant $0 $270,000 $2,376,000 $0 $0 $0 $2,646,000 State Aviation Grant $0 $13,500 $118,800 $0 $0 $0 $132,300 Total $0 $300,000 $2,640,000 $0 $0 $0 $2,940,000 Project Development $0 $300,000 $0 $0 $0 $0 $300,000 Construction $0 $0 $2,640,000 $0 $0 $0 $2,640,000 Total $0 $300,000 $2,640,000 $0 $0 $0 $2,940,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-1 AIRPORTS Runway Pavement Preservation Project# A-BEN-20-2 Description: Slurry seal to seal and maintain runway and replace runway markings. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $630,000 Total Project Cost: $630,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $0 $3,300 $31,350 $0 $0 $0 $34,650 Federal FAA Grant $0 $54,000 $513,000 $0 $0 $0 $567,000 State Aviation Grant $0 $2,700 $25,650 $0 $0 $0 $28,350 Total $0 $60,000 $570,000 $0 $0 $0 $630,000 Project Development $0 $60,000 $0 $0 $0 $0 $60,000 Construction $0 $0 $570,000 $0 $0 $0 $570,000 Total $0 $60,000 $570,000 $0 $0 $0 $630,000 Northeast Apron and Taxilanes Reconstruction Project# A-BEN-22-1 Description: To replace pavement rated as poor by the Airport Pavement Management Plan. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $1,942,000 Total Project Cost: $1,942,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $0 $0 $0 $13,310 $93,500 $0 $106,810 Federal FAA Grant $0 $0 $0 $217,800 $1,530,000 $0 $1,747,800 State Aviation Grant $0 $0 $0 $10,890 $76,500 $0 $87,390 Total $0 $0 $0 $242,000 $1,700,000 $0 $1,942,000 Project Development $0 $0 $0 $242,000 $0 $0 $242,000 Construction $0 $0 $0 $0 $1,700,000 $0 $1,700,000 Total $0 $0 $0 $242,000 $1,700,000 $0 $1,942,000 Rehab Parallel Taxiway A Project# A-BEN-23-1 Description: The eastside taxiway at Benton Airpark is in need of rehabilitation. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $530,200 Total Project Cost: $530,200 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $0 $0 $0 $0 $3,036 $26,125 $29,161 Federal FAA Grant $0 $0 $0 $0 $49,680 $427,500 $477,180 State Aviation Grant $0 $0 $0 $0 $2,484 $21,375 $23,859 Total $0 $0 $0 $0 $55,200 $475,000 $530,200 Project Development $0 $0 $0 $0 $55,200 $0 $55,200 Construction $0 $0 $0 $0 $0 $475,000 $475,000 Total $0 $0 $0 $0 $55,200 $475,000 $530,200 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-2 AIRPORTS Westside T-Hanger Taxilane Reconstruction Project# A-BEN-23-2 Description: To replace pavement rated as poor by the Airport Pavement Management Plan. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $3,500,000 Total Project Cost: $3,500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Airport Fund $0 $0 $0 $0 $16,500 $176,000 $192,500 Federal FAA Grant $0 $0 $0 $0 $270,000 $2,880,000 $3,150,000 State Aviation Grant $0 $0 $0 $0 $13,500 $144,000 $157,500 Total $0 $0 $0 $0 $300,000 $3,200,000 $3,500,000 Project Development $0 $0 $0 $0 $300,000 $0 $300,000 Construction $0 $0 $0 $0 $0 $3,200,000 $3,200,000 Total $0 $0 $0 $0 $300,000 $3,200,000 $3,500,000 T-Hangar Taxilane Reconstruction Project# A-MUN-16-2 Description: Reconstruct 52,850 square yards of taxilanes that run between the aircraft storage T-hangars. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $324,877 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $4,254,563 Total Project Cost: $4,579,440 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $3,857,187 $0 $0 $0 $0 $0 $3,857,187 PFC $397,376 $0 $0 $0 $0 $0 $397,376 Total $4,254,563 $0 $0 $0 $0 $0 $4,254,563 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $4,254,563 $0 $0 $0 $0 $0 $4,254,563 Total $4,254,563 $0 $0 $0 $0 $0 $4,254,563 New PAPI for Runway 30 Protect# A-MUN-18-7 Description: To replace a 25-year-old two-light PAPI with a new four-light PAPI. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $90,000 Total Project Cost: $90,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $81,594 $0 $0 $0 $0 $0 $81,594 PFC $8,406 $0 $0 $0 $0 $0 $8,406 Total $90,000 $0 $0 $0 $0 $0 $90,000 Project Development $9,000 $0 $0 $0 $0 $0 $9,000 Construction $81,000 $0 $0 $0 $0 $0 $81,000 Total $90,000 $0 $0 $0 $0 $0 $90,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C3 AIRPORTS Reconstruct Runway 16 Blast Pad, MAGVAR, and Taxiway H Project# A-MUN-19-1 Description: To replace failing pavement and to rehabilitate Runway 16-34. To include remarking runway number with 17-35 for magnetic variation. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $4,460,000 Total Project Cost: $4,460,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $398,904 $3,644,532 $0 $0 $0 $0 $4,043,436 PFC $41,096 $375,468 $0 $0 $0 $0 $416,564 Total $440,000 $4,020,000 $0 $0 $0 $0 $4,460,000 Project Development $440,000 $0 $0 $0 $0 $0 $440,000 Construction $0 $4,020,000 $0 $0 $0 $0 $4,020,000 Total $440,000 $4,020,000 $0 $0 $0 $0 $4,460,000 Reconstruct TermInal/Airport Loop Access Road Project# A MUN-19-2 Description: To replace failed pavement on Woodrum Circle, airport entrance to Airport Road, Municipal Boulevard, Flight Avenue, and road to FedEx and Civil Air Patrol. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $4,215,000 Total Project Cost: $4,215,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $439,701 $3,381,618 $0 $0 $0 $0 $3,821,319 PFC $45,299 $348,382 $0 $0 $0 $0 $393,681 Total $485,000 $3,730,000 $0 $0 $0 $0 $4,215,000 Project Development $485,000 $0 $0 $0 $0 $0 $485,000 Construction $0 $3,730,000 $0 $0 $0 $0 $3,730,000 Total $485,000 $3,730,000 $0 $0 $0 $0 $4,215,000 Parallel Runway Project# A-MUN-21-1 Description: Project development for construction of a 4000'x 100'general aviation runway needed to assist with increased demand to the main primary runway. The parallel runway would permit smaller general aviation aircraft and flight training activities to operate without impacting the flights from critical operators,such as scheduled passenger and cargo aircraft, passenger charters,aerial firefighting and air medical. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $5,300,000 Total Project Cost: $5,300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $453,300 $0 $453,300 $3,898,380 $0 $0 $4,804,980 PFC $46,700 $0 $46,700 $401,620 $0 $0 $495,020 Total $500,000 $0 $500,000 $4,300,000 $0 $0 $5,300,000 Project Development $500,000 $0 $500,000 $0 $0 $0 $1,000,000 Construction $0 $0 $0 $4,300,000 $0 $0 $4,300,000 Total $500,000 $0 $500,000 $4,300,000 $0 $0 $5,300,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C 4 AIRPORTS Pavement Preservation - Aprons and Taxiways Project# A-MUN-22-3 Description: Slurry seal to seal and maintain pavement Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $1,000,000 Total Project Cost: $1,000,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $0 $0 $0 $0 $906,600 $0 $906,600 PFC $0 $0 $0 $0 $93,400 $0 $93,400 Total $0 $0 $0 $0 $1,000,000 $0 $1,000,000 Project Development $0 $0 $0 $0 $100,000 $0 $100,000 Construction $0 $0 $0 $0 $900,000 $0 $900,000 Total $0 $0 $0 $0 $1,000,000 $0 $1,000,000 All Weathe - oject# A-MUN-23-6 Description: To elevate and pave the existing perimeter road to allow full access in all seasons. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $1,100,000 Total Project Cost: $1,100,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal FAA Grant $0 $0 $0 $0 $90,660 $906,600 $997,260 PFC $0 $0 $0 $0 $9,340 $93,400 $102,740 Total $0 $0 $0 $0 $100,000 $1,000,000 $1,100,000 Project Development $0 $0 $0 $0 $100,000 $0 $100,000 Construction $0 $0 $0 $0 $0 $1,000,000 $1,000,000 Total $0 $0 $0 $0 $100,000 $1,000,000 $1,100,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-5 COMMUNITY SERVICES Westridge Park Development Project # CS-2005-17 Description: Design and first phase construction of an approximately 13-acre park site in the SW quadrant that will include playing fields, playgrounds, basketball courts, shaded picnic areas,trail connections to adjacent public open-space areas, parking, and restrooms. Planned to be constructed under a development agreement. Location: SW Quadrant, off Placer Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $1,750,000 Total Project Cost: $1,750,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Park Development Fees $0 $0 $262,500 $987,500 $500,000 $0 $1,750,000 Total $0 $0 $262,500 $987,500 $500,000 $0 $1,750,000 Project Development $0 $0 $262,500 $0 $0 $0 $262,500 Construction $0 $0 $0 $987,500 $500,000 $0 $1,487,500 Total $0 $0 $262,500 $987,500 $500,000 $0 $1,750,000 Shastina Ranch Park Development Project# CS-2005-21 Description: Construction on an approximately 7-acre park site on dedicated land in the SE quadrant located in a soon-to-be developed subdivision. The project will include a multi-purpose playing field, playgrounds,shaded picnic areas,and trail connections to adjacent public open-space areas. Planned to be constructed under a development agreement. Location: SE Quadrant, Rancho Road/Shasta View Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $1,720,000 Total Project Cost: $1,720,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Park Development Fees $100,000 $300,000 $500,000 $500,000 $320,000 $0 $1,720,000 Total $100,000 $300,000 $500,000 $500,000 $320,000 $0 $1,720,000 Project Development $100,000 $0 $0 $0 $0 $0 $100,000 Construction $0 $300,000 $500,000 $500,000 $320,000 $0 $1,620,000 Total $100,000 $300,000 $500,000 $500,000 $320,000 $0 $1,720,000 Bel-Air Park Development Project# CS-2005-23 Description: First phase construction of an approximately 7.3-acre park site on dedicated land in the NW quadrant in a subdivision now under construction. This project will include play equipment, open turf areas,shaded picnic tables, and trails. Planned to be constructed under a development agreement. Location: NW Quadrant Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Park Development Fees $0 $250,000 $250,000 $0 $0 $0 $500,000 Total $0 $250,000 $250,000 $0 $0 $0 $500,000 Project Development $0 $75,000 $0 $0 $0 $0 $75.000 Construction $0 $175,000 $250,000 $0 $0 $0 $425,000 Total $0 $250,000 $250,000 $0 $0 $0 $500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-6 COMMUNITY SERVICES Highland Park Development Plk Description: Construction of an approximately 6-acre park site on dedicated land in the NE quadrant located in a subdivision now under construction. This project will include play equipment, open turf areas,shaded picnic tables, and trails. Planned to be constructed under a development agreement. Location: NE Quadrant, near Hilltop Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $330,000 Total Project Cost: $330,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Park Development Fees $330,000 $0 $0 $0 $0 $0 $330,000 Total $330,000 $0 $0 $0 $0 $0 $330,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $330,000 $0 $0 $0 $0 $0 $330,000 Total $330,000 $0 $0 $0 $0 $0 $330,000 Salt Creek Heights Park Project# CS-2011-01 Description: Design and construction of an approximately 8-acre park site on dedicated land in the SE quadrant located in a soon- to-be-developed subdivision.The project will include a multi-purpose playing field, playgrounds, shaded picnic areas, trail connections, and a restroom. Planned to be constructed under a development agreement. Location: SW Quadrant, off Eureka Way Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $1,400,000 Total Project Cost: $1,400,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Park Development Fees $0 $300,000 $300,000 $400,000 $400,000 $0 $1,400,000 Total $0 $300,000 $300,000 $400,000 $400,000 $0 $1,400,000 Project Development $0 $135,000 $0 $0 $0 $0 $135,000 Construction $0 $165,000 $300,000 $400,000 $400,000 $0 $1,265,000 Total $0 $300,000 $300,000 $400,000 $400,000 $0 $1,400,000 Henderson Open Space Project# CS-2015-01 Description: Grant funded project for kayak launch improvements,trail construction and restoration of native plants and parking lot. Location: SE Quadrant Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $626,840 Total Project Cost: $626,840 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Donations $25,000 $25,000 $0 $0 $0 $0 $50,000 State Park Grant $275,000 $301,840 $0 $0 $0 $0 $576,840 Total $300,000 $326,840 $0 $0 $0 $0 $626,840 Project Development $25,000 $0 $0 $0 $0 $0 $25,000 Construction $275,000 $326,840 $0 $0 $0 $0 $601,840 Total $300,000 $326,840 $0 $0 $0 $0 $626,840 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-/ COMMUNITY SERVICES 7 Redding Riffle Project# CS-2017-01 Description: Create and restore native habitat for the restoration and enhancement of approximately 25 acres of riparian forest adjacent to the Redding Riffle. Project includes removal of invasive plants; replant with native plants; removal of 20,000 sq. ft. of an impervious asphalt driveway and parking area and relocate; replace parking lot and driveway with pervious surfacing; and installation of a bio-swale adjacent to the new pervious surfacing to aid in absorbing runoff. Location: NW Quadrant, near Auditorium Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $630,470 Total Project Cost: $630,470 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total In-Kind $10,000 $28,890 $0 $0 $0 $0 $38,890 Park Development Fees $0 $28,000 $0 $0 $0 $0 $28,000 State Park Grant $50,000 $513,580 $0 $0 $0 $0 $563,580 Total $60,000 $570,470 $0 $0 $0 $0 $630,470 Project Development $50,000 $90,500 $0 $0 $0 $0 $140,500 Construction $10,000 $479,970 $0 $0 $0 $0 $489,970 Total $60,000 $570,470 $0 $0 $0 $0 $630,470 Magnolia Park Acquisition Project# CS-2017-02 Description: Acquisition of park from Shasta County Office of Education and improvement to the existing basketball court. Location: SW Quadrant, off Placer Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $241,400 Total Project Cost: $241,400 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Park Development Fees $113,150 $0 $0 $0 $0 $0 $113,150 State Park Grant $40,000 $0 $0 $0 $0 $0 $40,000 State Park Grant $88,250 $0 $0 $0 $0 $0 $88,250 Total $241,400 $0 $0 $0 $0 $0 $241,400 Project Development $175,000 $0 $0 $0 $0 $0 $175,000 Construction $66,400 $0 $0 $0 $0 $0 $66,400 Total $241,400 $0 $0 $0 $0 $0 $241,400 Rolling Hill Park Project # CS-2017-03 Description: Installation of playground equipment in an existing neighborhood park. Location: SW Quadrant, near Placer Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $15,760 Total Project Cost: $15,760 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total General Fund $7,500 $0 $0 $0 $0 $0 $7,500 Local Donations $8,260 $0 $0 $0 $0 $0 $8,260 Total $15,760 $0 $0 $0 $0 $0 $15,760 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $15,760 $0 $0 $0 $0 $0 $15,760 Total $15,760 $0 $0 $0 $0 $0 $15,760 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C 8 COMMUNITY SERVICES , Country Heights Park Project# CS-2017-04 Description: Playground equipment replacement at neighborhood park. Location: SW Quadrant, near Buenaventura Blvd. Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $40,000 Total Project Cost $40,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total General Fund $40,000 $0 $0 $0 $0 $0 $40,000 Total $40,000 $0 $0 $0 $0 $0 $40,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $40,000 $0 $0 $0 $0 $0 $40,000 Total $40,000 $0 $0 $0 $0 $0 $40,000 East Oaks Park Project# CS-2017-05 Description: Playground equipment replacement at neighborhood park. Location: SE Quadrant, near Churn Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $15,000 Total Project Cost: $15,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total General Fund $2,500 $0 $0 $0 $0 $0 $2,500 Local Donations $12,500 $0 $0 $0 $0 $0 $12,500 Total $15,000 $0 $0 $0 $0 $0 $15,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $15,000 $0 $0 $0 $0 $0 $15,000 Total $15,000 $0 $0 $0 $0 $0 $15,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-9 REU Electric Utility GIS Mapping (GIS Conversion) Project# REU-2007-03 Description: This project began in FY 2007-2008 to convert REU's existing linear based drawing data into an information-based system. The advantages to manipulate data along with graphical information is well established and allows greater productivity within the department and the ability to tie to the City's existing GIS system. The project involves acquiring necessary data platforms, the conversion of the existing data into GIS. and the conversion of REU's linear based drawing data into an information-based system. Location: Citywide Project Cost: Prior Years/Future Costs: $720,739 Project Type: One-time System Improvements CIP Costs(detailed below) $689,500 Total Project Cost: $1,410,239 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $344,750 $344,750 $0 $0 $0 $0 $689,500 Total $344,750 $344,750 $0 $0 $0 $0 $689,500 i General Generator Upgrade Project# REU-2009-04 Description: This project is for plant automation improvements that will enhance safety, improve plant operability,and improve plant reliability at the Redding Power Plant. These improvements include the addition of valve actuators, advanced controller programming, and operator interface equipment. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $16,140 $0 $0 $0 $0 $0 $16,140 Total $16,140 $0 $0 $0 $0 $0 $16,140 Corporation Yard Expansion Project# REU-2011-02 Description: Required to construct a distribution dispatch center for both organizational efficiencies and as mandated by FERC and NERC regulatory requirements. Location: 20055 Viking Way Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Expansion CIP Costs(detailed below) $1,100,000 Total Project Cost: $1,100,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric System Financing $1,100,000 $0 $0 $0 $0 $0 $1,100,000 Total $1,100,000 $0 $0 $0 $0 $0 $1,100,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-10 REU Asphalt Paving (Plant Resurfacing) Project# REU-2011-07 Description: Adding concrete or asphalt surfaces to areas of the plant enhances plant safety,cleanliness,and ease of operation. The safety improvement is gained by giving plant staff a better work surface for moving heavy objects. The engines will also benefit because the resurfacing will suppress dust and prevent engine fouling. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $100,000 Total Project Cost: $100,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $100,000 $0 $0 $0 $0 $0 $100,000 Total $100,000 $0 $0 $0 $0 $0 $100,000 CT Gas Leak Detection System Project# REU-2013-03 Description: For safety of personnel and protection of equipment, gas leak equipment needs to be installed on each of the CT's. This project is a result of an OEM product service bulletin requiring the addition of natural gas detectors in the CT package. The detectors are to determine if a fuel gas leak exists. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $90,000 Total Project Cost: $90,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $90,000 $0 $0 $0 $0 $0 $90,000 Total $90,000 $0 $0 $0 $0 $0 $90,000 CT Unit#1 AVR Upgrade -v,., n-oject# REU-2013-06 Description: Replacement of obsolete Automatic Voltage Control equipment. The project is scheduled to be performed in conjunction with the control system replacement for Combustion Turbine unit#1. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $128,000 Total Project Cost: $128,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $89,600 $38,400 $0 $0 $0 $0 $128,000 Total $89,600 $38,400 $0 $0 $0 $0 $128,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-1 1 REU Power Plant Generator Paint Project # REU-2015-02 Description: The paint on the peaking units (Units 1, 2, and 3) is the original paint. It is severely weathered and has been damaged over the years due to hot gas leaks. Repainting the units will not only restore the professional visual appearance but it will give plant staff a tool to see indications of potential insulation breakdown. The paint on Units 4 and 5 is severely weathered and has some damage due to hot gas leaks. Repainting the units will not only restore the professional visual appearance but it will give plant staff a tool to see indications of potential insulation breakdown. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $2,511 Project Type: One-time System Improvements CIP Costs(detailed below) $197,480 Total Project Cost: $199,991 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $138,240 $59,240 $0 $0 $0 $0 $197,480 Total $138,240 $59,240 $0 $0 $0 $0 $197,480 Unit 5 Automation Upgrade Project# REU-2015-04 Description: This project is to improve plant automation to improve the operability of Unit 5. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $60,000 Total Project Cost: $60,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $60,000 $0 $0 $0 $0 $0 $60,000 Total $60,000 $0 $0 $0 $0 $0 $60,000 Vibration Monitor for Unit 9 Project# REU-2015-05 Description: This project will add machine vibration monitoring instrumentation to the Unit 9 turbine and generator. This equipment will report data used to evaluate the machine health. Location: Paige Bar Road at Whiskeytown Dam Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $40,000 Total Project Cost: $40,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $40,000 $0 $0 $0 $0 $40,000 Total $0 $40,000 $0 $0 $0 $0 $40,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-1 2 REU Upstream NOx Analyzers Project# REU-2015-07 Description: Currently the peaking plant generators do not have instrumentation to measure the air pollutant NOx prior to the emissions catalyst. This measurement is very helpful in monitoring combustion efficiency and emissions catalyst efficiency. Being able to monitor this measurement is important so problems with the engine or the catalyst can possibly be caught early and avoid unit derates and potential regulatory violations. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $48,271 Project Type: One-time System Improvements CIP Costs(detailed below) $5,720 Total Project Cost: $53,991 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $5,720 $0 $0 $0 $0 $0 $5,720 Total $5,720 $0 $0 $0 $0 $0 $5,720 General Plant Automation Project# REU-2015-10 Description: As technology progresses there are opportunities to improve the operability of the power plant. This project is to improve plant automation throughout the power plant site. These improvements are damper actuators,valve automation, process instrumentation, process piping, and plant equipment. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $87,006 Project Type: One-time System Improvements CIP Costs(detailed below) $196,890 Total Project Cost: $283,896 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $118,134 $78,756 $0 $0 $0 $0 $196,890 Total $118,134 $78,756 $0 $0 $0 $0 $196,890 Electrical Equipment Improvement Project# REU-2015-12 Description: The arc flash analysis of the power plant equipment has revealed a few areas where the incident energy levels are very high. They are high enough to where there is no level of safety protection that will allow the area to be worked on while energized. Although it is much preferred to work on all equipment while de-energized,sometimes events will not make this possible. This project will modify these areas to reduce the incident energy to levels that could allow work to be performed while energized. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $125,000 Total Project Cost: $125,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $125,000 $0 $0 $0 $0 $0 $125,000 Total $125,000 $0 $0 $0 $0 $0 $125,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-1 3 REU . Gas Chromatograph Pro Description: This project will procure and install a new gas chromatograph on the natural gas pipeline that will continuously report fuelgas heating value. This value will be used in the plant CEMs and for greenhouse gas emissions data. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $42,986 Project Type: One-time System Improvements CIP Costs(detailed below) $17,000 Total Project Cost: $59,986 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $17,000 $0 $0 $0 $0 $0 $17,000 Total $17,000 $0 $0 $0 $0 $0 $17,000 Unit 1 Fast Start Upgrade Project # REU-2015-16 Description: Unit 1 is the only peaking unit that does not have fast start capability. By completing a fluegas flow study and installing the needed instrumentation this unit could also have fast start abilities. This would give system operations additional fast start resources.They would have a lesser load capable machine to select in the event of an energy emergency. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $60,000 Total Project Cost: $60,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $60,000 $0 $0 $0 $0 $0 $60,000 Total $60,000 $0 $0 $0 $0 $0 $60,000 Description: This project will upgrade the protective relay equipment on Unit 3&Unit 4. These units utilize electromechanical relays for the units protective relays. This equipment is older and requires more frequent maintenance as per PRC- 005-2. By upgrading this equipment to a digital system it will require less maintenance. A digital system will also provide better event logging which will help the utility to diagnose problems in the event of a protective relay operation. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $180,000 Total Project Cost: $180,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $126,000 $54,000 $0 $0 $0 $0 $180,000 Total $126,000 $54,000 $0 $0 $0 $0 $180,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-14 REU Unit 4 Delta V Upgrade 11.11111.111.1 Description: The Unit 4 control system, Delta V version 7, is obsolete and is no longer supported by Fisher Rosemont. This project will replace this system with a modern Siemens T3000 system and incorporate it into the plant control loop. The T3000 system is the system the power plant has standardized to. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $597,509 Project Type: One-time System Improvements CIP Costs(detailed below) $21,470 Total Project Cost: $618,979 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $21,470 $0 $0 $0 $0 $0 $21,470 Total $21,470 $0 $0 $0 $0 $0 $21,470 Remittance Equipment Replacement Project# REU-2015-22 Description: The serviceable life of the remittance equipment was estimated at 8 years from the time of purchase in 2005. This equipment includes the Remittance Processing System (RPS), Opex letter opener and crosscut shredder. It is used daily to process the approximately 220,000 utility payments received annually via the mail room. Due to the age and daily use of the equipment, it has become increasingly unreliable. In order to control costs and to sustain system reliability for the Division, it is recommended the remittance equipment be replaced. Location: 3611 Avtech Parkway Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $205,000 Total Project Cost: $205,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $205,000 $0 $0 $0 $0 $0 $205,000 Total $205,000 $0 $0 $0 $0 $0 $205,000 Customer Self-Service Suite Project# REU-2015-23 Description: In order to leverage new technology available and the enhanced capabilities of the upgraded utility billing system, it is requested that a customer Self Service Suite be developed. A Self Service Suite would allow utility customers, through a computer portal,to request services, make payment arrangements,obtain detailed account information,or conduct other transactions. This portal would also allow the City to explore paperless bill options, recurring payments or other customer payment options. A Self Service Suite would provide customer immediate,24-hour, access to information and would no longer require contact with a Customer Service Representative via the Call Center or Walk- In Center. Location: 3611 Avtech Parkway Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $500,000 $0 $0 $0 $0 $0 $500,000 Total $500,000 $0 $0 $0 $0 $0 $500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-18 TO 2022-23 C-1 5 REU General System Improvel, its Project# REU-201111111 Description: General system improvements are annual recurring distribution system capital expenditures in support of both new business and system maintenance for both new and existing customers. The facilities to be installed typically include: transformers,capacitor banks, poles,overhead and underground conductors and switches,splices/connectors, conduit,and splice boxes and vaults. Location: Citywide Project Type: Ongoing System Improvements Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $7,407,080 $5,000,000 $5,150,000 $5,304,000 $5,463,000 $5,627,000 $33,951,080 Total $7,407,080 $5,000,000 $5,150,000 $5,304,000 $5,463,000 $5,627,000 $33,951,080 Catal st Re•lacement Units 5&6 Pro'ect# REU-2017-02 Description: Catalyst Replacement for Units 5&6 Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $331,500 Project Type: One-time System Improvements CIP Costs(detailed below) $1,659,980 Total Project Cost: $1,991,480 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $1,659,980 $0 $0 $0 $0 $0 $1,659,980 Total $1,659,980 $0 $0 $0 $0 $0 $1,659,980 Redding Power Battery Monitoring Sty : Project# REU-2017-03 Description: This project supports the increase in battery reliability and improved compliance to NERC standards by adding continuous battery monitors to each DC battery system to eliminate most of the battery testing required by NERC PRC-005. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $100,000 Total Project Cost: $100,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $100,000 $0 $0 $0 $0 $0 $100,000 Total $100,000 $0 $0 $0 $0 $0 $100,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-16 REU Unit 4 Station Service Battery Replacement Project# Rfillia Description: This project supports the reduction of REU risk by increasing the Unit 4 reliability by replacing the Unit 4 batteries that are currently showing signs of degradation. The battery capacities are satisfactory but physical indications show the batteries are degrading. Some of the battery posts have lifted slightly from the battery casing. The battery charges for this system are in need of component servicing but are no longer manufactured and supported. This project will replace the battery chargers for this system. This system also provides 125 DC backup power to the Unit 5 generator protection system. This connection will be improved so as to incorporate additional uninterrupted power supply to other Unit 5 equipment such as the DCS and boiler drum level instrumentation. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $110,000 Total Project Cost: $110,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $110,000 $0 $0 $0 $0 $0 $110,000 Total $110,000 $0 $0 $0 $0 $0 $110,000 Unit 5 Station Service Battery Replacement Project # REU-2017-05 Description: This project supports the reduction of REU risk by increasing the Unit 5 reliability by replacing the Unit 5 batteries that are currently at the OEM recommended end of 15 year life. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $87,000 Total Project Cost: $87,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $87,000 $0 $0 $0 $0 $0 $87,000 Total $87,000 $0 $0 $0 $0 $0 $87,000 Unit 5 Station Service Battery Storage Building Project# REU-2017-06 Description: This project supports the reduction of REU risk by removing a safety hazard through creating a new location and method of storing the batteries. The existing battery storage area has hazardous working conditions when performing reliability testing on the batteries. They are covered by an aluminum floor that is very awkward to remove. An added hazard accompanies this removal as the conductive floor material is removed,the batteries supply an uninterruptable power source to be avoided during the removal process. The batteries are approximately 12" below the floor that makes them difficult to work on as the technician is working below their sitting position. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $244,000 Total Project Cost: $244,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $244,000 $0 $0 $0 $0 $0 $244,000 Total $244,000 $0 $0 $0 $0 $0 $244,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C 1 7 REU Upgrade Plant Safety Showers Project# REU-2017-07 Description: OSHA has recently revised the regulations concerning safety showers in industrial facilities. The updated regulation requires controls that regulate the temperature of the water used in the showers. This is to prevent the water from freezing and restricting flow and to prevent water from being excessively hot and causing burns. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $50,000 Total Project Cost: $50,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $50,000 $0 $0 $0 $0 $0 $50,000 Total $50,000 $0 $0 $0 $0 $0 $50,000 Unit 9 Plant Controls Upgrade - ill Description: This project replace the GE Fanuc series 690 controls at Unit 9. The controls will be Siemens T3000 platform. The new system will be integrated into the Redding Power control and allow control and oversite of the Unit 9 facility at Redding Power. The existing GE control system is no longer produced by GE making spare parts more difficult to obtain. Location: Whiskeytown Dam Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $350,000 Total Project Cost: $350,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $350,000 $0 $0 $0 $0 $350,000 Total $0 $350,000 $0 $0 $0 $0 $350,000 Convert Peaking Generator Emissions Catalyst to Urea Project# REU-2017-09 Description: This project will use urea instead of ammonia in the peaking generator SCR catalyst. Ammonia is a very hazardous chemical. It requires extensive measures to maintain the systems and to protect plant personnel. Urea is a much safer material to use. It is just as effective as ammonia therefore there will be no changes in plant emissions and unit production. The cost of urea is slightly less than that of ammonia but the financial payback of this retrofit is negligible. The main benefit to this project is the ability to remove a very hazardous chemical from the plant site. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $80,000 Total Project Cost: $80,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $80,000 $0 $0 $0 $0 $0 $80,000 Total $80,000 $0 $0 $0 $0 $0 $80,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-1 8 REU Unit 2 Generator Protective Relays Upgrade PMIIMIIIIIIMII Description: This project will replace the GE electromechanical generator protection relays with a modern digital generator protection system. The current GE relays are no longer manufactured,thus making spare parts difficult to obtain. The new digital relays increase the required maintenance intervals from 6 years to 12 years. The new equipment provides valuable plant data for diagnosing system problems and events. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $90,000 Total Project Cost: $90,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $90,000 $0 $0 $0 $0 $90,000 Total $0 $90,000 $0 $0 $0 $0 $90,000 Substation Re-Roofing Project Project# REU-2017-11 Description: Roofs at various substations are at end of life span. Replacement with new technology is a better use of funds than continued patching. Location: Multiple Substations Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $39,000 Total Project Cost: $39,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $39,000 $0 $0 $0 $0 $39,000 Total $0 $39,000 $0 $0 $0 $0 $39,000 Oregon Substation Modernization Project# REU-2017-12 Description: The controls for this substation are part of a System wide substation control modernization project to improve communications to all substations as well as remove known obsolescence. The controls replacement will replace SCADA equipment manufactured by C3-Ilex which is unsupported and control panels that utilize obsolete mechanical protective relays that are in-accurate and require frequent maintenance and testing for NERC Compliance. Their replacement will provide$10K/year min savings by reduced testing requirements. The new devices will also provide disturbance recording as required by NERC. The upgrade will also provide increased physical security and access control in a neighborhood that has increased vagrancy and the Ground Grid corrosion issues will be repaired and tested. In addition,the two under-rated Circuit Switchers will be brought up to REU standards,the two 115KV Circuit Breakers will be replaced to achieve future EPA standards for SF-6 leakage rates,and the two aging transformers will be completely refurbished and the PCB contaminated oil replaced. Location: 1205/1235 Oregon Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $3,500,000 Total Project Cost: $3,500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $1,100,000 $2,400,000 $0 $0 $0 $0 $3,500,000 Total $1,100,000 $2,400,000 $0 $0 $0 $0 $3,500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-1 9 REU Description: Purchase and install next generation firewalls at power control center and Avtech to segment the operational network data from business data. This solution provides end user computer malware,virus, ransomware protection and protection for threats from internal introduction such as flash/thumb drives. Location: 17120 Clear Creek Road/3611 Avtech Parkway Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $120,000 Total Project Cost: $120,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $120,000 $0 $0 $0 $0 $0 $120,000 Total $120,000 $0 $0 $0 $0 $0 $120,000 Description: Several Substations experience daily communications outages which impact Power Controls'ability to monitor and control electricity delivery. College View Sub has experienced up to 30 communications outages per day and the remaining sites experience between 10-20 outages per day when the deciduous trees are foliated and summer time temperatures are high. Sulphur Creek Sub requires communications bandwidth to support SCADA,business communications and security camera traffic. The new Sulphur Creek Sub radio link will provide 20 Mbps of bandwidth Vs.the 1.5 Mbps bandwidth provided by the Ti. This project purchases and installs new 107 foot direct burial poles, radios,and antennas at the Oregon,Waldon,Sulphur Creek,and College View Substations to replace the existing least circuits and improve radio path reliability.The poles will provide radio paths with sufficient clearance to ensure reliable communications. The poles can also act as a takeout point for radio frequency based advanced meter infrastructure. Location: Multiple Substations Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $123,000 Total Project Cost: $123,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $123,000 $0 $0 $0 $0 $0 $123,000 Total $123,000 $0 $0 $0 $0 $0 $123,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-20 REU Redding Power Substation Controls Modernization Project# REU-2017-15 Description: The controls for this substation are part of a System wide substation control modernization project to improve communications to all substations as well as remove known obsolescence. The controls replacement will replace SCADA equipment manufactured by C3-Ilex which is unsupported and control panels that utilize obsolete mechanical protective relays that are in-accurate and require frequent maintenance and testing for NERC Compliance. Their replacement will provide$15K/year min savings by reduced testing requirements. The new devices will also provide disturbance recording as required by NERC. In addition,the instrumentation transducers will be replaced from analog based to digital based recorders greatly increasing the accuracy and flexibility of the instrumentation. Location: Multiple Substations Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $138,000 Total Project Cost: $138,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $138,000 $0 $0 $0 $0 $138,000 Total $0 $138,000 $0 $0 $0 $0 $138,000 Substation Network Upgrades Project # REU-2017-16 Description: To annually lifecycle operational computers and network equipment as equipment becomes unsupportable or obsolete- Example—5 substations currently need upgrades to Subnet Solutions computers running Windows XP to eliminate the security risks associated with a non-support operating system. Location: Multiple Substations Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $35,000 Total Project Cost: $35,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $35,000 $0 $0 $0 $0 $35,000 Total $0 $35,000 $0 $0 $0 $0 $35,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-2 1 REU Weldon Substation Modernization Project# REU-2017-17 Description: The controls for this substation are part of a system-wide substation control modernization project to improve communications to all substations as well as remove known obsolescence. The controls replacement will replace SCADA equipment manufactured by C3-Ilex which is unsupported and control panels that utilize obsolete mechanical protective relays that are in-accurate and require frequent maintenance and testing for NERC Compliance. Their replacement will provide$10K/year min savings by reduced testing requirements. The new devices will also provide disturbance recording as required by NERC. The upgrade will also provide increased physical security and access control in a neighborhood that has increased vagrancy and the Ground Grid corrosion issues will be repaired and tested. In addition,the two under-rated Circuit Switchers will be brought up to REU standards,the two 115KV Circuit Breakers will be replaced to achieve future EPA standards for SF-6 leakage rates,and the two aging transformers will be completely refurbished and the PCB contaminated oil replaced. Location: Citywide Project Cost: Prior Years/Future Costs: $20,996 Project Type: One-time System Improvements CIP Costs(detailed below) $3,179,000 Total Project Cost: $3,199,996 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $3,179,000 $0 $0 $0 $0 $0 $3,179,000 Total $3,179,000 $0 $0 $0 $0 $0 $3,179,000 Future Revenue-Funded Capital Projects Project # REU-2017-18 Description: Future Revenue Funded Capital Projects Location: Citywide Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $13,002,000 Total Project Cost: $13,002,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Electric Rates $0 $0 $3,108,000 $3,201,000 $3,297,000 $3,396,000 $13,002,000 Total $0 $0 $3,108,000 $3,201,000 $3,297,000 $3,396,000 $13,002,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-22 SOLID WASTE Benton Landfill Dirt Work Project# SW-4083-01 Description: To address erosion and ponding issues on the closed Benton Landfill. Location: 3025 South Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $350,000 Total Project Cost: $350,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $350,000 $0 $0 $0 $0 $0 $350,000 Total $350,000 $0 $0 $0 $0 $0 $350,000 Project Development $70,000 $0 $0 $0 $0 $0 $70,000 Construction $280,000 $0 $0 $0 $0 $0 $280,000 Total $350,000 $0 $0 $0 $0 $0 $350,000 BeAIIIIIgfigg Station Project# SW-4083-02 Description: To replace a failing monitoring station at the closed Benton Landfill Location: 3025 South Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $55,000 Total Project Cost: $55,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $55,000 $0 $0 $0 $0 $0 $55,000 Total $55,000 $0 $0 $0 $0 $0 $55,000 Project Development $11,000 $0 $0 $0 $0 $0 $11,000 Construction $44,000 $0 $0 $0 $0 $0 $44,000 Total $55,000 $0 $0 $0 $0 $0 $55,000 Transfer Station Tipping Floor Project # SW-4941-01 Description: The tipping floor is subject to use by heavy equipment and garbage trucks and wears down over time, requiring periodic resurfacing. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $321,993 $0 $0 $400,000 $0 $0 $721,993 Total $321,993 $0 $0 $400,000 $0 $0 $721,993 Project Development $64,399 $0 $0 $80,000 $0 $0 $144,399 Construction $257,594 $0 $0 $320,000 $0 $0 $577,594 Total $321,993 $0 $0 $400,000 $0 $0 $721,993 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C 23 SOLID WASTE Transfer Facility Resurface Asphalt Project# SW-4941-02 Description: The asphalt in the composting and green waste area is over 18 years old and failing due to aging and daily use by heavy equipment and trucks. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $500,000 $0 $0 $250,000 $0 $0 $750,000 Total $500,000 $0 $0 $250,000 $0 $0 $750,000 Project Development $50,000 $0 $0 $50,000 $0 $0 $100,000 Construction $450,000 $0 $0 $200,000 $0 $0 $650,000 Total $500,000 $0 $0 $250,000 $0 $0 $750,000 Slurry Seal Project# SW-4941-03 Description: Slurry seal to seal and maintain the driveways within the Transfer and Recycling Facility. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $0 $51,000 $0 $0 $0 $51,000 $102,000 Total $0 $51,000 $0 $0 $0 $51,000 $102,000 Project Development $0 $5,100 $0 $0 $0 $5,100 $10,200 Construction $0 $45,900 $0 $0 $0 $45,900 $91,800 Total $0 $51,000 $0 $0 $0 $51,000 $102,000 Recycling Baler Project# SW-4941-05 Description: The recycling baler is more than 15 years old and is in need of replacement. In addition, increased tonnages processed through the baler will necessitate a larger bailing unit,which will also require installing a new conveyor belt. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $780,000 Total Project Cost: $780,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $156,000 $624,000 $0 $0 $0 $0 $780,000 Total $156,000 $624,000 $0 $0 $0 $0 $780,000 Project Development $156,000 $0 $0 $0 $0 $0 $156,000 Construction $0 $624,000 $0 $0 $0 $0 $624,000 Total $156,000 $624,000 $0 $0 $0 $0 $780,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-24 SOLID WASTE Crane Repairs Project# SW-4941-06 Description: The crane is used to adjust loads in the transfer trailers prior to hauling to the landfill. Crane repairs cover the cost of replacing parts approximately every 5 years. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Improvements Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $0 $0 $80,000 $0 $0 $0 $80,000 Total $0 $0 $80,000 $0 $0 $0 $80,000 Project Development $0 $0 $12,000 $0 $0 $0 $12,000 Construction $0 $0 $68,000 $0 $0 $0 $68,000 Total $0 $0 $80,000 $0 $0 $0 $80,000 Wash Rack Project# SW-4941-07 Description: The wash rack is used to clean and sanitize collection vehicles, containers and carts. This project will replace the existing system with a more eco-friendly system. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $20,000 Total Project Cost: $20,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $20,000 $0 $0 $0 $0 $0 $20,000 Total $20,000 $0 $0 $0 $0 $0 $20,000 Project Development $3,000 $0 $0 $0 $0 $0 $3,000 Construction $17,000 $0 $0 SO $0 $0 $17,000 Total $20,000 $0 $0 SO $0 $0 $20,000 Lift Station Retrofit Project # SW-4941-08 Description: To increase stormwater handling capacity. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $50,000 Total Project Cost: $50,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $50,000 $0 $0 $0 $0 $0 $50,000 Total $50,000 $0 $0 $0 $0 $0 $50,000 Project Development $7,500 $0 $0 $0 $0 $0 $7,500 Construction $42,500 $0 $0 $0 $0 $0 $42,500 Total $50,000 $0 $0 $0 $0 $0 $50,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-25 SOLID WASTE Feasibility Study (Organics Recycling) Project# SW-4941-09 Description: To assess the most efficient and cost-effective process for handling Organics Recycling. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $50,000 Total Project Cost: $50,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $0 $50,000 $0 $0 $0 $0 $50,000 Total $0 $50,000 $0 $0 $0 $0 $50,000 Project Development $0 $50,000 $0 $0 $0 $0 $50,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $50,000 $0 $0 $0 $0 $50,000 Metal Shop Canopy Project# SW-4941-10 Description: Construction of a canopy over the welding shop to prevent water from entering the shop, creating a hazard. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Solid Waste Rates/Fees $0 $300,000 $0 $0 $0 $0 $300,000 Total $0 $300,000 $0 $0 $0 $0 $300,000 Project Development $0 $60,000 $0 $0 $0 $0 $60,000 Construction $0 $240,000 $0 $0 $0 $0 $240,000 Total $0 $300,000 $0 $0 $0 $0 $300,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-26 STORM DRAIN Mistletoe Area Project# SD-3, Description: Modify existing storm drain system to eliminate hotspots. Location: Mistletoe Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Rates $0 $60,000 $240,000 $0 $0 $0 $300,000 Total $0 $60,000 $240,000 $0 $0 $0 $300,000 Project Development $0 $60,000 $0 $0 $0 $0 $60,000 Construction $0 $0 $240,000 $0 $0 $0 $240,000 Total $0 $60,000 $240,000 $0 $0 $0 $300,000 Oregon Alley Project# SD-3515-08 Description: Install new storm drain system partnered with alley improvements. Location: Oregon Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $250,000 Total Project Cost: $250,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Rates $0 $0 $0 $0 $250,000 $0 $250,000 Total $0 $0 $0 $0 $250,000 $0 $250,000 Project Development $0 $0 $0 $0 $50,000 $0 $50,000 Construction $0 $0 $0 $0 $200,000 $0 $200,000 Total $0 $0 $0 $0 $250,000 $0 $250,000 Concrete Channel at Linden Project# SD-3515-09 Description: Install concrete box culvert or open channel similar to downstream portion. Location: Linden Avenue from S. Market to Favretto Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $350,000 Total Project Cost: $350,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Rates $0 $70,000 $280,000 $0 $0 $0 $350,000 Total $0 $70,000 $280,000 $0 $0 $0 $350,000 Project Development $0 $70,000 $0 $0 $0 $0 $70,000 Construction $0 $0 $280,000 $0 $0 $0 $280,000 Total $0 $70,000 $280,000 $0 $0 $0 $350,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-27 STORM DRAIN Hollow Lane Project # SD-3525-08 Description: Remove existing undersized pipes and replace with arch culvert. Location: Hollow Lane Project Cost: Prior Years/Future Costs: $11,100 Project Type: One-time System Improvements CIP Costs(detailed below) $444,150 Total Project Cost: $455,250 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Rates $444,150 $0 $0 $0 $0 $0 $444,150 Total $444,150 $0 $0 $0 $0 $0 $444,150 Project Development $88,830 $0 $0 $0 $0 $0 $88,830 Construction $355,320 $0 $0 $0 $0 $0 $355,320 Total $444,150 $0 $0 $0 $0 $0 $444,150 Mullen Parkway Channel Improvements Project# SD-4044-04 Description: Channel improvements concurrent with new development. Location: Lakewood Drive to Mullen Parkway Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $500,000 $500,000 Total $0 $0 $0 $0 $0 $500,000 $500,000 Project Development $0 $0 $0 $0 $0 $100,000 $100,000 Construction $0 $0 $0 $0 $0 $400,000 $400,000 Total $0 $0 $0 $0 $0 $500,000 $500,000 Linden Ditch Detention Project # SD-4044-05 Description: Construct detention basin on city property at Linden Creek Headwater. Location: Linden Creek -2050 Airpark Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $1,000,000 Total Project Cost: $1,000,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $1,000,000 $1,000,000 Total $0 $0 $0 $0 $0 $1,000,000 $1,000,000 Project Development $0 $0 $0 $0 $0 $200,000 $200,000 Construction $0 $0 $0 $0 $0 $800,000 $800,000 Total $0 $0 $0 $0 $0 $1,000,000 $1,000,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C 28 STORM DRAIN Hawthorne/Canby Project# SD-4439-03 Description: Install new storm drain system in area with existing roadside swales and ditches. Location: Hawthorne and Canby Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $0 $0 $60,000 $240,000 $0 $0 $300,000 Total $0 $0 $60,000 $240,000 $0 $0 $300,000 Project Development $0 $0 $60,000 $0 $0 $0 $60,000 Construction $0 $0 $0 $240,000 $0 $0 $240,000 Total $0 $0 $60,000 $240,000 $0 $0 $300,000 Brock Drive Project# SD-4439-04 Description: Construct detention system in roadway above Little Churn Creek. Location: Brock Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $0 $60,000 $240,000 $0 $0 $0 $300,000 Total $0 $60,000 $240,000 $0 $0 $0 $300,000 Project Development $0 $60,000 $0 $0 $0 $0 $60,000 Construction $0 $0 $240,000 SO $0 $0 $240,000 Total $0 $60,000 $240,000 $0 $0 $0 $300,000 Crossfire and Tarmac Project# SD-4439-05 Description: Install new storm drain system in area with existing roadside swales. Location: Crossfire and Tarmac Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $0 $0 $50,000 $250,000 $0 $0 $300,000 Total $0 $0 $50,000 $250,000 $0 $0 $300,000 Project Development $0 $0 $50,000 $0 $0 $0 $50,000 Construction $0 $0 $0 $250,000 $0 $0 $250,000 Total $0 $0 $50,000 $250,000 $0 $0 $300,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-29 STORM DRAIN Description: Construct detention system. Location: Ledell Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $200,000 Total Project Cost: $200,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $200,000 $200,000 Total $0 $0 $0 $0 $0 $200,000 $200,000 Project Development $0 $0 $0 $0 $0 $40,000 $40,000 Construction $0 $0 $0 $0 $0 $160,000 $160,000 Total $0 $0 $0 $0 $0 $200,000 $200,000 Description: Development of a new Master Plan to address the current regulatory environment and needs of the utility. Location: Citywide Project Cost: Prior Years/Future Costs: $12,090 Project Type: One-time System Improvements CIP Costs(detailed below) $287,910 Total Project Cost: $300,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Storm Drain Connection Fees $137,910 $150,000 $0 $0 $0 $0 $287,910 Total $137,910 $150,000 $0 $0 $0 $0 $287,910 Project Development $137,910 $150,000 $0 $0 $0 $0 $287,910 Construction $0 $0 $0 $0 $0 $0 $0 Total $137,910 $150,000 $0 $0 $0 $0 $287,910 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-30 STREETS Small Projects Project# Description: Various traffic operation and capacity improvements. Funds will be used as match for grant-funded projects or leverage for development projects. Location: Various Project Type: Ongoing Street Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Traffic Impact Fees $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 Total $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 Project Development $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 Safety Projects Project# ST-3520-01-2 Description: Competitive grant-funded projects to improve safety along street right-of-way. Contingent upon grant approval from various programs. Location: Various Project Type: Ongoing Street Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HSIP Grant $750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $4,500,000 Traffic Impact Fees $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 Total $825,000 $825,000 $825,000 $825,000 $825,000 $825,000 $4,950,000 Project Development $82,500 $82,500 $82,500 $82,500 $82,500 $82,500 $495,000 Construction $742,500 $742,500 $742,500 $742,500 $742,500 $742,500 $4,455,000 Total $825,000 $825,000 $825,000 $825,000 $825,000 $825,000 $4,950,000 Traffic Calming Project # ST-3520-01-4 Description: Install devices to reduce speeds and cut-through traffic in residential neighborhoods. Location: Various Project Type: Ongoing Street Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Streets and Roads Fund $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000 Total $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000 Project Development $6,000 $6,000 $6,000 $6,000 $6,000 $6,000 $36,000 Construction $34,000 $34,000 $34,000 $34,000 $34,000 $34,000 $204,000 Total $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-3 1 STREETS Bridge Maintenance Project# ST-3572-03 Description: Maintenance of structures including methacrylate deck treatment and erosion repairs. Location: Various Project Type: Ongoing Street Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $37,971 $151,917 $0 $0 $0 $0 $189,888 Local Streets and Roads Fund $4,919 $19,683 $0 $0 $0 $0 $24,602 Total $42,890 $171,600 $0 $0 $0 $0 $214,490 Project Development $42,890 $0 $0 $0 $0 $0 $42,890 Construction $0 $171,600 $0 $0 $0 $0 $171,600 Total $42,890 $171,600 $0 $0 $0 $0 $214,490 Pavement Maintenance Project# ST-3580-01 Description: Roadway surface maintenance work conducted annually on various streets. Location: Citywide Project Type: Ongoing Street Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Streets and Roads Fund $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $6,000,000 SB1 RMRA $509,808 $1,529,334 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $10,039,142 Total $1,509,808 $2,529,334 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $16,039,142 Project Development $196,275 $252,933 $300,000 $300,000 $300,000 $300,000 $1,649,208 Construction $1,313,533 $2,276,401 $2,700,000 $2,700,000 $2,700,000 $2,700,000 $14,389,934 Total $1,509,808 $2,529,334 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $16,039,142 Quartz Hill - Snow Lane to Terra Nova Lane Project# ST-4226-01 Description: Widen Quartz Hill from Terra Nova to Market Street to include shoulders, sidewalk on northbound side, and straighten alignment to improve safety. Project dependent upon pending Active Transportation Program (ATP) grant. Location: Quartz Hill Road Project Cost: Prior Years/Future Costs: $290,450 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $3,939,775 Total Project Cost: $4,230,225 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal ATP Grant $3,177,000 $0 $0 $0 $0 $0 $3,177,000 Local Streets and Roads Fund $430,445 $0 $0 $0 $0 $0 $430,445 Traffic Impact Fees $332,330 $0 $0 $0 $0 $0 $332,330 Total $3,939,775 $0 $0 $0 $0 $0 $3,939,775 Project Development $332,330 $0 $0 $0 $0 $0 $332,330 Construction $3,607,445 $0 $0 $0 $0 $0 $3,607,445 Total $3,939,775 $0 $0 $0 $0 $0 $3,939,775 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-32 STREETS Placer Street Improvements - Airpark to Pleasant Project # ST-4226-02-2 Description: Widen,AC overlay and restripe Placer Street to provide ultimate width for all modes of transportation including non- motorized improvements and lighting from Pleasant Street to Boston Avenue. Location: Placer Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $1,750,000 Total Project Cost: $1,750,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Streets and Roads Fund $0 $0 $0 $0 $20,000 $200,000 $220,000 Traffic Impact Fees $0 $0 $0 $0 $30,000 $1,500,000 $1,530,000 Total $0 $0 $0 $0 $50,000 $1,700,000 $1,750,000 Project Development $0 $0 $0 $0 $50,000 $0 $50,000 Construction $0 $0 $0 $0 $0 $1,700,000 $1,700,000 Total $0 $0 $0 $0 $50,000 $1,700,000 $1,750,000 Canby Road Widening Project# ST-4226-08 Description: Widen Canby Road north of Browning along the west side. Includes curb, gutter, and sidewalk. Location: Canby Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $250,000 Total Project Cost: $250,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Dana Drive Impact Fees $50,000 $200,000 $0 $0 $0 $0 $250,000 Total $50,000 $200,000 $0 $0 $0 $0 $250,000 Project Development $50,000 $0 $0 $0 $0 $0 $50,000 Construction $0 $200,000 $0 $0 $0 $0 $200,000 Total $50,000 $200,000 $0 $0 $0 $0 $250,000 Churn Creek/RanchoNictor Roundabout Project# ST-4226-09 Description: Construct roundabout at convergence of Churn Creek Road with both Victor Avenue and Rancho Road. Location: Churn Creek/RanchNictor Intersection Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,500,000 Total Project Cost: $2,500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Traffic Impact Fees $375,000 $2,125,000 $0 $0 $0 $0 $2,500,000 Total $375,000 $2,125,000 $0 $0 $0 $0 $2,500,000 Project Development $375,000 $0 $0 $0 $0 $0 $375,000 Construction $0 $2,125,000 $0 $0 $0 $0 $2,125,000 Total $375,000 $2,125,000 $0 $0 $0 $0 $2,500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-33 STREETS S Bonnyview 15 NB On-ramp Project# ST-4226-10 Description: Construct second receiving lane and extend NB ramp to accommodate growth. Project is required mitigation for California Gold Development and is a TIF credit/reimbursement agreement. Location: S Bonnyview 15 NB Ramp Project Cost: Prior Years/Future Costs: $111,750 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,500,000 Total Project Cost: $2,611,750 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Traffic Impact Fees $2,500,000 $0 $0 $0 $0 $0 $2,500,000 Total $2,500,000 $0 $0 $0 $0 $0 $2,500,000 Project Development $300,000 $0 $0 $0 $0 $0 $300,000 Construction $2,200,000 $0 $0 $0 $0 $0 $2,200,000 Total $2,500,000 $0 $0 $0 $0 $0 $2,500,000 S Bonnyview/I-5 Interchange Project # ST-4226-11 Description: Project to improve South Bonnyview corridor between Bechelli and Churn Creek including intersections, ramps, and interchange. Needed to accommodate growth and will be a TIF credit/reimbursement agreement. Location: S Bonnyview 15 NB Ramp Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $3,800,000 Total Project Cost: $3,800,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Traffic Impact Fees $450,000 $2,550,000 $0 $0 $400,000 $400,000 $3,800,000 Total $450,000 $2,550,000 $0 $0 $400,000 $400,000 $3,800,000 Project Development $450,000 $0 $0 $0 $0 $0 $450,000 Construction $0 $2,550,000 $0 $0 $400,000 $400,000 $3,350,000 Total $450,000 $2,550,000 $0 $0 $400,000 $400,000 $3,800,000 Sidewalk Replacement Project # ST-4407-01 Description: Annual project to replace worn and/or damaged sections of existing sidewalks. Location: Citywide Project Type: Ongoing Street Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Local Streets and Roads Fund $158,800 $150,000 $150,000 $150,000 $150,000 $150,000 $908,800 Water Rates $60,000 $0 $0 $0 $0 $0 $60,000 Total $218,800 $150,000 $150,000 $150,000 $150,000 $150,000 $968,800 Project Development $75,000 $22,500 $22,500 $22,500 $22,500 $22,500 $187,500 Construction $143,800 $127,500 $127,500 $127,500 $127,500 $127,500 $781,300 Total $218,800 $150,000 $150,000 $150,000 $150,000 $150,000 $968,800 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-34 STREETS Safe Routes to School - Bonnyview School Project# Description: Construction of curb, gutter,and sidewalk along Bidwell Road from the Bonnyview Elementary School boundary south to North Bonnyview Road and along the north side of North Bonnyview Road to East Bonnyview. Location: Bonnyview Lane Project Cost: Prior Years/Future Costs: $130,760 Project Type: One-time Street Improvement CIP Costs(detailed below) $412,590 Total Project Cost: $543,350 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal SRTS Grant $412,590 $0 $0 $0 $0 $0 $412,590 Total $412,590 $0 $0 $0 $0 $0 $412,590 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $412,590 $0 $0 $0 $0 $0 $412,590 Total $412,590 $0 $0 SO $0 $0 5412,590 ADA Curb Ramps Project# ST-4638-15 Description: Install ADA-accessible curb ramps at various intersections throughout the city. Location: Various Project Type: Ongoing Street Widening/Extension Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal CDBG Grant $81,200 $75,000 $75,000 $75,000 $75,000 $75,000 $456,200 Total $81,200 $75,000 $75,000 $75,000 $75,000 $75,000 $456,200 Project Development $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $90,000 Construction $66,200 $60,000 $60,000 $60,000 $60,000 $60,000 $366,200 Total $81,200 $75,000 $75,000 $75,000 $75,000 $75,000 $456,200 South Redding Pedestrian Improvements Project# ST-4775-01 Description: Construct multi-use path for bicyclists and pedestrians in Caltrans ROW on west side. Location: SR 273 between Girvan Road and Canyon Drive. Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $850,000 Total Project Cost: $850,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Caltrans $450,000 $0 $0 $0 $0 $0 $450,000 Local Streets and Roads Fund $150,000 $0 $0 $0 $0 $0 $150,000 State Prop 1B Grant $250,000 $0 $0 $0 $0 $0 $250,000 Total $850,000 $0 $0 $0 $0 $0 $850,000 Project Development $100,000 $0 $0 $0 $0 $0 $100,000 Construction $750,000 $0 $0 $0 $0 $0 $750,000 Total $850,000 $0 $0 $0 $0 $0 $850,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-35 STREETS Description: Two mid-block enhanced crossing locations, buffered bike lanes,and accessible pedestrian facilities. Location: Hartnell Avenue between Churn Creek Road and Project Cost: Prior Years/Future Costs: $268,620 Victor Avenue Project Type: One-time Street Improvement CIP Costs(detailed below) $1,636,080 Total Project Cost: $1,904,700 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HSIP Grant $64,242 $1,417,230 $0 $0 $0 $0 $1,481,472 State Prop 1B Grant $7,138 $147,470 $0 $0 $0 $0 $154,608 Total $71,380 $1,564,700 $0 $0 $0 $0 $1,636,080 Project Development $71,380 $0 $0 $0 $0 $0 $71,380 Construction $0 $1,564,700 $0 $0 $0 $0 $1,564,700 Total $71,380 $1,564,700 $0 $0 $0 $0 $1,636,080 Description: The project will complete sidewalk gaps, install ADA ramps, narrow travel lanes to provide standard bike lanes,and add street lighting along Churn Creek Road and Maraglia Street.An enhanced crosswalk will also be installed on Churn Creek Road with a refuge island and rectangular rapid flashing beacons. Location: Churn Creek Rd. between Hartnell and Cypress and Project Cost: Prior Years/Future Costs: $0 Maraglia St. between Churn Creek and Hilltop. Project Type: One-time Street Improvement CIP Costs(detailed below) $1,777,000 Total Project Cost: $1,777,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HSIP Grant $270,000 $1,329,300 $0 $0 $0 $0 $1,599,300 State Prop 1B Grant $30,000 $147,700 $0 $0 $0 $0 $177,700 Total $300,000 $1,477,000 $0 $0 $0 $0 $1,777,000 Project Development $300,000 $0 $0 $0 $0 $0 $300,000 Construction $0 $1,477,000 $0 $0 $0 $0 $1,477,000 Total $300,000 $1,477,000 $0 $0 $0 $0 $1,777,000 Description: Provide separate non-motorized facilities between the Diestelhorst Bridge to downtown Redding via Riverside Drive and Center Street. Project dependent upon Active Transportation Program (ATP) grant. Location: Riverside Drive and Center Street Project Cost: Prior Years/Future Costs: $128,950 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,508,992 Total Project Cost: $2,637,942 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal ATP Grant $374,968 $1,634,024 $0 $0 $0 $0 $2,008,992 Local Streets and Roads Fund $0 $100,000 $0 $0 $0 $0 $100,000 State STIP Grant $0 $400,000 $0 $0 $0 $0 $400,000 Total $374,968 $2,134,024 $0 $0 $0 $0 $2,508,992 Project Development $374,968 $0 $0 $0 $0 $0 $374,968 Construction $0 $2,134,024 $0 $0 $0 $0 $2,134,024 Total $374,968 $2,134,024 $0 $0 $0 $0 $2,508,992 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-36 STREETS Bechelll Lane Improvements Project# ST-4775-10 } Description: Construct buffered bike lanes, separated bike lanes, sidewalks, accessible driveways, curb ramps, enhanced crossings with rapid flashing beacons, and refuge islands. Location: Bechelli Ln.from S. Bonnyview to Cypress Ave. and Project Cost: Prior Years/Future Costs: $0 Loma Vista from Bechelli Ln.to Churn Creek Rd. Project Type: One-time Street Improvement CIP Costs(detailed below) $8,421,000 Total Project Cost: $8,421,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal ATP Grant $0 $0 $0 $0 $6,740,000 $0 $6,740,000 Local Streets and Roads Fund $0 $300,000 $300,000 $300,000 $0 $0 $900,000 REU GHG Non-motorized Tran $143,030 $0 $0 $0 $156,970 $0 $300,000 Traffic Impact Fees $0 $0 $0 $0 $481,000 $0 $481,000 Total $143,030 $300,000 $300,000 $300,000 $7,377,970 $0 $8,421,000 Project Development $143,030 $300,000 $300,000 $300,000 $0 $0 $1,043,030 Construction $0 $0 $0 $0 $7,377,970 $0 $7,377,970 Total $143,030 $300,000 $300,000 $300,000 $7,377,970 $0 $8,421,000 West Street Improvements Project# ST-4775-11 Description: Fill sidewalk gaps, enhance crossings with rapid flash beacons, curb extensions, refuge islands,and bike facilities. Location: West Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $3,196,000 Total Project Cost: $3,196,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal ATP Grant $400,000 $0 $2,148,000 $0 $0 $0 $2,548,000 Local Streets and Roads Fund $200,000 $0 $448,000 $0 $0 $0 $648,000 Total $600,000 $0 $2,596,000 $0 $0 $0 $3,196,000 Project Development $600,000 $0 $0 $0 $0 $0 $600,000 Construction $0 $0 $2,596,000 $0 $0 $0 $2,596,000 Total $600,000 $0 $2,596,000 $0 $0 $0 $3,196,000 Girvan Road Railroad Crossing Improvements Project# ST-4783-07 Description: Modify intersections at Eastside and SR 273 to accommodate pedestrians and reduce vertical grade separation at the railroad crossing. Location: Girvan Road at SR 273 Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $7,234,500 Total Project Cost: $7,234,500 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total State CPUC Grant $1,234,500 $6,000,000 $0 $0 $0 $0 $7,234,500 Total $1,234,500 $6,000,000 $0 $0 $0 $0 $7,234,500 Project Development $1,234,500 $0 $0 $0 $0 $0 $1,234,500 Construction $0 $6,000,000 $0 $0 $0 $0 $6,000,000 Total $1,234,500 $6,000,000 $0 $0 $0 $0 $7,234,500 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-37 STREETS 1 Shasta Street Railroad Crossing Improvements Project# ST-4783-08 Description: Install pedestrian crossing improvements on north side of railroad crossing. Location: Shasta Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $417,555 Total Project Cost: $417,555 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total State CPUC Grant $167,555 $250,000 $0 $0 $0 $0 $417,555 Total $167,555 $250,000 $0 $0 $0 $0 $417,555 Project Development $167,555 $0 $0 $0 $0 $0 $167,555 Construction $0 $250,000 $0 $0 $0 $0 $250,000 Total $167,555 $250,000 $0 $0 $0 $0 $417,555 Airport Corridor Project# ST-4803-01 Description: Widen Airport Road for additional capacity and operational safety. Location: Airport Road Corridor Project Cost: Prior Years/Future Costs: $80,450 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $2,470,950 Total Project Cost: $2,551,400 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total RRA $1,970,950 $0 $0 $0 $0 $0 $1,970,950 Shasta County DPW $500,000 $0 $0 $0 $0 $0 $500,000 Total $2,470,950 $0 $0 $0 $0 $0 $2,470,950 Project Development $169,550 $0 $0 $0 $0 $0 $169,550 Construction $2,301,400 $0 $0 SO $0 $0 $2,301,400 Total $2,470,950 $0 $0 SO $0 $0 $2,470,950 Downtown Streets Circulation Project # ST-4895-09 Description: Construct complete street improvements on Market St.,Yuba St., Butte St., and California St. Improvements include, roadway, curb gutter, sidewalk, street lights, drainage, utilities,cycle track, context sensitive landscaping and other miscellaneous items of work. Location: Market/Yuba/Butte/California Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $10,556,630 Total Project Cost: $10,556,630 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total State AHSC Grant $1,200,000 $9,356,630 $0 $0 $0 $0 $10,556,630 Total $1,200,000 $9,356,630 $0 $0 $0 $0 $10,556,630 Project Development $1,200,000 $0 $0 $0 $0 $0 $1,200,000 Construction $0 $9,356,630 $0 $0 $0 $0 $9,356,630 Total $1,200,000 $9,356,630 $0 $0 $0 $0 $10,556,630 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-`s,-5. STREETS Old Alturas Road Bridge over Churn Creek Project# ST-4 Description: Replace the bridge on Old Alturas Road over Churn Creek. Location: Old Alturas Road Project Cost: Prior Years/Future Costs: $650,185 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,575,815 Total Project Cost: $3,226,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $67,119 $2,213,250 $0 $0 $0 $0 $2,280,369 Traffic Impact Fees $8,696 $286,750 $0 $0 $0 $0 $295,446 Total $75,815 $2,500,000 $0 $0 $0 $0 $2,575,815 Project Development $75,815 $0 $0 $0 $0 $0 $75,815 Construction $0 $2,500,000 $0 $0 $0 $0 $2,500,000 Total $75,815 $2,500,000 $0 $0 $0 $0 $2,575,815 Sacramento Drive Bridge over Olney Creek Project# ST-4908-05 Description: Replace the bridge on Sacramento Drive over Olney Creek. Location: Sacramento Drive Project Cost: Prior Years/Future Costs: $570,000 Project Type: One-time Street Improvement CIP Costs(detailed below) $4,043,000 Total Project Cost: $4,613,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $200,000 $63,000 $3,780,000 $0 $0 $0 $4,043,000 Total $200,000 $63,000 $3,780,000 $0 $0 $0 $4,043,000 Project Development $200,000 $63,000 $0 $0 $0 $0 $263,000 Construction $0 $0 $3,780,000 $0 $0 $0 $3,780,000 Total $200,000 $63,000 $3,780,000 $0 $0 $0 $4,043,000 Eastside Road Bridge over Canyon Hollow Project # ST-4908-06 Description: Replace the bridge on Eastside Road over Canyon Hollow Creek Location: Eastside Road Project Cost: Prior Years/Future Costs: $45,245 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,637,955 Total Project Cost: $2,683,200 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $336,107 $61,971 $1,938,099 $0 $0 $0 $2,336,177 Traffic Impact Fees $42,648 $8,029 $251,101 $0 $0 $0 $301,778 Total $378,755 $70,000 $2,189,200 $0 $0 $0 $2,637,955 Project Development $378,755 $70,000 $0 $0 $0 $0 $448,755 Construction $0 $0 $2,189,200 $0 $0 $0 $2,189,200 Total $378,755 $70,000 $2,189,200 $0 $0 $0 $2,637,955 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-39 STREETS Girvan Road Bridge over Olney Creek IIIIIII Description: Replace the bridge on Girvan Road over Olney Creek. Location: Girvan Road Project Cost: Prior Years/Future Costs: $82,552 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,774,303 Total Project Cost: $2,856,855 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $316,087 $0 $2,129,147 $0 $0 $0 $2,445,234 Traffic Impact Fees $53,216 $0 $275,853 $0 $0 $0 $329,069 Total $369,303 $0 $2,405,000 $0 $0 $0 $2,774,303 Project Development $369,303 $0 $0 $0 $0 $0 $369,303 Construction $0 $0 $2,405,000 $0 $0 $0 $2,405,000 Total $369,303 $0 $2,405,000 $0 $0 $0 $2,774,303 Westside Road Bridge over Canyon Hollow Project# ST-4908-08 Description: Replace the bridge on Railroad Avenue over Canyon Hollow Creek Location: Westside Road Project Cost: Prior Years/Future Costs: $43,331 Project Type: One-time Street Improvement CIP Costs(detailed below) $3,035,228 Total Project Cost: $3,078,559 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $421,271 $36,297 $2,241,934 $0 $0 $0 $2,699,502 Traffic Impact Fees $40,557 $4,703 $290,466 $0 $0 $0 $335,726 Total $461,828 $41,000 $2,532,400 $0 $0 $0 $3,035,228 Project Development $461,828 $41,000 $0 $0 $0 $0 $502,828 Construction $0 $0 $2,532,400 $0 $0 $0 $2,532,400 Total $461,828 $41,000 $2,532,400 $0 $0 $0 $3,035,228 Canyon Road Bridge over ACID Canal Project# ST-4908-09 Description: Replace the bridge on Canyon Road over the ACID Canal. Location: Canyon Road Project Cost: Prior Years/Future Costs: $43,649 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,498,690 Total Project Cost: $2,542,339 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $407,495 $69,053 $1,735,542 $0 $0 $0 $2,212,090 Traffic Impact Fees $52,795 $8,947 $224,858 $0 $0 $0 $286,600 Total $460,290 $78,000 $1,960,400 $0 $0 $0 $2,498,690 Project Development $460,290 $78,000 $0 $0 $0 $0 $538,290 Construction $0 $0 $1,960,400 $0 $0 $0 $1,960,400 Total $460,290 $78,000 $1,960,400 $0 $0 $0 $2,498,690 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C 40 STREETS Eastslde Road Bridge over Olney Creek Project# ST-4908-10 Description: Replace the bridge on Eastside Road over Olney Creek. Location: Eastside Road Project Cost: Prior Years/Future Costs: $200,480 Project Type: One-time Street Improvement CIP Costs(detailed below) $1,853,369 Total Project Cost: $2,053,849 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $271,229 $1,369,560 $0 $0 $0 $0 $1,640,789 Traffic Impact Fees $35,140 $177,440 $0 $0 $0 $0 $212,580 Total $306,369 $1,547,000 $0 $0 $0 $0 $1,853,369 Project Development $306,369 $0 $0 $0 $0 $0 $306,369 Construction $0 $1,547,000 $0 $0 $0 $0 $1,547,000 Total $306,369 $1,547,000 $0 $0 $0 $0 $1,853,369 Sharon Avenue Bridge over ACID Project # ST-4908-11 Description: Replace the bridge on Sharon Avenue over the ACID canal. Location: Sharon Avenue Project Cost: Prior Years/Future Costs: $38,483 Project Type: One-time Street Improvement CIP Costs(detailed below) $1,017,523 Total Project Cost: $1,056,006 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HBP Grant $292,523 $725,000 $0 $0 $0 $0 $1,017,523 Total $292,523 $725,000 $0 $0 $0 $0 $1,017,523 Project Development $292,523 $0 $0 $0 $0 $0 $292,523 Construction $0 $725,000 $0 $0 $0 $0 $725,000 Total $292,523 $725,000 $0 $0 $0 $0 $1,017,523 Old Oregon Trail Widening Project # ST-4956-04 Description: Widen and realign Old Oregon Trail from Paso Robles to Bear Mountain Road. Location: Old Oregon Trail Project Cost: Prior Years/Future Costs: $294,938 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $1,888,300 Total Project Cost: $2,183,238 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Federal HSIP Grant $234,500 $1,265,300 $0 $0 $0 $0 $1,499,800 Traffic Impact Fees $60,600 $327,900 $0 $0 $0 $0 $388,500 Total $295,100 $1,593,200 $0 $0 $0 $0 $1,888,300 Project Development $295,100 $0 $0 $0 $0 $0 $295,100 Construction $0 $1,593,200 $0 $0 $0 $0 $1,593,200 Total $295,100 $1,593,200 $0 $0 $0 $0 $1,888,300 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-4 1 STREETS Description: Update the Oasis Road Specific Plan. Location: North Redding Traffic Benefit District Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $50,000 Total Project Cost: $50,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total North Redding Traffic Benefit $0 $50,000 $0 $0 $0 $0 $50,000 District Fees Total $0 $50,000 $0 $0 $0 $0 $50,000 Project Development $0 $50,000 $0 $0 $0 $0 $50,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $50,000 $0 $0 $0 $0 $50,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-42 WASTEWATER Infiltration and Inflow Control Description: Repair and rehabilitation of various aging sewer mains throughout the City as needed to reduce rainwater intrusion into the sewer system. Location: Citywide Project Type: Ongoing Collection System Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $1,156,890 $1,244,310 $1,282,890 $1,322,660 $1,363,670 $1,405.950 $7,776,370 Total $1,156,890 $1,244,310 $1,282,890 $1,322,660 $1,363,670 $1,405,950 $7,776,370 Project Development $150,396 $161,760 $166,776 $171,946 $177,277 $182,774 $1,010,928 Construction $1,006,494 $1,082,550 $1,116,114 $1,150,714 $1,186,393 $1,223,177 $6,765,442 Total $1,156,890 $1,244,310 $1,282,890 $1,322,660 $1,363,670 $1,405,950 $7,776,370 Westside Interceptor - Phase III Project# WW-4086-02 Description: Expansion of the main sewer serving the west region of the City to accommodate growth. Phase Ill will run from Girvan Road south to the Clear Creek Wastewater Treatment Plant. Location: Girvan Road to the Clear Creek WWTP Project Cost: Prior Years/Future Costs: $70,935 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $7,543,080 Total Project Cost: $7,614,015 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $590,000 $536,039 $536,039 $2,788,340 $0 $0 $4,450,418 Wastewater Rates $410,000 $372,501 $372,501 $1,937,660 $0 $0 $3,092,662 Total $1,000,000 $908,540 $908,540 $4,726,000 $0 $0 $7,543,080 Project Development $1,000,000 $908,540 $908,540 $0 $0 $0 $2,817,080 Construction $0 $0 $0 $4,726,000 $0 $0 $4,726,000 Total $1,000,000 $908,540 $908,540 $4,726,000 $0 $0 $7,543,080 Repair/Replace Sewer Lines Project# WW-4203-02 Description: Replace aging and damaged clay piping throughout the city. Location: Various Project Type: Ongoing Collection System Improvement Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $4,323,170 $4,937,800 $5,652,260 $7,289,450 $7,584,320 $7,942.800 $37,729.800 Total $4,323,170 $4,937,800 $5,652,260 $7,289,450 $7,584,320 $7,942,800 $37,729,800 Project Development $648,476 $740,670 $847,839 $1,093,418 $1,137,648 $1,191,420 $5,659,470 Construction $3,674,695 $4,197,130 $4,804,421 $6,196,033 $6,446,672 $6,751,380 $32,070,330 Total $4,323,170 $4,937,800 $5,652,260 $7,289,450 $7,584,320 $7,942,800 $37,729,800 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-43 WASTEWATER SWWTP Scrubber Replacement P P .. Description: The existing scrubber was installed in 1990 and has reached its useful life. The new scrubber will be an emergency scrubber system for chlorine and sulfur dioxide gas. Location: 6475 Airport Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Treatment System CIP Costs(detailed below) $750,000 Total Project Cost: $750,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $0 $0 $0 $750.000 $0 $0 $750,000 Total $0 $0 $0 $750,000 $0 $0 $750,000 Project Development $0 $0 $0 $75,000 $0 $0 $75,000 Construction $0 $0 $0 $675,000 $0 $0 $675.000 Total $0 $0 $0 $750,000 $0 $0 $750,000 Hartnell Lift Station Expansion Project# WW-LS-CC-02 Description: Increase capacity. Location: 420 Hartnell Avenue Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $141,430 Total Project Cost: $141,430 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $0 $0 $141,430 $0 $0 $0 $141,430 Total $0 $0 $141,430 $0 $0 $0 $141,430 Project Development $0 $0 $28,268 $0 $0 $0 $28,268 Construction $0 $0 $113,072 $0 $0 $0 $113,072 Total $0 $0 $141,340 $0 $0 $0 $141,340 North Market Lift Station Project# WW-LS-CC-04 Description: Increase capacity. Location: 971 N Market Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $142,550 Total Project Cost: $142,550 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $0 $0 $134,000 $0 $0 $0 $134,000 Wastewater Rates $0 $0 $8,550 $0 $0 $0 $8,550 Total $0 $0 $142,550 $0 $0 $0 $142,550 Project Development $0 $0 $28,510 $0 $0 $0 $28,510 Construction $0 $0 $114,040 $0 $0 $0 $114,040 Total $0 $0 $142,550 $0 $0 $0 $142,550 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-44 WASTEWATER Cheryl Lift Station Description: Construct shade structure and add AC Drives. Location: 3797 Cheryl Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $190,460 Total Project Cost: $190,460 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $0 $0 $0 $0 $190,460 $0 $190,460 Total $0 $0 $0 $0 $190,460 $0 $190,460 Project Development $0 $0 $0 $0 $38,092 $0 $38,092 Construction $0 $0 $0 $0 $152,368 $0 $152,368 Total $0 $0 $0 $0 $190,460 $0 $190,460 Lake .amiammkdiiimiik: # WW-P-CC-01 Description: Construct approximately 790 feet of 27"pipe,4,710 feet of 24"pipe, and 60 feet of 21"pipe from N Market Lift Station to Elk Drive. Location: Lake Redding Estates Project Cost: Prior Years/Future Costs: $120,000 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $5,353,814 Total Project Cost: $5,473,814 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $0 $0 $9,000 $236,422 $236,422 $0 $481,844 Wastewater Rates $0 $0 $91.000 $2,390,485 $2,390,485 $0 $4,871,970 Total $0 $0 $100,000 $2,626,907 $2,626,907 $0 $5,353,814 Project Development $0 $0 $100,000 $339,381 $0 $0 $439,381 Construction $0 $0 $0 $2,287,526 $2,626,907 $0 $4,914,433 Total $0 $0 $100,000 $2,626,907 $2,626,907 $0 $5,353,814 Lake Redding Interceptor II Project# WW-P-CC-01-2 Description: Construct 5,370 feet of 21"pipe from Quartz Hill Road to Moonstone Way. Location: Lake Redding Estates Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $2,400,000 Total Project Cost: $2,400,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $0 $0 $0 $0 $20,250 $195,750 $216,000 Wastewater Rates $0 $0 $0 $0 $204,750 $1,979,250 $2,184,000 Total $0 $0 $0 $0 $225,000 $2,175,000 $2,400,000 Project Development $0 $0 $0 $0 $225,000 $0 $225,000 Construction $0 $0 $0 $0 $0 $2,175,000 $2,175,000 Total $0 $0 $0 $0 $225,000 $2,175,000 $2,400,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 20 1 7-1 8 TO 2022-23 C-45 WASTEWATER Cumberland Drive 111111.111 Description: Replace approximately 1,800 feet of 8"pipe with 12"pipe from Everest Drive to approximately Dream Street. Location: Cumberland Drive Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $665,608 Total Project Cost: $665,608 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $0 $133,120 $532,488 $0 $0 $0 $665,608 Total $0 $133,120 $532,488 $0 $0 $0 $665,608 Project Development $0 $133,120 $0 $0 $0 $0 $133,120 Construction $0 $0 $532.488 $0 $0 $0 $532,488 Total $0 $133,120 $532,488 $0 $0 $0 $665,608 Canby Bypass Phase I Project# WW-P-CC-06 Description: Replace approximately 1.200 feet of undersized pipe. Location: Middleton Lane South of Hartnell Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $515,064 Total Project Cost: $515,064 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $515,064 $0 $0 $0 $0 $0 $515.064 Total $515,064 $0 $0 $0 $0 $0 $515,064 Project Development $103,013 $0 $0 SO $0 $0 $103,013 Construction $412,051 $0 $0 SO $0 $0 $412,051 Total $515,064 $0 $0 $0 $0 $0 $515,064 Loma Street Alley Project# WW-P-CC-23 Description: Replace approximately 1,850 feet of deteriorated pipe. Location: Between Loma Street and Market Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $563,060 Total Project Cost: $563,060 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $112.612 $450,448 $0 $0 $0 $0 $563.060 Total $112,612 $450,448 $0 $0 $0 $0 $563,060 Project Development $112,612 $0 $0 $0 $0 $0 $112,612 Construction $0 $450,448 $0 $0 $0 $0 $450.448 Total $112,612 $450,448 $0 $0 $0 $0 $563,060 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C 46 WASTEWATER Redbud/Hallmark Alley Project# WW-P-CC-27 1 Description: Replace approximately 4,200 feet of deteriorated pipe. Location: Between Redbud and Sun River Project Cost: Prior Years/Future Costs: $21,703 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $1,078,785 Total Project Cost: $1,100,488 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $1.078,785 $0 $0 $0 $0 $0 $1,078,785 Total $1,078,785 $0 $0 $0 $0 $0 $1,078,785 Project Development $121,360 $0 $0 $0 $0 $0 $121,360 Construction $957.425 $0 $0 $0 $0 $0 $957,425 Total $1,078,785 $0 $0 $0 $0 $0 $1,078,785 ive Project# WW-P-CC-28 Description: Replace approximately 1,400 feet of old pipe constructed at substandard grade. Location: Woodacre Drive and Bechelli Lane Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $512,394 Total Project Cost: $512,394 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $102,479 $409,915 $0 $0 $0 $0 $512.394 Total $102,479 $409,915 $0 $0 $0 $0 $512,394 Project Development $102,479 $0 $0 $0 $0 $0 $102,479 Construction $0 $409,915 $0 $0 $0 $0 $409,915 Total $102,479 $409,915 $0 $0 $0 $0 $512,394 Mercury Drive Project # WW-P-CC-5 Description: Replace approximately 1,670 feet of existing 8-inch diameter AC pipe with 12-inch diameter pipe. Location: Mercury Drive Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $662,600 Total Project Cost: $662,600 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $0 $132,520 $530,080 $0 $0 $0 $662.600 Total $0 $132,520 $530,080 $0 $0 $0 $662,600 Project Development $0 $132,520 $0 $0 $0 $0 $132,520 Construction $0 $0 $530,080 $0 $0 $0 $530.080 Total $0 $132,520 $530,080 $0 $0 $0 $662,600 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-47 WASTEWATER Sulphur Creek Description: Replace approximately 2,730 feet of undersized pipe in Lower Sulphur Creek and approximately 2,700 feet of undersized pipe in Upper Sulphur Creek. Location: Sulphur Creek Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $2,931,430 Total Project Cost: $2,931,430 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $0 $0 $0 $0 $0 $2,931,430 $2,931,430 Total $0 $0 $0 $0 $0 $2,931,430 $2,931,430 Project Development $0 $0 $0 $0 $0 $293,143 $293,143 Construction $0 $0 $0 $0 $0 $2,638,287 $2,638,287 Total $0 $0 $0 $0 $0 $2,931,430 $2,931,430 Oasis Road Project# WW-P-S-01 Description: Replace approximately 1,200 feet of under capacity pipe. Location: Oasis Road Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $414,290 Total Project Cost: $414,290 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Connection Fees $0 $54,686 $218,745 $0 $0 $0 $273,431 Wastewater Rates $0 $28,172 $112,687 $0 $0 $0 $140.859 Total $0 $82,858 $331,432 $0 $0 $0 $414,290 Project Development $0 $82,858 $0 $0 $0 $0 $82,858 Construction $0 $0 $331,432 $0 $0 $0 $331,432 Total $0 $82,858 $331,432 $0 $0 $0 $414,290 Patterson Court Project# WW-P-S-08 Description: Replace approximately 530 feet of deteriorated pipe. Location: Open Space east of Patterson Ct Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $264,300 Total Project Cost: $264,300 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Wastewater Rates $0 $52,860 $211,440 $0 $0 $0 $264,300 Total $0 $52,860 $211,440 $0 $0 $0 $264,300 Project Development $0 $52,860 $0 $0 $0 $0 $52,860 Construction $0 $0 $211,440 $0 $0 $0 $211,440 Total $0 $52,860 $211,440 $0 $0 $0 $264,300 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-48 WATER Pump Station Improvements Project# W-3020-01-02 Description: Rehab/repair pump stations. Location: Various Project Type: Ongoing Treatment System Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $285,580 $217,900 $224,662 $231,626 $238,807 $246,210 $1,444,785 Total $285,580 $217,900 $224,662 $231,626 $238,807 $246,210 $1,444,785 Project Development $57,116 $43,580 $44,932 $46,325 $47,761 $49,242 $288,957 Construction $228,464 $174,320 $179,730 $185,301 $191,046 $196,968 $1,155,828 Total $285,580 $217,900 $224,662 $231,626 $238,807 $246,210 $1,444,785 Pump House 1 Replacement Environmental Project# W-3020-04 Description: Environmental review for replacing Pump House 1 on the Sacramento River. Alternatives include rehabbing at current location or constructing a new pump house at various upstream locations. Location: 2300 Riverside Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Treatment System CIP Costs(detailed below) $1,500,000 Total Project Cost: $1,500,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $1.500,000 $0 $0 $0 $0 $0 $1,500,000 Total $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Project Development $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Replace Water Mains Project# W-4286-01 Description: Replace cast-iron, steel. asbestos, galvanized and degraded water mains throughout the City. Location: Citywide Project Type: Ongoing Distribution System Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $2.695,770 $1,743.000 $1,946,893 $2,007,246 $3.849,804 $5,588.608 $17,831,321 Total $2,695,770 $1,743,000 $1,946,893 $2,007,246 $3,849,804 $5,588,608 $17,831,321 Project Development $539,154 $348,600 $389,379 $401,449 $769,961 $1,117,722 $3,566,264 Construction $2.156.616 $1,394,400 $1.557,514 $1,605,797 $3,079,843 $4.470,886 $14,265.057 Total $2,695,770 $1,743,000 $1,946,893 $2,007,246 $3,849,804 $5,588,608 $17,831,321 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-49 WATER I Well Rehabilitation Project # W-4338--02-03 Description: Inspect, rehab, clean casing and screens to maintain production capacity. Location: Various Project Type: Ongoing Treatment System Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $1,538,790 $161,650 $63,563 $207,743 $67.565 $211,869 $2,251,180 Total $1,538,790 $161,650 $63,563 $207,743 $67,565 $211,869 $2,251,180 Project Development $307,758 $40,413 $15,891 $51,936 $16,891 $52,967 $485,856 Construction $1,231.032 $121,238 $47.672 $155,807 $50,674 $158,902 $1,765,325 Total $1,538,790 $161,650 $63,563 $207,743 $67,565 $211,869 $2,251,180 IIIIIIImamimk Project# W-4338-04 Description: Enterprise well water quality improvements. Study and implementation of sequestering agents distribution system flushing and loading to reduce iron, manganese and arsenic levels during the next five years. Other major well head treatment improvements postponed pending identification of funding. Location: Enterprise Wells Project Cost: Prior Years/Future Costs: $87,767 Project Type: One-time Treatment System CIP Costs(detailed below) $2,873,000 Total Project Cost: $2,960,767 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $2,873,000 $0 $0 $0 $0 $0 $2,873,000 Total $2,873,000 $0 $0 $0 $0 $0 $2,873,000 Project Development $287,300 $0 $0 $0 $0 $0 $287,300 Construction $2,585,700 $0 $0 $0 $0 $0 $2,585,700 Total $2,873,000 $0 $0 $0 $0 $0 $2,873,000 Foothill Water Treatment Plant Maintenance Project# W-4492-01 Description: Upgrades at the Foothill Water Treatment Plant to accommodate growth and replace aging equipment. Location: 3100 Foothill Boulevard Project Type: Ongoing Treatment System Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $824,800 $850,370 $876,730 $903,909 $931,930 $960,820 $5.348,559 Total $824,800 $850,370 $876,730 $903,909 $931,930 $960,820 $5,348,559 Project Development $123,720 $127,556 $131,510 $135,586 $139,790 $144,123 $802,284 Construction $701,080 $722,815 $745,221 $768,323 $792,141 $816,697 $4.546,275 Total $824,800 $850,370 $876,730 $903,909 $931,930 $960,820 $5,348,559 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-50 WATER Cypress Avenue Booster Pump Station Description: Construction of a 7 MGD pump station at the existing supervisory valve. This pump station will have the ability to pump in either direction between the Foothill and Enterprise pressure zones and greatly increase the flexibility of water delivery in the distribution system. Location: Cypress Avenue Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $1,269,480 Total Project Cost: $1,269,480 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $165.032 $1,104,448 $0 $0 $0 $0 $1,269,480 Total $165,032 $1,104,448 $0 $0 $0 $0 $1,269,480 Project Development $165,032 $0 $0 $0 $0 $0 $165,032 Construction $0 $1,104,448 $0 $0 $0 $0 $1,104,448 Total $165,032 $1,104,448 $0 $0 $0 $0 $1,269,480 Buckeye Water Treatment Plant Maintenance Project# W-4606-01 Description: Various maintenance projects at the Buckeye Water Treatment Plant. Location: 11501 Benson Drive/3100 Foothill Boulevard Project Type: Ongoing Treatment System Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $313,260 $111,620 $115,071 $118,638 $122,316 $126,108 $907,013 Total $313,260 $111,620 $115,071 $118,638 $122,316 $126,108 $907,013 Project Development $62,065 $27,905 $28,768 $29,660 $30,579 $31,527 $210,503 Construction $251,195 $83,715 $86,303 $88,979 $91.737 $94,581 $696.510 Total $313,260 $111,620 $115,071 $118,638 $122,316 $126,108 $907,013 Reservoir Improvements Project# W-4792-02 Description: Rehab/repair 1 MG Cascade tank and 3.5MG Enterprise tank. Location: 1987 Kenyon Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $575,000 Total Project Cost: $575,000 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $575,000 $0 $0 $0 $0 $0 $575.000 Total $575,000 $0 $0 $0 $0 $0 $575,000 Project Development $115,000 $0 $0 $0 $0 $0 $115,000 Construction $460,000 $0 $0 $0 $0 $0 $460,000 Total $575,000 $0 $0 $0 $0 $0 $575,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-5 1 WATER Description: Determine location and construct additional reservoir. Location: West Side of Redding Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $3,211,740 Total Project Cost: $3,211,740 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $0 $0 $0 $0 $417,526 $2,794,214 $3,211,740 Total $0 $0 $0 $0 $417,526 $2,794,214 $3,211,740 Project Development $0 $0 $0 $0 $417,526 $0 $417,526 Construction $0 $0 $0 $0 $0 $2,794,214 $2,794,214 Total $0 $0 $0 $0 $417,526 $2,794,214 $3,211,740 Description: Replace approximately 1,013 feet of existing waterline with 20"waterline to meet water system demands,water supply for new development, and improve fire flows. Location: Beltline Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $548,548 Total Project Cost: $548,548 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Connection Fees $0 $0 $0 $0 $0 $137,137 $137,137 Water Rates $0 $0 $0 $0 $0 $411,411 $411,411 Total $0 $0 $0 $0 $0 $548,548 $548,548 Project Development $0 $0 $0 $0 $0 $109,710 $109,710 Construction $0 $0 $0 $0 $0 $438,838 $438,838 Total $0 $0 $0 $0 $0 $548,548 $548,548 Description: Replace 1225 feet of existing waterline with 20"waterline to meet water system demands,water supply for new development, and improve fire flows. Location: Oasis Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $1,026,635 Total Project Cost: $1,026,635 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Connection Fees $0 $0 $0 $26,693 $178,634 $0 $205,327 Water Rates $0 $0 $0 $106,770 $714,538 $0 $821,308 Total $0 $0 $0 $133,463 $893,172 $0 $1,026,635 Project Development $0 $0 $0 $133,463 $0 $0 $133,463 Construction $0 $0 $0 $0 $893,172 $0 $893,172 Total $0 $0 $0 $133,463 $893,172 $0 $1,026,635 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-52 WATER Oasis 20" - Calexico to A6-V1 Project# W-CONV-03 Description: Replace 2,475 feet of existing waterline with 20"waterline to meet water system demands. water supply for new development, and improve fire flows. Location: Oasis Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $807,862 Total Project Cost: $807,862 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Connection Fees $0 $0 $0 $0 $69.476 $277,905 $347.381 Water Rates $0 $0 $0 $0 $92,096 $368,385 $460,481 Total $0 $0 $0 $0 $161,572 $646,290 $807,862 Project Development $0 $0 $0 $0 $161,572 $0 $161,572 Construction $0 $0 $0 $0 $0 $646,290 $646,290 Total $0 $0 $0 $0 $161,572 $646,290 $807,862 Lake Boulevard 24" - Oasis to Northpoint Project# W-CONV-04 Description: 24"Lake Boulevard-Oasis to Northpoint(9,090 feet) Location: Lake Boulevard Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $5,321,400 Total Project Cost: $5,321,400 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Rates $691,782 $4,629,618 $0 $0 $0 $0 $5,321,400 Total $691,782 $4,629,618 $0 $0 $0 $0 $5,321,400 Project Development $691,782 $0 $0 $0 $0 $0 $691,782 Construction $0 $4,629,618 $0 $0 $0 $0 $4,629,618 Total $691,782 $4,629,618 $0 $0 $0 $0 $5,321,400 Lake Boulevard 20" - Northpoint to Masonic Project# W-CONV-09 Description: Replace 700 feet of existing waterline with 20"waterline to meet water system demands, water supply for new development, and improve fire flows. Location: Lake Boulevard Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $427,552 Total Project Cost: $427,552 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Connection Fees $0 $0 $24,798 $99,192 $0 $0 $123,990 Water Rates $0 $0 $60,712 $242,850 $0 $0 $303,562 Total $0 $0 $85,510 $342,042 $0 $0 $427,552 Project Development $0 $0 $85,510 $0 $0 $0 $85,510 Construction $0 $0 $0 $342.042 $0 $0 $342,042 Total $0 $0 $85,510 $342,042 $0 $0 $427,552 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-53 WATER 16" Masonic to Hilltop Project # W-CONV-10 Description: Replace 1220 feet of existing waterline with 16"waterline to meet water system demands, water supply for new development, and improve fire flows. Location: Masonic to Hilltop Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $648,105 Total Project Cost: $648,105 Funding: 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 Total Water Connection Fees $0 $0 $0 $97,216 $388,863 $0 $486,079 Water Rates $0 $0 $0 $32,405 $129,621 $0 $162.026 Total $0 $0 $0 $129,621 $518,484 $0 $648,105 Project Development $0 $0 $0 $129.621 $0 $0 $129,621 Construction $0 $0 $0 $0 $518,484 $0 $518,484 Total $0 $0 $0 $129,621 $518,484 $0 $648,105 Note: The Engineering Division Cost Allocation section provides an approximation of costs for the project development and construction for projects requiring the involvement of the Engineering Division. Project development costs include preliminary engineering, environmental and permitting, right-of-way, design, consultant oversight, and bidding. Construction costs include the construction contract, contract administration, inspection, and consultant oversight. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C-54 FUTURE PROJECTS STREETS CIP No. Project Funding Source ST-2005-62 Traffic Control Device: Victor Avenue-El Vista Street DD651449 ST-2005-61 Traffic Control Device: Lake Boulevard -Santa Rosa Way DD651472 ST-2005-60 Canyon Creek Road Area Improvements CCRTIF/Fund 117 ST-2005-57 Traffic Control Device:Airport Road - Meadowview Drive DD651492 ST-2005-51 Traffic Control Device: Hartnell Avenue- Lawrence Road DD651460/DD651445 ST-2005-50 Traffic Control Device: Lake Boulevard - Panorama Drive DD651422 ST-F-104 Shasta View Drive Extension DD650722 ST-F-SV Shasta View Drive/College View Drive DD651506 WATER CIP No. Project Funding Source W-4286-01 Twin View Waterline DD651440 W-EWT-05 EW12 to EW14 Pipeline Water Rates W-EWT-03 EW14 Filtration Water Rates W-EW-01 EW11 Rehab Water Rates Note: The Future Projects list includes a variety of projects that are either beyond the 5-year window of the CIP and/or do not have all funding sources identified at this time. The identified Water, Wastewater,and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act(Government Code 66000)compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2017-18 TO 2022-23 C-55 FUTURE PROJECTS WITH IMPACT FEE COMPONENT STREETS Anticipated Construction CIP No. Project Date Funding Source ST-TIF-BIX Interstate 5 Interchange Improvements at South Bonnyview Road 2022-23 Traffic Impact Fees ST-TIF-CIX Churn Creek Road/SR 299 Interchange 2023-24 Traffic Impact Fees/ DD651505 ST-TIF-CC1 Churn Creek Road Widening - Browning to Bodenhamer 2025-26 Traffic Impact Fees ST-TIF-PL Placer Street Widening- Pleasant to Airpark 2026-27 Traffic Impact Fees ST-TIF-HIL Hilltop Drive Widening- River Bend Road to Browning Street 2027-28 Traffic Impact Fees ST-TIF-VC1,2,3 Victor Avenue Widening -Hartnell to Old Alturas 2028-29 Traffic Impact Fees ST-TIF-RA Railroad Avenue Widening -Grandview Ave.to Schley Ave. 2030-31 Traffic Impact Fees ST-TIF-OLD Old Alturas Road - ROW and Roundabouts at Victor Avenue, 2031-32 Traffic Impact Fees Lema Road, and Edgewood Drive WASTEWATER Anticipated Construction CIP No. Project Date Funding Source WW-TP-C-3 Clear Creek WWTP Pond Upgrades 2023-24 Wastewater Connection Fees WW-P-CC-4 Buenaventura Sewer 2023-24 Wastewater Connection Fees WATER Anticipated Construction CIP No. Project Date Funding Source W-CONV-16 Construct 24"Waterline from Quartz Hill Road to Keswick Dam 2026-27 Water Connection Road Fees/Water Rates W-CONV-15 Construct 30"Waterline from Buckeye Tank to Quartz Hill Road 2026-27 Water Connection Fees/Water Rates W-CONV-14 New 3.5 MG Buckeye Tank 2026-27 Water Connection Fees/Water Rates Note: The Future Projects list includes a variety of projects that are either beyond the 5-year window of the CIP and/or do not have all funding sources identified at this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act(Government Code 66000)compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 7-1 8 TO 2022-23 C 56