HomeMy WebLinkAboutReso 2015-095 - Redding Capital Improvement Plan• 0 RESOLUTION NO. 2015-095 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING ADOPTING THE REDDING CAPITAL IMPROVEMENT PLAN FOR 2015-16 to 2020-21 WHEREAS, a Capital Improvement Plan (CIP) has been prepared which identifies the City's long-term capital improvement project needs in a comprehensive and consistent format; and WHEREAS, the CIP was prepared in a format and with content that is consistent with the requirements of Government Code Section 66002, which establishes requirements for the preparation of a CIP that includes projects subject to development impact fees; and WHEREAS, the CIP was reviewed by the Redding Planning Commission on September 8, 2015, and was approved as consistent with the General Plan pursuant to Government Code Section 65103c; and WHEREAS, on December 1, 2015, the City Council held a duly noticed public hearing to allow opportunity for public comment on the draft CIP; and WHEREAS, having satisfied the requirements of law governing preparation, content, general plan consistency, and opportunity for public review, the City Council wishes to adopt said CIP to formalize the document so it can become available for consideration in budgeting, land use planning, and accounting, among other benefits. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding does hereby approve and adopt the Redding Capital Improvement Plan for 2015-16 to 2020-21 included herewith as Attachment "A." I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 1st day of December, 2015, and was fully adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ATTEST: (""Prl.4jo Wm -d PAMELA`MIZE, Cit Jerk Cadd, Schreder, Sullivan, None None None %1 Weaver, & McArthur MISSY McAR7]HUR, Mayor FORM APPROVED: O I .p BARRY E. DeWALT, City Attorney C I T Y O F EDDIM-G C A L 1 F O R N I AA ■ 1 2015 - 16 70 2020 -2 l E CAPITAL IMPROVEMENT I;d W --UL& 21 20IS16 TO 2020,1421 0 CAPITAL IMPROVEMENT PLAN TABLE OF CONTENTS AIntroduction......................................................................................................................... A-1 B General Overview ........................................ • Division Descriptions ....................................... ................. B-1 • Project Summary ........................................... ........................................................ .. B-6 ............................................... • Funding Overview by Division ........................... ...... B-12 ..................................................... • Funding Overview by Source .......................... .. B-15 C Detailed Program Summary • Airports ................................................ ..................................................................... C-1 • Community Services................................................................ ................................ C-5 • Redding Electric Utility....................................................................... .................... .. C-9 • Solid Waste.............................................................................. ............................ . C-21 • Storm Drain Utility.................................................................................................. C-24 • Streets.................................................................................................................... C-28 • Wastewater ..................... .............................. ......................................................... C-37 • Water..................................................................................................................... C-46 • Future/Unfunded Projects....................................................................................... C-54 Cl • SECTION A INTRODUCTION INTRODUCTION The City of Redding's 2015-16 to 2020-21 Capital Improvement Plan (CIP) is a five-year outlook on anticipated capital projects in the City of Redding. The City is required by Government Code 66002 to prepare and adopt a CIP. This document is used as a tool to help ensure that the City's short- and long-term capital investments are made in the context of careful consideration of the City's needs as well as the resources available to fund the related capital projects THE CIP AND GOOD PLANNING In general, all projects have their roots in the City's General Plan and in a particular department's master plan or other long-range planning document. For example, the General Plan includes goals and policies related to the City's wastewater treatment and collection system while the Wastewater Master Plan incorporates this direction, accounts for expected growth and the condition of the existing infrastructure, anticipates revenue, and identifies resulting infrastructure needs. These needs are then rolled into projects, a project delivery schedule is developed and then the projects summarized in the CIP. Section 65103c of the Government Code requires planning agencies to review the CIP for consistency with the General Plan. The Planning Commission reviewed the CIP on September 8, 2015, and found that it conforms to the General Plan. THE CIP AND THE CITY's 2 -YEAR BUDGET AND 1 YEAR FINANCIAL PLAN The budgeting for the City's CIP starts with the development of the City's 2 -year budget and 10 -year financial plan. This biennial process includes a combination of detailed staff analysis and broad public involvement. It is during this process that basic municipal operational and specific infrastructure needs are identified and matched with revenues generated from various local, State and Federal funding sources. This CIP is a projected $242 million plan with revenue from 25 different sources that can be grouped into eight different funding source categories. A detailed breakdown of the CIP funding by funding source can be found beginning on page B15 while a summary by funding source category is provided on the chart. C I P FU LADING SU MMARY Ra tes Total $156,350,210 64.6% PFC Tota 1 $927,509 0.4% Loca I Str RoauS rums Total $13,872,160 5.7% Successor Agency Total $2,200,000 0.9% Ucnc101 ruiiu Tota 1 $179,645 0.1% Tota 1 $27,890,347 11.5% GrantTota 1 $40,512,575 16.7% a tion Total � 24, 760 0.0% CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE A-1 TEAM EFFORT IN CIP FUNDING BY DIVISION BUILDING THE CIP Streets Total Wastewater $57 168 231 The document is prepared by 2 I Total 3 6 the Engineering Division in the Storm Drain $53,148,801 Public Works Department with Total 22.0% input from all Departments in $5,374,650 the City. As noted above, 2.2% many other commissions, community groups and partners have ongoing input Solid waste into the planning and budget Total documents that are the $1,976,000 foundation of the CIP. The 0.8% plan includes projects from all areas in the City including, but not limited to, projects that $56,Water Total 56, Total851,310 improve the City's streets, 23.5% $48,996,614 sewer facilities, water facilities, 20.3% storm drain facilities, airports, Community park facilities, fire facilities and Services Total Airports Total $125.0%loo police facilities. The major $6,257,900 0 emphasis in this CIP is 2.6% rehabilitation and replacement of aging infrastructure in the City's five rate -funded utilities and Streets program. This section contains two charts breaking out the CIP by program and each of the programs by their basic funding sources. FUNDING TYPE BY DIVISION Water E Wastewater , Streets Storm Drain ■ Solid Waste REU Community Services Airports 0% 20`Ya 40% 60% 80910 100% ■ Donation ■ General Fund ■ Grant ■ Impact Fees ■ Local Streets and Roads Fund ■ PFC Rates Successor Agency CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020.21 PAGE A-2 0 CIP ORGANIZATION The document includes a general overview followed by detailed program -by -program summaries of the entire plan. Section B - General Overview The general overview includes an overview of each City division contributing to the CIP, followed by a division by division summary of all projects with projected project costs (project development plus construction) and anticipated year of construction and concluding with a detailed overview of the various funding sources. The City's CIP includes 193 projects with a projected funding need of $242 million. The funding for the five-year CIP is local, State and Federal funding from 25 different funding sources. Section C - Detailed Program Summaries The detailed program summary includes an overview of the program including project by project summaries. These summaries include project descriptions, locations, funding sources, and anticipated schedule for when project development and construction funds will be needed. Funding Legend ATP — Active Transportation Program CDBG — Community Development Block Grant HBP — Local Highway Bridge Program HSIP — Highway Safety Improvement Program PFC — Passenger Facility Charge SRTS — Safe Routes to School STIP — State Transportation Improvement Program CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE A-3 0 ! SECTION B GENERAL OVERVIEW 0 0 AIRPORTS There are two airports located within Redding. The Redding Municipal Airport, located in the southeast portion of the City, is designated as a certified airport for commercial airline operations. Benton Airpark, located close to Downtown Redding at Placer Street and Airpark Drive, is a general aviation facility which provides reliever support to the Redding Municipal Airport. Both facilities are owned and operated by the City. The availability of convenient air transportation for residents and businesses is an asset to the community and can be used as a marketing tool in the City's economic development efforts. The 2005 Airport Master Plans outline future improvements planned for the Redding Municipal Airport and Benton Airpark. In addition to a listing of proposed improvement projects, the Master Plans identify estimated costs and general time frames (short-term, long-term, etc.) for installation of the improvements. General Plan Consistency: The projects planned for both airports are consistent with the General Plan's goals, objectives, and policies, which promote the maintenance and enhancement of our airports to provide convenient airport service for the community and strive to minimize any adverse impacts resulting from aircraft operations or airport expansion. Reference: Goals T9, T10, PF14: Policies T917, T1 OA, T1 OC, PF14A, PF14B, and PF14C. COMMUNITY SERVICES The Community Services Department oversees all the programming within the park system and the development, expansion, and enhancement of the park, trail, and open -space amenities. Currently, the City of Redding owns and operates a complete range of park and recreation facilities that include 68 park sites on approximately 635 acres of land. The park system includes the smallest of neighborhood parks, large regional parks, state-of-the-art athletic facilities, and special -use facilities, e.g., boat ramps and a dog park. The trail system has been recognized by federal and state agencies as a model. The core of the trail system is the Sacramento River Trail with many connecting trails and public open spaces. With several large athletic facilities completed in the last decade, including the Big League Dreams Park, the Redding Aquatic Center, and the Redding Soccer Park, resources have been redirected to the development of large neighborhood parks. Currently, the Department has agreements with five subdivision developers to build neighborhood parks concurrent with the houses. Park development fee credits will fund the bulk of the construction. General Plan Consistency: The proposed park and recreation projects are consistent with the General Plan's goals, objectives, and policies which promote the improvement of park and recreation facilities Citywide. Reference: Goals R4, R11, R12, PF15; Policies (all policies listed under the noted goals). CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020.21 PAGE B-1 E PUBLIC SAFETY • Police Department. The Redding Police Department has the primary responsibility of providing police protection and emergency -service response within the City limits. A mutual aid agreement is in effect with agencies on a statewide basis. The Redding Police Department has three main divisions — Administrative Services, Field Operations, and Investigations. Officers are assigned to seven beats throughout the City and are dispatched to calls via radio and mobile data computer. There are currently no planned 5 -year capital improvements for the Police Department Fire Department. The Redding Fire Department has the primary responsibility of providing fire protection and emergency -service response within the City limits. A mutual aid agreement is in effect with California Department of Forestry and Fire Protection (CDF ) during the wildland fire season for wildland and structure fires within a one -mile fringe area surrounding the City. An automatic aid agreement with the Shasta County Fire Department is also in effect for structure fires outside the wildland fire season. Under these agreements, the Redding Fire Department responds within a one -mile fringe area surrounding the City and to county islands. Shasta County Fire Department responds to a small geographic area on the east side of the City. The Redding Fire Department has three main divisions: Administration, Operations, and Fire Prevention. It operates from eight stations and a Fire Headquarters at City Hall. There are currently no planned 5 -year capital improvement needs for the Fire Department. REDDING ELECTRIC UTILITY As a California municipal corporation, the City of Redding owns, operates, and maintains power generation, transmission, and distribution facilities within the City limits. Given the investment in such facilities and a commitment to providing power at the lowest possible rates, it has historically been Redding's policy to be the sole provider of electric service within the City limits. As areas are annexed, City electric service is made available when PG&E facilities can be purchased or when service can be provided through a logical extension of the City's electric distribution system. Redding Electric Utility (REU) currently provides service to its customers in an area approximately 61 square miles in size, with 62 miles of 115 -kV transmission lines and 736 miles of overhead and underground 12 -kV distribution lines. REU is proud of its record over the past year of 99.97 percent electric service reliability. To remain competitive and to serve present and future demands for electric service, the Electric Utility plans on expanding the electric system in a logical manner to enhance its ability to deliver energy to customers and will acquire new energy resources as needed to meet customer energy needs. In addition to securing various long- and short-term power purchase contracts, the City owns and operates 183 MW of gas-fired generation within the City limits. General Plan Consistency: The projects planned for the Electric Utility are consistent with the General Plan's goals, objectives, and policies, which promote programs that provide safe, reliable, and competitively priced electricity for existing and future City electric customers. Reference: Goals CDD2 and PF7; Policies CDD2E, PF7A, PF713, PF7C, PF7D, PF7E, and PF14F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE B•2 SOLID WASTE Solid waste generated in the City is disposed of at Shasta County's Richard W. Curry/West Central Sanitary Landfill. Under existing state permits, the landfill has sufficient capacity to accommodate the disposal of solid waste at least to the year 2030. Expansion of the facility also appears to be plausible at such time as increased capacity is warranted beyond the extent of existing permits. Although Shasta County owns the Richard W. Curry Landfill, it has contracted with the City of Redding for the operation and management of the facility. This arrangement was formalized in 1988. All residential, commercial, and industrial refuse in Redding is collected by City personnel. Since 1995, the City has operated its own Solid Waste Transfer Station for the transfer of City -collected residential, commercial, and industrial refuse and the transfer of self -haul public refuse. The facility also has the capability of processing materials collected by curbside recycling programs and contains a household hazardous waste drop-off/processing area and a composting area. General Plan Consistency: The proposed solid waste projects are consistent with the Solid Waste Facility Master Plan and the City's General Plan goals, objectives, and policies, which promote the efficient collection and disposal of solid waste, while maintaining an adequate waste -disposal capacity. Reference: Goals CDD2 and PF8; Policies CDD2E and PF8A. STORM DRAINS The Redding Planning Area contains 15 watershed basins. Public storm -drainage facilities within the city limits are operated and maintained by the City. Surrounding unincorporated areas are the responsibility of the County of Shasta. As new areas are annexed, the City assumes responsibility for stormwater management. The City currently has a range of public and private storm -drain facilities to provide safe and efficient capture and conveyance of stormwater runoff and minimize the risks of flooding. Storm -drain facilities include more than 200 miles of storm drain pipe, more than 7,000 inlets, 1,200 outfalls and 200 miles of open channel. These systems typically outfall into natural ravines or tributaries and ultimately to the Sacramento River. General Plan Consistency: The proposed storm -drainage projects are consistent with the General Plan's goals, objectives, and policies, which promote efforts to reduce flooding and to properly manage stormwater runoff from development. Reference: Goals CDD2 and PF9; Policies CDD2E, PF9A, PF913, and PF9F. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-3 • STREETS Redding is both defined and constrained by its network of highways, roads, trails, railroads, and transit services that move its residents and goods in, through, and out of the community. The City is responsible for ensuring the construction and maintenance of all public streets, sidewalks, bridges, bikeways, traffic signals, and street signage within the city limits. The City also maintains a variety of Caltrans facilities consistent with the terms of various cooperative agreements. Developers are either partially or totally responsible for new street construction depending on the type and location of the project. The City uses public funds to build or improve major streets when the improvements were not constructed as part of a land development project. General Plan Consistency: The projects planned for streets are consistent with the General Plan's goals, objectives, and policies, which promote the development and maintenance of a safe and efficient public -street and bicycle -route system. Reference: Goal T3, T4, T6, T8, PF11, and PF12; Policies T3A, T3D, T4A, T46, T6D, T6E, T813, T8C, PF11 B, PF11 C, PF11 D, and PF11 E. SUPPORT SERVICES The Support Services Department is responsible for many internal City functions including the maintenance and repair of the City's facilities such as City Hall, the Corporation Yard and the multiple Redding Fire Stations to name a few. There are currently no planned 5 -year capital improvements for the Support Services Department. WASTEWATER The City of Redding is the sole provider of wastewater service within the City limits. The wastewater system has two major service areas, one served by the Clear Creek Wastewater Treatment Plant and the other served by the Stillwater Wastewater Treatment Plant. Facilities include: the Clear Creek Wastewater Treatment Plant, initially constructed in 1966, which currently has a capacity of 9.4 million gallons per day (mgd); the Stillwater Treatment Plant, put into service in 1992, which has a capacity of 4.0 mgd; and the wastewater collection system, which has approximately 430 miles of sewer mains, 17 lift stations, and over 7,000 manholes. The wastewater system serves nearly all developed property within the City, plus a few small developments in the surrounding unincorporated area. The City provides service to more than 43,000 household equivalents. One household equivalent is the average amount of wastewater produced by an average single-family residence, which is about 240 gallons per day. General Plan Consistency: The proposed wastewater projects are consistent with the General Plan's goals, objectives, and policies which support efforts to achieve and maintain an adequate level of service in the City's sewage collection and treatment system as needed to meet existing and future needs. Reference: Goals CDD2 and PF6; Policies CDD2E, PF6A, PF6B, and PF6C. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-4 WATER The City provides water for domestic and fire -suppression uses to most of the City and to small portions of the surrounding unincorporated area. The water system is supplied by two treatment plants and well fields. Facilities include: the Foothill Treatment Plant, which has a capacity of 28 million gallons per day (mgd); the Buckeye Treatment Plant, which has a capacity of 14.0 mgd; the Enterprise and Cascade well systems, which have a capacity of 19.1 mgd; and the City's water distribution system, which has approximately 430 miles of water mains. The water system serves about 83 percent of the current population of Redding and about 1,800 residents in the surrounding unincorporated area. The water utility provides service to approximately 29,000 households. General Plan Consistency: The proposed water projects are consistent with the General Plan's goals, objectives, and policies, which support efforts to maintain an adequate level of service in the City's water treatment and distribution system as needed to meet existing and future needs. Reference: Goals CDD2 and PF5; Policies CDD2E, PF5A, PF5B, and PF5C. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE B-5 PROJECT SUMMARY AIRPORTS Project No. Project Title Anticipated Construction Date Total Costs During Current CIP Timeframe Project Detail Page A -BEN -17-1 Automated Weather Observation Station (AWOS) 2017-18 $287,500 C-1 A -BEN -17-2 Rehab Parallel Taxiway B 2017-18 $415,000 C-1 A -BEN -18-1 Eastside T -Hangar Taxilane Reconstruction 2018-19 $892,000 C-2 A -BEN -19-1 Security Fencing 2019-20 $103,500 C-2 A -BEN -20-1 Rehab Parallel Taxiway A 2020-21 $475,200 C-2 A -BEN -20-2 Westside T -Hangar Taxilane Reconstruction 2021-22 $80,000 C-3 A-MUN-16-1 General Aviation Apron Reconstruction 2016-17 $1,432,300 C-3 A-MUN-16-2 T -Hangar Taxilane Reconstruction 2016-17 $3,698,200 C-3 A-MUN-20-1 Parallel Runway 2020-21 $4,800,000 C-4 $12,183,700 COMMUNITY SERVICES Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page CS -2005-17 Westridge Park Development 2018-19 $1,750,000 C-5 CS -2005-21 Shastina Ranch Park Development 2017-18 $1,600,000 C-5 CS -2005-23 Bel -Air Park Development 2016-17 $500,000 C-5 CS -2005-30 Highland Park Development 2016-17 $330,000 C-6 CS -2011-01 Salt Creek Heights Park 2016-17 $900,000 C-6 CS -2013-01 Softball Park Restroom 2015-16 $100,000 C-6 CS -2015-01 Henderson Open Space 2015-16 $890,000 C-7 CS -2015-02 Polk Open Space 2015-16 $105,500 C-7 CS -2015-03 Martin Luther King Jr. Park Restrooms 2015-16 $33,000 C-7 CS -2015-04 Palisades Trail 2015-16 $49,400 C-8 $6,257,900 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-6 0 0 PROJECT SUMMARY REU Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page REU-2007-03 Electric Utility GIS Mapping (GIS Conversion) 2015-16 $861,300 C-9 REU-2007-08 Units 1-3 Control System Replacement 2015-16 $2,231,050 C-9 REU-2009-04 General Generator Upgrade 2015-16 $157,510 C-9 REU-2009-06 Electric Building Modifications - Payment Kiosk 2016-17 $50,000 C-10 REU-2011-02 Corporation Yard Expansion 2015-16 $1,100,000 C-10 REU-2011-03 Unit 5 SCONX Improvement 2015-16 $470,000 C-10 REU-2011-05 Meter Reading Update 2015-16 $138,960 C-11 REU-2011-07 Asphalt Paving (Plant Resurfacing) 2016-17 $100,000 C-11 REU-2013-03 CT Gas Leak Detection System 2016-17 $90,000 C-11 REU-2013-05 Unit #6 EMX Upgrade 2017-18 $108,000 C-12 REU-2013-06 CT Unit #1 AVR Upgrade 2016-17 $128,000 C-12 REU-2015-01 General System Improvements Ongoing $47,528,490 C-12 REU-2015-02 Power Plant Generator Paint 2015-16 $200,000 C-13 REU-2015-03 Unit 5 Start Motor Upgrades 2015-16 $285,000 C-13 REU-2015-04 Unit 5 Automation Upgrade 2015-16 $60,000 C-13 REU-2015-05 Vibration Monitor for Unit 9 2015-16 $40,000 C-14 REU-2015-06 50 Cuft Carbon Vessel 2015-16 $35,000 C-14 REU-2015-07 Upstream NOx Analyzers 2015-16 $54,000 C-14 REU-2015-08 Peaker CO Analyzer 2015-16 $54,000 C-15 REU-2015-09 Upgrade T3000 2016-17 $25,000 C-15 REU-2015-10 General Plant Automation 2015-16 $440,000 C-15 REU-2015-11 Power Plant Security Improvement 2015-16 $15,000 C-16 REU-2015-12 Electrical Equipment Improvement 2015-16 $125,000 C-16 REU-2015-13 Gas Chromatograph 2015-16 $60,000 C-16 REU-2015-14 Regenerative Catalyst Wash 2015-16 $330,000 C-17 REU-2015-15 Spare Regenerative Catalyst 2015-16 $250,000 C-17 REU-2015-16 Unit 1 Fast Start Upgrade 2015-16 $60,000 C-17 REU-2015-17 Unit 4 Condenser Retubing 2016-17 $360,000 C-18 REU-2015-18 Units 3 and 4 Protective Relay Upgrade 2016-17 $180,000 C-18 REU-2015-19 Unit 4 Delta V Upgrade 2016-17 $410,000 C-18 REU-2015-20 Upgrade Unit 6 EMX Damper Actuators 2015-16 $160,000 C-19 REU-2015-21 Customer Service Lobby ADA 2015-16 $40,000 C-19 REU-2015-22 Remittance Equipment Replacement 2016-17 $205,000 C-20 REU-2015-23 Customer Self -Service Suite 2016-17 $500,000 C-20 $56,851,310 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-7 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-8 • • PROJECT SUMMARY SOLID WASTE Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page SW -4465-01 Building Replacement 2015-16 $155,000 C-21 SW -4941-01 Transfer Station Tipping Floor Ongoing $600,000 C-21 SW -4941-02 Transfer Facility Resurface Asphalt 2016-17 $500,000 C-21 SW -4941-03 Slurry Seal 2018-19 $51,000 C-22 SW -4941-04 Styrofoam Densifier 2015-16 $40,000 C-22 SW -4941-05 Recycling Baler 2016-17 $550,000 C-22 SW -4941-06 Crane Replacement 2018-19 $80,000 C-23 $1,976,000 STORM DRAIN Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date CIP Timeframe Page SD -3515-01 Programmatic Conveyance Replacement 2015-16 $1,274,650 C-24 SD -3515-06 Court/Sheridan/West 2016-17 $350,000 C-24 SD -3515-07 Julian/Mistletoe/Yana/Kenco 2017-18 $300,000 C-24 SD -3515-08 Oregon Alley 2018-19 $250,000 C-25 SD -3515-09 Concrete Channel at Linden/Lawrence/Templeton 2020-21 $350,000 C-25 SD -4044-04 Mullen Parkway Channel Improvements 2019-20 $500,000 C-25 SD -4044-05 Linden Ditch Detention 2017-18 $1,000,000 C-26 SD -4439-03 Victor/Canby/Hawthorne/Tanglewood 2017-18 $300,000 C-26 SD -4439-04 Brock Drive 2018-19 $300,000 C-26 SD -4439-05 Crossfire and Tarmac 2019-20 $250,000 C-27 SD -4439-06 Ledell Drive 2020-21 $200,000 C-27 SD -4937-01 Master Plan Update N/A $300,000 C-27 $5,374,650 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-8 • PROJECT SUMMARY STREETS Project No. Project Title Anticipated Construction Date Total Costs During Current CIP Timeframe Project Detail Page ST -2011-25 Churn Creek North Extension Plan Line N/A $20,000 C-28 ST -3520-01 Small Projects Ongoing $1,050,000 C-28 ST -3520-01-2 Safety Projects Ongoing $4,950,000 C-28 ST -3520-01-3 Traffic Control Devices Ongoing $1,200,000 C-29 ST -3520-01-4 Traffic Calming Ongoing $240,000 C-29 ST -3572-03 Bridge Maintenance Ongoing $803,500 C-29 ST -3580-01 Pavement Maintenance Ongoing $11,500,000 C-30 ST -4226-01 Quartz Hill - Snow Lane to Terra Nova Lane 2016-17 $3,197,000 C-30 ST -4226-02-1 Placer Street Improvements - Pleasant to Boston 2016-17 $4,445,000 C-30 ST -4226-02-2 Placer Street Improvements - Airpark to Pleasant 2020-21 $2,390,000 C-31 ST -4407-01 Sidewalk Replacement Ongoing $900,000 C-31 ST -4527-06 Safe Routes to School - Bonnyview School 2016-17 $437,590 C-31 ST -4638-15 ADA Curb Ramps Ongoing $450,000 C-32 ST -4783-04 East Cypress Pedestrian Improvements 2015-16 $298,000 C-32 ST -4783-05 Victor Avenue Improvements 2016-17 $1,500,000 C-32 ST -4858-06 Oasis Road Widening - Twin View Blvd. Realignment 2016-17 $5,400,000 C -33 ST -4908-04 Old Alturas Road Bridge over Churn Creek 2016-17 $2,771,455 C -33 ST -4908-05 Sacramento Drive Bridge over Olney Creek 2019-20 $2,542,628 C -33 ST -4908-07 Girvan Road Bridge over Olney Creek 2020-21 $2,666,073 C-34 ST -4908-10 Eastside Road Bridge over Olney Creek 2019-20 $2,013,220 C-34 ST -4908-11 Sharon Avenue Bridge over ACID 2019-20 $1,017,523 C-34 ST -4956-03 Churn Creek Road Widening 2015-16 $650,000 C-35 ST -4956-04 Old Oregon Trail Widening 2016-17 $1,888,300 C-35 ST -4956-05 Diestelhorst to Downtown 2017-18 $2,637,942 C-35 ST -4956-06 Airport Corridor 2018-19 $2,200,000 C-36 $57,168,231 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE B-9 E PROJECT SUMMARY WASTEWATER Project No. Project Title Anticipated Construction Date Total Costs During Current CIP Timeframe Project Detail Page WW -3512-01 Infiltration and Inflow Control Ongoing $8,124,100 C-37 WW -4086-02 Westside Interceptor - Phase III 2016-17 $2,635,130 C-37 WW -4203-02 Repair/Replace Sewer Lines Ongoing $23,563,790 C-37 WW -LS -CC -01 Westside Lift Station 2016-17 $478,190 C-38 WW -LS -CC -02 Hartnell Lift Station Expansion 2017-18 $141,340 C-38 WW -LS -CC -04 North Market Lift Station 2017-18 $142,550 C-39 WW -P -CC -01 Lake Redding Interceptor 1 2016-17 $2,610,400 C-39 WW -P -CC -01-2 Lake Redding Interceptor II 2016-17 $2,779,035 C-39 WW -P -CC -02 Cumberland Drive 2017-18 $665,608 C-40 WW -P -CC -03 East Cypress Avenue 2016-17 $269,238 C-40 WW -P -CC -06 Canby Bypass Phase 1 2016-17 $515,064 C-40 WW -P -CC -11 Bechelli Lane South 2018-19 $157,084 C-41 WW -P -CC -18 Azalea Avenue/1-5 Crossing 2019-20 $728,220 C-41 WW -P -CC -19-29 Hilltop Drive 2015-16 $1,026,206 C-41 WW -P -CC -21-22 San Francisco Street 2015-16 $4,480,070 C-42 WW -P -CC -23 Loma Street Alley 2016-17 $563,060 C-42 WW -P -CC -25 Manzanita Drive 2016-17 $124,200 C-42 WW -P -CC -26 Hallmark Drive Alley 2017-18 $739,296 C-43 WW -P -CC -27 Redbud Drive Alley 2017-18 $361,192 C-43 WW -P -CC -28 Woodacre Drive 2018-19 $512,394 C-43 WW -P -CC -31 Churn Creek Road 2016-17 $202,514 C-44 WW -P -CC -5 Mercury Drive 2019-20 $662,600 C-44 WW -P -S-01 Oasis Road 2016-17 $414,290 C-44 WW -P -S-08 Patterson Court 2018-19 $264,300 C-45 WW -P -S-09 Boneset Street 2015-16 $167,200 C-45 WW -TP -CC -01 Clear Creek WWTP Levee N/A $200,000 C-45 $52,527,071 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020.21 PAGE B-1 0 0 PROJECT SUMMARY WATER Project No. Project Title W-3020-01-02-03 W-3020-04 W-4285-04 W-4286-01 W-4286-02 W-4286-03 W-4338-02-03 W-4338-04 W-4492-01 W-4606-01 W-4733-02 W-4792-02 W-4795-03 W-4795-04 W-CONV-04 W-CONV-07 W-CONV-09 W -CONY -13-1 W-CONV-13-2 W-EWT-02 W-EWT-02.2 W-EWT-02.3 Pump Station Improvements Pump House 1 Replacement Environmental Twin View 16" Extension - Oasis to Caterpillar Replace Water Mains Magnolia Area Waterline Buckeye Area Water Main Well Rehabilitation Well Head Treatment System Foothill Water Treatment Plant Maintenance Buckeye Water Treatment Plant Maintenance South Bonnyview Bridge Pipe Realignment Cascade Reservoir Improvements Hill 900 Reservoir Enterprise Reservoir Repairs Lake Boulevard Waterline Hill 900 Waterline Lake Boulevard 20" - Northpoint to Masonic Twin View Waterline Phase I Twin View Waterline Phase II Enterprise Wells - Blending Study EW13 and EW14 Blending Pipeline Enterprise Wells - Block Problem Zones 0 Anticipated Total Costs Project Construction During Current Detail Date CIP Timeframe Page Ongoing 2016-17 2016-17 Ongoing 2015-16 2015-16 Ongoing 2015-16 2015-16 2015-16 2015-16 2017-18 2015-16 2016-17 2018-19 2015-16 2020-21 2016-17 2017-18 N/A 2019-20 N/A $1,078,399 $1,500,000 $2,278,793 $11,583,956 $2,107,170 $995,759 $2,027,805 $1,905,400 $9,104,759 $815,213 $211,660 $475,000 $3,211,740 $100,000 $5,321,400 $923,070 $731,114 $1,196,175 $1,196,175 $46,020 $2,377,278 $113,290 $49,300,176 C-46 C-46 C-46 C-47 C-47 C-47 C-48 C-48 C-48 C-49 C-49 C-49 C-50 C-50 C-50 C-51 C-51 C-51 C-52 C-52 C-52 C-53 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020.21 PAGE B-1 1 0 FUNDING OVERVIEW BY DIVISION AIRPORTS to Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - Federal Airport Grant Funds - State General Fund PFC Total COMMUNITY SERVICES $390,291 $2,803,050 $2,155,020 $750,150 $583,980 $4,348,380 $11,030,871 $0 $4,163 $30,690 $37,508 $6,534 $22,500 $101,395 $0 $5,087 $37,510 $45,842 $7,986 $27,500 $123,925 $40,209 $280,200 $158,780 $0 $46,700 $401,620 $927,509 $430,500 $3,092,500 $2,382,000 $833,500 $645,200 $4,800,000 $12,183,700 Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total CDBG General Fund Local Donations Park Development Fees Park Grant Funds - State Total REU $77,280 $0 $0 $0 $0 $0 $77,280 $55,720 $0 $0 $0 $0 $0 $55,720 $24,760 $0 $0 $0 $0 $0 $24,760 $50,000 $1,030,000 $850,000 $2,150,000 $500,000 $500,000 $5,080,000 $531,840 $350,000 $138,300 $0 $0 $0 $1,020,140 $739,600 $1,380,000 $988,300 $2,150,000 $500,000 $500,000 $6,257,900 Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates Electric System Financing Total SOLID WASTE Potential Funding Sources Solid Waste Rates Total $11,133,660 $8,552,650 $8,700,000 $8,855,000 $9,116,000 $9,394,000 $55,751,310 $1,100,000 $0 $0 $0 $0 $0 $1,100,000 $12,233,660 $8,552,650 $8,700,000 $8,855,000 $9,116,000 $9,394,000 $56,851,310 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 $195,000 $1.250.000 $195,000 $1,250,000 $0 $131,000 $400,000 $0 $131,000 $400,000 Total $0 $1,976,000 $0 $1,976,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015.16 TO 2020-21 PAGE B-12 0 0 FUNDING OVERVIEW BY DIVISION STORM DRAIN Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $150,000 $350,000 $1,100,000 $300,000 $750,000 $200,000 $2,850,000 Storm Drain Rates $252.500 $497,500 $507,200 $464,660 $222,390 $580,400 $2,524,650 Total $402,500 $847,500 $1,607,200 $764,660 $972,390 $780,400 $5,374,650 STREETS Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total ATP Grant $0 $6,260,918 $1,634,024 $0 $0 $0 $7,894,942 CDBG $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 HBP $925,203 $3,620,191 $205,236 $0 $4,144,559 $1,972,448 $10,867,637 HSIP $2,066,120 $3,136,800 $750,000 $750,000 $750,000 $750,000 $8,202,920 Local Streets and Roads Fund $3,260,000 $3,532,160 $1,790,000 $1,690,000 $1,710,000 $1,890,000 $13,872,160 North Redding Traffic Benefit $700,000 $4,700,000 $0 $0 $0 $0 $5,400,000 D i stri ct Prop 16 Grant $29,800 $0 $0 $0 $0 $0 $29,800 Shastec $0 $0 $200,000 $2,000,000 $0 $0 $2,200,000 SRTS $25,000 $412,590 $0 $0 $0 $0 $437,590 STIP $0 $0 $400,000 $0 $0 $0 $400.000 Traffic Impact Fees $716,070 $1,455,355 $463,764 $450,000 $657,441 $2,205,552 $5,948,182 Wastewater Connection Fees $0 $0 $0 $0 $20,000 $250,000 $270,000 Water Connection Fees $5,000 $160,000 $0 $0 $20,000 $350,000 $535,000 Water Rates $20,000 $640,000 $0 $0 $0 $0 $660,000 Total $7,822,193 $23,993,014 $5,518,024 $4,965,000 $7,377,000 $7,493,000 $57,168,231 WASTEWATER Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Connection Fees $2,110,684 $1,626,921 $275,340 $0 $0 $0 $4,012,945 Wastewater Rates $7,731,932 $10,259,170 $6,234,476 $6,591,598 $8,579,700 $9,117,250 $48,514,126 Total $9,842,616 $11,886,091 $6,509,816 $6,591,598 $8,579,700 $9,117,250 $52,527,071 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-13 0 0 FUNDING OVERVIEW BY DIVISION WATER Potential Funding Sources 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Connection Fees $37,703 $1,483,258 $1,228,446 $2,216,363 $0 $427,552 $5,393,322 Water Rates $16,778,740 $7,826,012 $4,209,274 $5,604,705 $5,649,425 $3,838,698 $43,906,854 Total $16,816,443 $9,309,270 $5,437,720 $7,821,068 $5,649,425 $4,266,250 $49,300,176 Note: The above is an overview of potential funding sources for projects contained in the main term of the Capital Improvement Plan and each project is subject to Redding City Council and/or Redding Redevelopment Agency budgetary approval. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE B-14 0 0 FUNDING OVERVIEW BY SOURCE DONATION Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Local Donations $24,760 $0 $0 $0 $0 $0 $24,760 Total $24,760 $0 $0 $0 $0 $0 $24,760 GENERAL FUND Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total General Fund $55,720 $5,087 $37,510 $45,842 $7,986 $27,500 $179,645 Total $55,720 $5,087 $37,510 $45,842 $7,986 $27,500 $179,645 GRANT Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - Federal $390,291 $2,803,050 $2,155,020 $750,150 $583,980 $4,348,380 $11,030,871 Airport Grant Funds - State $0 $4,163 $30,690 $37,508 $6,534 $22,500 $101,395 ATP Grant $0 $6,260,918 $1,634,024 $0 $0 $0 $7,894,942 CDBG $152,280 $75,000 $75,000 $75,000 $75,000 $75,000 $527,280 HBP $925,203 $3,620,191 $205,236 $0 $4,144,559 $1,972,448 $10,867,637 HSIP $2,066,120 $3,136,800 $750,000 $750,000 $750,000 $750,000 $8,202,920 Park Grant Funds - State $531,840 $350,000 $138,300 $0 $0 $0 $1,020,140 Prop 1 B Grant $29,800 $0 $0 $0 $0 $0 $29,800 SRTS $25,000 $412,590 $0 $0 $0 $0 $437,590 STIP $0 $0 $400,000 $0 $0 $0 $400,000 Total IMPACT FEES $4,120,534 $16,662,712 $5,388,270 $1,612,658 $5,560,073 $7,168,328 $40,512,575 Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total North Redding Traffic Benefit District $700,000 $4,700,000 $0 $0 $0 $0 $5,400,000 Park Development Fees $50,000 $1,030,000 $850,000 $2,150,000 $500,000 $500,000 $5,080,000 Storm Drain Connection Fees $150,000 $350,000 $1,100,000 $300,000 $750,000 $200,000 $2,850,000 Traffic Impact Fees $716,070 $1,455,355 $463,764 $450,000 $657,441 $2,205,552 $5,948,182 Wastewater Connection Fees $2,110,684 $1,626,921 $275,340 $0 $20,000 $250,000 $4,282,945 Water Connection Fees $42,703 $1,643,258 $1,228,446 $2,216,363 $20,000 $777,552 $5,928,322 Total $3,769,457 $10,805,534 $3,917,550 $5,116,363 $1,947,441 $3,933,104 $29,489,449 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE B-1 5 0 • FUNDING OVERVIEW BY SOURCE LOCAL STREETS AND ROADS FUND Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Local Streets and Roads Fund $3,260,000 $3,532,160 $1,790,000 $1,690,000 $1,710,000 $1,890,000 $13,872,160 Total $3,260,000 $3,532,160 $1,790,000 $1,690,000 $1,710,000 $1,890,000 $13,872,160 PFC Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total PFC $40,209 $280,200 $158,780 $0 $46,700 $401,620 $927,509 Total $40,209 $280,200 $158,780 $0 $46,700 $401,620 $927,509 RATES Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $11,133,660 $8,552,650 $8,700,000 $8,855,000 $9,116,000 $9,394,000 $55,751,310 Electric System Financing $1,100,000 $0 $0 $0 $0 $0 $1,100,000 Solid Waste Rates $195,000 $1,250,000 $0 $131,000 $400,000 $0 $1,976,000 Storm Drain Rates $252,500 $497,500 $507,200 $464,660 $222,390 $580,400 $2,524,650 Wastewater Rates $7,731,932 $10,259,170 $6,234,476 $6,591,598 $8,579,700 $9,117,250 $48,514,126 Water Rates $16,798,740 $8,466,012 $4,209,274 $5,604,705 $5,649,425 $3,838,698 $44,566,854 Total $37,211,832 $29,025,332 $19,650,950 $21,646,963 $23,967,515 $22,930,348$154,432,940 SUCCESSOR AGENCY Funding Source 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Shastec $0 $0 $200,000 $2,000,000 $0 $0 $2,200,000 Total $0 $0 $200,000 $2,000,000 $0 $0 $2,200,000 Total $48,482,512 $60,311,025 $31,143,060 $32,111,826 $33,239,715 $36,350,900$241,639,038 Note: The above is an overview of potential funding sources for projects contained in the main term of the Capital Improvement Plan and each project is subject to Redding City Council and/or Redding Redevelopment Agency budgetary approval. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020.21 PAGE B•1 6 0 0 ECTION C DETAILED PROGRAM SUMMARIES C'J AIRPORTS Automated Weather Observation Station (AWOS) Description: This project involves the design and construction of an Automated Weather Observation System (AWOS) for Benton Airpark. Weather conditions specifically at the airport are not currently available. Pilots receive weather reports from the Control Tower at Redding Municipal Airport during hours when the Tower is in operation. The AWOS is a permanently installed device that will provide 24-hour weather conditions like wind speed and direction, cloud height, temperature and dew point. All of these items are critical for both arriving and departing aircraft. The AWOS information will be broadcast over a dedicated aviation frequency or pilots (and public) can call into the automated system from their phone. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $287,500 Total Project Cost: $287,500 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - Federal $0 $33,750 $225,000 $0 $0 $0 $258,750 Airport Grant Funds - State $0 $1,688 $11,250 $0 $0 $0 $12,938 General Fund $0 $2,062 $13,750 $0 $0 $0 $15,812 Total $0 $37,500 $250,000 $0 $0 $0 $287,500 Project Development $0 $37,500 $0 $0 $0 $0 $37,500 Construction $0 $0 $250,000 $0 $0 $0 $250,000 Total $0 $37,500 $250,000 $0 $0 $0 $287,500 Rehab Parallel Taxiway B Project # A -BEN -17-2 Description: The westside taxiway at Benton Airpark is in need of rehabilitation. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $415.000 Total Project Cost: $415,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total General Fund $0 $3,025 $19,800 $0 $0 $0 $22,825 Airport Grant Funds - Federal $0 $49,500 $324,000 $0 $0 $0 $373,500 Airport Grant Funds - State $0 $2,475 $16,200 $0 $0 $0 $18,675 Total $0 $55,000 $360,000 $0 $0 $0 $415,000 Project Development $0 $55,000 $0 $0 $0 $0 $55,000 Construction $0 $0 $360,000 $0 $0 $0 $360.000 Total $0 $55,000 $360,000 $0 $0 $0 $415,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-1 0 0 AIRPORTS Description: This project includes the reconstruction of 16,000 square yards of taxilanes on the eastside of Benton Airpark. These taxilanes are needed to access City -owned t -hangars. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $892,000 Total Project Cost: $892,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total General Fund $0 $0 $3,960 $45,100 $0 $0 $49,060 Airport Grant Funds - Federal $0 $0 $64,800 $738,000 $0 $0 $802,800 Airport Grant Funds - State $0 $0 $3,240 $36,900 $0 $0 $40,140 Total $0 $0 $72,000 $820,000 $0 $0 $892,000 Project Development $0 $0 $72,000 $0 $0 $0 $72,000 Construction $0 $0 $0 $820.000 $0 $0 $820,000 Total $0 $0 $72,000 $820,000 $0 $0 $892,000 Security Fencing Project # A -BEN -19-1 Description: This project consists of constructing approximately 4.600 lineal feet of new security fencing. The security fencing will be used to better protect airport property. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $103,500 Total Project Cost: $103,500 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - State $0 $0 $0 $608 $4,050 $0 $4,658 General Fund $0 $0 $0 $742 $4,950 $0 $5,692 Airport Grant Funds - Federal $0 $0 $0 $12,150 $81,000 $0 $93,150 Total $0 $0 $0 $13,500 $90,000 $0 $103,500 Project Development $0 $0 $0 $13,500 $0 $0 $13,500 Construction $0 $0 $0 $0 $90,000 $0 $90,000 Total $0 $0 $0 $13,500 $90,000 $0 $103,500 Rehab Parallel Taxiway A Project # A -BEN -20-1 Description: The eastside taxiway at Benton Airpark is in need of rehabilitation. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Benton Airpark CIP Costs(detailed below) $475,200 Total Project Cost: $475,200 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - State $0 $0 $0 $0 $2,484 $18,900 $21,384 General Fund $0 $0 $0 $0 $3,036 $23,100 $26,136 Airport Grant Funds - Federal $0 $0 $0 $0 $49,680 $378,000 $427,680 Total $0 $0 $0 $0 $55,200 $420,000 $475,200 Project Development $0 $0 $0 $0 $55,200 $0 $55,200 Construction $0 $0 $0 $0 $0 $420,000 $420,000 Total $0 $0 $0 $0 $55,200 $420,000 $475,200 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-2 AIRPORTS Description: This project involves the reconstruction of the westside t -hangar taxilanes (16,000 SY). The existing apron is more than 20 years old and reconstruction will extend the useful life by up to 20 years. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $900,000 Project Type: One-time Benton Airpark CIP Costs(detailed below) $80,000 Total Project Cost: $980,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total General Fund $0 $0 $0 $0 $0 $4,400 $4,400 Airport Grant Funds - Federal $0 $0 $0 $0 $0 $72,000 $72,000 Airport Grant Funds - State $0 $0 $0 $0 $0 $3,600 $3,600 Total $0 $0 $0 $0 $0 $80,000 $80,000 Project Development $0 $0 $0 $0 $0 $80,000 $80,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $80,000 $80,000 General Aviation Apron Reconstruction Project # A-MUN-16-1 Description: Reconstruct the west general aviation apron (approximately 10,000 square yards west of Air Shasta). Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $1,432,300 Total Project Cost: $1,432.300 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - Federal $119,943 $1,178,580 $0 $0 $0 $0 $1,298,523 PFC $12.357 $121,420 $0 $0 $0 $0 $133,777 Total $132,300 $1,300,000 $0 $0 $0 $0 $1,432,300 Project Development $132,300 $0 $0 $0 $0 $0 $132,300 Construction $0 $1,3007000 $0 $0 $0 $0 $1,300.000 Total $132,300 $1,300,000 $0 $0 $0 $0 $1,432,300 T -Hangar Taxilane Reconstruction Project # A-MUN-16-2 Description: Reconstruct 52,850 square yards of taxilanes that run between the aircraft storage t -hangars. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $4,235 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $3,698,200 Total Project Cost: $3,702,435 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - Federal $270,348 $1,541,220 $1,541,220 $0 $0 $0 $3,352,788 PFC $27,852 $158,780 $158,780 $0 $0 $0 $345,412 Total $298,200 $1,700,000 $1,700,000 $0 $0 $0 $3,698,200 Project Development $298,200 $0 $0 $0 $0 $0 $298,200 Construction $0 $1,700.000 $1,700,000 $0 $0 $0 $3,400,000 Total $298,200 $1,700,000 $1,700,000 $0 $0 $0 $3,698,200 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-3 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-4 AIRPORTS Description: Project development for construction of a 4000' x 100' general aviation runway needed to assist with increased demand to the main primary runway. The parallel runway would permit smaller general aviation aircraft and flight training activities to operate without impacting the flights from critical operators, such as scheduled passenger and cargo aircraft, passenger charters, aerial firefighting and air medical. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Redding Municipal Airport CIP Costs(detailed below) $4,800,000 Total Project Cost: $4,800.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Airport Grant Funds - Federal $0 $0 $0 $0 $453,300 $3,898,380 $4,351,680 PFC $0 $0 $0 $0 $46,700 $401,620 $448,320 Total $0 $0 $0 $0 $500,000 $4,300,000 $4,800,000 Project Development $0 $0 $0 $0 $500,000 $0 $500,000 Construction $0 $0 $0 $0 $0 $4,300,000 $4,300,000 Total $0 $0 $0 $0 $500,000 $4,300,000 $4,800,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-4 0 0 COMMUNITY SERVICES Description: Design and first -phase construction of an approximately 13 -acre park site in the SW quadrant that will include playing fields, playgrounds, basketball courts, shaded picnic areas, trail connections to adjacent public open -space areas, parking, and restrooms. Planned to be constructed under a development agreement. 2018-19 Location: SW Quadrant, off Placer Road 2020-21 Total Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development $300,000 $1,100,000 CIP Costs(detailed below) $1,750,000 $1,600,000 Total $50,000 Total Project Cost: $1,750,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Development Fees $0 $0 $0 $750,000 $500,000 $500,000 $1,750,000 Total $0 $0 $0 $750,000 $500,000 $500,000 $1,750,000 Project Development $0 $0 $0 $262,500 $0 $0 $262,500 Construction $0 $0 $0 $487,500 $500,000 $500,000 $1,487,500 Total $0 $0 $0 $750,000 $500,000 $500,000 $1,750,000 Project # CS -2005-21 Description: Construction on an approximately 7 -acre park site on dedicated land in the SE quadrant located in a soon-to-be developed subdivision. The project will include a multi-purpose playing field, playgrounds, shaded picnic areas, and trail connections to adjacent public open -space areas. Planned to be constructed under a development agreement. Location: SE Quadrant, Rancho Road/Shasta View Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $1,600,000 Total Project Cost: $1,600,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Development Fees $50,000 $150,000 $300,000 $1,100,000 $0 $0 $1,600,000 Total $50,000 $150,000 $300,000 $1,100,000 $0 $0 $1,600,000 Project Development $50,000 $150,000 $40,000 $0 $0 $0 $240,000 Construction $0 $0 $260,000 $1,100,000 $0 $0 $1,360,000 Total $50,000 $150,000 $300,000 $1,100,000 $0 $0 $1,600,000 Bel -Air Park Development Project # CS -2005-23 Description: First phase construction of an approximately 7.3 -acre park site on dedicated land in the NW quadrant in a subdivision now under construction. This project will include play equipment, open turf areas, shaded picnic tables, and trails. Planned to be constructed under a development agreement. Location: NW Quadrant Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $500,000 Total Project Cost: $500.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Development Fees $0 $250,000 $250,000 $0 $0 $0 $500,000 Total $0 $250,000 $250,000 $0 $0 $0 $500,000 Project Development $0 $75,000 $0 $0 $0 $0 $75,000 Construction $0 $175,000 $250,000 $0 $0 $0 $425,000 Total $0 $250,000 $250,000 $0 $0 $0 $500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-5 0 • COMMUNITY SERVICES Description: Final phase construction of an approximately 6 -acre park site on dedicated land in the NE quadrant located in a subdivision now under construction. First phase included play equipment, shaded picnic tables and restroom. Final phase will include open turf areas and trails. Planned to be constructed under a development agreement Location: NE Quadrant, near Hilltop Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $330,000 Total Project Cost: $330,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Development Fees $0 $330,000 $0 $0 $0 $0 $330,000 Total $0 $330,000 $0 $0 $0 $0 $330,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $330,000 $0 $0 $0 $0 $330,000 Total $0 $330,000 $0 $0 $0 $0 $330,000 Description: Design and construction of an approximately 8 -acre park site on dedicated land in the SE quadrant located in a soon - to -be -developed subdivision. The project will include a multi-purpose playing field, playgrounds, shaded picnic areas, trail connections, and a restroom. Planned to be constructed under a development agreement. Location: SW Quadrant, off Eureka Way Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $900,000 Total Project Cost: $900,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Development Fees $0 $300,000 $300,000 $300,000 $0 $0 $900,000 Total $0 $300,000 $300,000 $300,000 $0 $0 $900,000 Project Development $0 $135,000 $0 $0 $0 $0 $135,000 Construction $0 $165,000 $300,000 $300,000 $0 $0 $765,000 Total $0 $300,000 $300,000 $300,000 $0 $0 $900,000 Softball Park Restroom $100,000 $0 $0 $0 Project # CS -2013-01 Description: The project involves the construction of a pre-engineered restroom and maintenance building located on the east side of the Redding Softball Park. The old restroom was demolished as part of the new Redding Police Building. The new restrooms will be ADA compliant. Location: SW Quadrant, adjacent to Civic Center Campus Project Cost: Prior Years/Future Costs: $9.631 Project Type: One-time Park Development CIP Costs(detailed below) $100,000 Total Project Cost: $109,631 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total CDBG $47,280 $0 $0 $0 $0 $0 $47,280 General Fund $52,720 $0 $0 $0 $0 $0 $52,720 Total $100,000 $0 $0 $0 $0 $0 $100,000 Project Development $15,000 $0 $0 $0 $0 $0 $15,000 Construction $85,000 $0 $0 $0 $0 $0 $85,000 Total $100,000 $0 $0 $0 $0 $0 $100,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-6 0 • COMMUNITY SERVICES H Description: Open space improvement of an approximately 35 -acre site including river access, kayak boat launch, natural surface walking trails, benches and picnic areas, and a small parking lot. Location: SW Quadrant near 2515 Henderson Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $890,000 Total Project Cost: $890,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Grant Funds - State $376,940 $350,000 $138,300 $0 $0 $0 $865,240 Local Donations $24,760 $0 $0 $0 $0 $0 $24,760 Total $401,700 $350,000 $138,300 $0 $0 $0 $890,000 Project Development $133,500 $0 $0 $0 $0 $0 $133,500 Construction $268,200 $350,000 $138,300 $0 $0 $0 $756,500 Total $401,700 $350,000 $138,300 $0 $0 $0 $890,000 Polk Open Space $0 $0 $0 Project # CS -2015-02 Description: Open space improvements including trails, benches and picnic areas. Location: SW Quadrant at 2480 Ellis Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $105,500 Total Project Cost: $105,500 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Grant Funds - State $105,500 $0 $0 $0 $0 $0 $105,500 Total $105,500 $0 $0 $0 $0 $0 $105,500 Project Development $15,825 $0 $0 $0 $0 $0 $15,825 Construction $89.675 $0 $0 $0 $0 $0 $89,675 Total $105,500 $0 $0 $0 $0 $0 $105,500 Martin Luther King Jr. Park Restrooms Project # CS -2015-03 Description: ADA restroom rehabilitation. Location: SW Quadrant at 1815 Sheridan Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Park Development CIP Costs(detailed below) $33,000 Total Project Cost: $33.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total CDBG $30,000 $0 $0 $0 $0 $0 $30,000 General Fund $3,000 $0 $0 $0 $0 $0 $3,000 Total $33,000 $0 $0 $0 $0 $0 $33,000 Project Development $3,000 $0 $0 $0 $0 $0 $3,000 Construction $30,000 $0 $0 $0 $0 $30,000 Total $33,000 $0 $0 $0 $0 $33,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-7 0 • COMMUNITY SERVICES Description: Construction of a 4.0 mile compacted natural surface trail connecting Palisades Avenue to the Dana to Downtown Trail and the Sacramento River Trail system, including reinforced fencing. Location: NW Quadrant near 1270 Palisades Avenue Project Cost: Prior Years/Future Costs: $71,757 Project Type: One-time Park Development CIP Costs(detailed below) $49,400 Total Project Cost: $121,157 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Park Grant Funds - State $49,400 $0 $0 $0 $0 $0 $49,400 Total $49,400 $0 $0 $0 $0 $0 $49,400 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $49,400 $0 $0 $0 $0 $0 $49,400 Total $49,400 $0 $0 $0 $0 $0 $49,400 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-8 • 0 REU Electric Utility GIS Mapping (GI Description: This project began in FY 2007-2008 to convert REU's existing linear based drawing data into an information -based system. The advantages to manipulate data along with graphical information is well established and allows greater productivity within the department and the ability to tie to the City's existing GIS system. The project involves acquiring necessary data platforms, the conversion of the existing data into GIS, and the conversion of REU's linear based drawing data into an information -based system. Location: Citywide Project Cost: Prior Years/Future Costs: $548,949 Project Type: One-time System Improvements CIP Costs(detailed below) $861,300 Total Project Cost. $1,410,249 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $430,650 $430,650 $0 $0 $0 $0 $861,300 Total $430,650 $430,650 $0 $0 $0 $0 $861,300 Units 1-3 Control System Replacement Project # REU-2007-08 Description: This project is to provide new control systems for Units 1-3 at the Redding Power Plant. The current control systems are antiquated and parts are becoming non-existent. In addition, support has been increasingly difficult to locate. Units 1-3 are required to exhibit a high level of reliability to provide critical peak load capacity as well as control area required reserves. The new control systems for these units will have increased unit monitoring inputs and provide much greater unit operating safety as well as operating efficiency. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $286,864 Project Type: One-time System Improvements CIP Costs(detailed below) $2,231.050 Total Project Cost: $2,517,914 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $2,231,050 $0 $0 $0 $0 $0 $2,231,050 Total $2,231,050 $0 $0 $0 $0 $0 $2,231,050 General Generator Upgrade Project # REU-2009-04 Description: This project is for plant automation improvements that will enhance safety, improve plant operability, and improve plant reliability at the Redding Power Plant. These improvements include the addition of valve actuators, advanced controller programming, and operator interface equipment. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $803.723 Project Type: One-time System Improvements CIP Costs(detailed below) $157,510 Total Project Cost: $961,233 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $157,510 $0 $0 $0 $0 $0 $157,510 Total $157,510 $0 $0 $0 $0 $0 $157,510 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C•9 Description: This project is for a payment kiosk at City Hall that will increase service efficiency for Utility Customers. The kiosk will expedite the payment process for customers who need to submit a payment without further assistance from a Customer Service Representative. This kiosk will also allow payments submitted to be date-stamped and posted to the customer's account on the same day and may slow the rate at which future additional staff is required. Location: 777 Cypress Avenue Project Type: Ongoing System Expansion Funding: 2015-16 Electric Rates $0 Total $0 2016-17 2017-18 2018-19 2019-20 2020-21 Total $50,000 $0 $0 $0 $0 $50,000 $50,000 $0 $0 $0 $0 $50,000 Corporation Yard Expansion Project # REU-2011-02 Description: Required to construct a distribution dispatch center for both organizational efficiencies and as mandated by FERC and NERC regulatory requirements. Location: 20055 Viking Way Project Type: Ongoing System Expansion Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric System Financing $1,100,000 $0 $0 $0 $0 $0 $1,100,000 Total $1,100,000 $0 $0 $0 $0 $0 $1,100,000 Unit 5 SCONX Improvement Project # REU-2011-03 Description: Install a steam super heater in Unit #5 SCONOX control system to facilitate the automated adjustment of the temperature of steam used in the SCONX process. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $470.000 $0 $0 $0 $0 $0 $470,000 Total $470,000 $0 $0 $0 $0 $0 $470,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015.16 TO 2020-21 PAGE C-10 0 0 REU Description: Meter reading tools and infrastructure are critical to collection of revenue for the Water and Electric Utilities. Modernizing the tools used for this purpose is necessary to hedge against the risk of not collecting consumption data and reduces the rate of increases in staffing due to growth within the Utilities service territory. Significant growth in the outlying areas of the City's service territory has resulted in imbalanced and inefficient meter reading routes and billing cycles. Long term benefits of the project include perpetual route balancing programs to ensure route sizes are maintained and controlled, minimization of overtime as a result of spreading the workload throughout the billing month, and a decrease in vehicle fleet maintenance and fuel costs. Location: Citywide Project Cost: Prior Years/Future Costs: $53,031 Project Type: One-time System Improvements CIP Costs(detailed below) $138,960 Total Project Cost: $191,991 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $138.960 $0 $0 $0 $0 $0 $138,960 Total $138,960 $0 $0 $0 $0 $0 $138,960 Asphalt Paving (Plant Resurfacing) Project # REU-2011-07 Description: Adding concrete or asphalt surfaces to areas of the plant enhances plant safety, cleanliness, and ease of operation. The safety improvement is gained by giving plant staff a better work surface for moving heavy objects. The engines will also benefit because the resurfacing will suppress dust and prevent engine fouling. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $100,000 $0 $0 $0 $0 $100,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 CT Gas Leak Detection System Project # REU-2013-03 Description: For safety of personnel and protection of equipment, gas leak equipment needs to be installed on each of the CT's. This project is a result of an OEM product service bulletin requiring the addition of natural gas detectors in the CT package. The detectors are to determine if a fuel gas leak exists. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $90,000 $0 $0 $0 $0 $90,000 Total $0 $90,000 $0 $0 $0 $0 $90,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-1 1 0 E REU Description: Unit 6 cannot run at low loads due to the emission system's reformer low steam temperature. Unit 6 was built with a reformer steam superheater (that unit 5 lacks). However, it is not effective at low engine loads. The electric steam heater will allow the plant to run at low engine loads (-5 MW) and maintain the proper reformer steam temperature that prevents EMx catalyst degradation. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $0 $108,000 $0 $0 $0 $108,000 Total $0 $0 $108,000 $0 $0 $0 $108,000 CT Unit #1 AVR Upgrade Project # REU-2013-06 Description: Replacement of obsolete Automatic Voltage Control equipment. The project is scheduled to be performed in conjunction with the control system replacement for Combustion Turbine unit #1. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $128,000 $0 $0 $0 $0 $128,000 Total $0 $128,000 $0 $0 $0 $0 $128,000 General System Improvements Project # REU-2015-01 Description: General system improvements are annual recurring distribution system capital expenditures in support of both new business and system maintenance for both new and existing customers. The facilities to be installed typically include: transformers, capacitor banks, poles, overhead and underground conductors and switches, splices/connectors, conduit, and splice boxes and vaults. Location: Citywide Project Type: Ongoing System Improvements Fundinq: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $5,972.490 $5,599.000 $8,592,000 $8,855.000 $9,116.000 $9.394,000 $47,528,490 Total $5,972,490 $5,599,000 $8,592,000 $8,855,000 $9,116,000 $9,394,000 $47,528,490 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-12 • 0 kmk Description: The paint on the peaking units (Units 1, 2, and 3) is the original paint. It is severely weathered and has been damaged over the years due to hot gas leaks. Repainting the units will not only restore the professional visual appearance but it will give plant staff a tool to see indications of potential insulation breakdown. The paint on Units 4 and 5 is severely weathered and has some damage due to hot gas leaks. Repainting the units will not only restore the professional visual appearance but it will give plant staff a tool to see indications of potential insulation breakdown. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $110.000 $90,000 $0 $0 $0 $0 $200,000 Total $110,000 $90,000 $0 $0 $0 $0 $200,000 Unit 5 Start Motor Upgrades Project # REU-2015-03 Description: The current start motors on Units 5 & 6 are no longer serviced or available. This puts the facility at risk for loss of availability in the event of a catastrophic failure of the start motor. Siemens has an upgrade design that incorporates a Siemens motor into the package. The removed motor will be stored as a spare for Unit 6. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $285.000 $0 $0 $0 $0 $0 $285,000 Total $285,000 $0 $0 $0 $0 $0 $285,000 Unit 5 Automation Upgrade Project # REU-2015-04 Description: This project is to improve plant automation to improve the operability of Unit 5. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $30,000 $30,000 $0 $0 $0 $0 $60,000 Total $30,000 $30,000 $0 $0 $0 $0 $60,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE C-1 3 REU Vibr Description: This project will add machine vibration monitoring instrumentation to the Unit 9 turbine and generator. This equipment will report data used to evaluate the machine health. Location: Paige Bar Road at Whiskeytown Dam Project Type: Ongoing System Improvements Funding: 2015-16 Electric Rates $40,000 Total $40,000 2016-17 2017-18 2018-19 2019-20 2020-21 Total $0 $0 $0 $0 $0 $40,000 $0 $0 $0 $0 $0 $40,000 50 Cuft Carbon Vessel Project # REU-2015-M Description: This project will increase the size of the carbon vessel on the SCONOx regen gas skid from 3 cuft to 50 cuft. This will match the vessel that came with the Unit 6 regen gas skid. The increase in vessel size will increase the hours between changes of the activated carbon and reduce the amount of maintenance hours to service this system. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $35.000 $0 $0 $0 $0 $0 $35,000 Total $35,000 $0 $0 $0 $0 $0 $35,000 Upstream NOx Analyzers Project # REU-2015-07 Description: Currently the peaking plant generators do not have instrumentation to measure the air pollutant NOx prior to the emissions catalyst. This measurement is very helpful in monitoring combustion efficiency and emissions catalyst efficiency. Being able to monitor this measurement is important so problems with the engine or the catalyst can possibly be caught early and avoid unit derates and potential regulatory violations. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 Electric Rates $54.000 Total $54,000 2016-17 2017-18 $0 $0 $0 $0 2018-19 2019-20 2020-21 Total $0 $0 $0 $54,000 $0 $0 $0 $54,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-14 • 9 >t W� Peaker CO Analyzer Pro Description: The CO analyzers in the CEMS on each peaking unit are not OEM supported any longer. This means that maintenance to those units are limited to our parts on hand and staff knowledge. This situation would be unacceptable as the analyzers are required by air quality regulations and our permits. Without functioning CO analyzers the peaking units would be in violation and required to be taken out of service. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $54,000 $0 $0 $0 $0 $0 $54,000 Total $54,000 $0 $0 $0 $0 $0 $54,000 Upgrade T3000 Project # REU-2015-09 Description: Siemens constantly incorporates new technology into their T3000 control system components. To maintain compatibility within the power plants controls system we will have to incorporate these improvements into the T3000 controls Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $25,000 $0 $0 $0 $0 $25,000 Total $0 $25,000 $0 $0 $0 $0 $25,000 General Plant Automation Project # REU-2015-10 Description: As technology progresses there are opportunities to improve the operability of the power plant. This project is to improve plant automation throughout the power plant site. These improvements are damper actuators, valve automation, process instrumentation, process piping, and plant equipment. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 Electric Rates $220.000 Total $220,000 2016-17 2017-18 $220,000 $0 $220,000 $0 2018-19 2019-20 2020-21 Total $0 $0 $0 $440,000 $0 $0 $0 $440,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020.21 PAGE C•15 REU Description: This project will install equipment to improve the power plant site security. This project will upgrade security systems to the power plant Administration building to incorporate requirements from NERC, Department of Homeland Security, or any site specific identified needs. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 Electric Rates $10.000 Total $10,000 2016-17 2017-18 2018-19 2019-20 2020-21 Total $5,000 $0 $0 $0 $0 $15,000 $5,000 $0 $0 $0 $0 $15,000 Project # REU-2015-12 Description: The arc flash analysis of the power plant equipment has revealed a few areas where the incident energy levels are very high. They are high enough to where there is no level of safety protection that will allow the area to be worked on while energized. Although it is much preferred to work on all equipment while de -energized, sometimes events will not make this possible. This project will modify these areas to reduce the incident energy to levels that could allow work to be performed while energized. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $75,000 $50,000 $0 $0 $0 $0 $125,000 Total $75,000 $50,000 $0 $0 $0 $0 $125,000 Gas Chromatograph 3 Description: This project will procure and install a new gas chromatograph on the natural gas pipeline that will continuously report fuelgas heating value. This value will be used in the plant CEMs and for greenhouse gas emissions data. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $60,000 $0 $0 $0 $0 $0 $60,000 Total $60,000 $0 $0 $0 $0 $0 $60,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-16 0 • REU Description: The power plant staff has begun to wash the regenerative catalyst modules onsite. This process takes specific facilities to accommodate the safety concerns, the chemical handling, module movements, and waste disposal. This project will design and install equipment and facilities to accommodate this process. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $330,000 $0 $0 $0 $0 $0 $330,000 Total $330,000 $0 $0 $0 $0 $0 $330,000 Spare Regenerative Catalyst Project # REU-2015-15 Description: Purchase regenerative catalyst so as to have enough catalyst for two shelves. This would make it possible for the power plant to swap catalyst modules on a periodic basis, possibly quarterly. This would maintain a level of catalyst capacity and prevent operating the plant until the catalyst was exhausted. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $250,000 $0 $0 $0 $0 $0 $250,000 Total $250,000 $0 $0 $0 $0 $0 $250,000 Unit 1 Fast Start Upgrade Project # REU-2015-16 Description: Unit 1 is the only peaking unit that does not have fast start capability. By completing a fuelgas flow study and installing the needed instrumentation this unit could also have fast start abilities. This would give system operations additional fast start resources. They would have a lesser load capable machine to select in the event of an energy emergency. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 Electric Rates $60.000 Total $60,000 2016-17 2017-18 $0 $0 $0 $0 2018-19 2019-20 2020-21 Total $0 $0 $0 $60,000 $0 $0 $0 $60,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015.16 TO 2020-21 PAGE C-17 0 0 REU Description: This project will replace approximately 113 of the bronze heat transfer tubes in the main steam condenser in Unit 4. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $360,000 $0 $0 $0 $0 $360,000 Total $0 $360,000 $0 $0 $0 $0 $360,000 Units 3 and 4 Protective Relay Upgrade Project # REU-2015-18 Description: This project will upgrade the protective relay equipment on Unit 3 & Unit 4. These units utilize electromechanical relays for the units protective relays. This equipment is older and requires more frequent maintenance as per PRC - 005 -2. By upgrading this equipment to a digital system it will require less maintenance. A digital system will also provide better event logging which will help the utility to diagnose problems in the event of a protective relay operation. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $180,000 $0 $0 $0 $0 $180,000 Total $0 $180,000 $0 $0 $0 $0 $180,000 Unit 4 Delta V Upgrade Project # REU-2015-19 Description: The Unit 4 control system, Delta V version 7, is obsolete and is no longer supported by Fisher Rosemont. This project will replace this system with a modern Siemens T3000 system and incorporate it into the plant control loop. The T3000 system is the system the power plant has standardized to. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 $410,000 $0 $0 $0 $0 $410,000 Total $0 $410,000 $0 $0 $0 $0 $410,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-18 • REU Upgrade Unit 6 EMX Damper Act Description: This project is to procure and install stronger damper actuators for the Unit EMX dampers. The current dampers are not quite strong enough to drive the dampers onto the seals well enough to get a good seal. As the damper is able to better seal between the fluegas and the regen gas, the regen of the catalyst will be better and give longer times between washes. Location: 17120 Clear Creek Road Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $80,000 $80,000 $0 $0 $0 $0 $160,000 Total $80,000 $80,000 $0 $0 $0 $0 $160,000 Customer Service Lobby ADA Project # REU-2015-21 Description: This request is to complete Customer Service Walk -In Center lobby upgrades in order to maintain security, enhance the customer experience and comply with the Americans with Disabilities Act. The Customer Service Walk -In Center provides bill payment and account inquiry services to more than 5,000 customers per month. Currently the interior door leading into the Walk -In Center lobby needs to be retrofitted with an automatic door opener to allow assisted access. The customer queuing system in use is not only past it's serviceable life, an upgraded system would include monitors for enhanced customer communication while customers wait for assistance in the Walk -In Center lobby. There is currently video recording at the four customer service windows. The addition of audio recording would enhance security and provide clarity for possible customer disputes. Location: 3611 Avtech Parkway Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $40,000 $0 $0 $0 $0 $0 $40,000 Total $40,000 $0 $0 $0 $0 $0 $40,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-19 0 0 REU Description: The serviceable life of the remittance equipment was estimated at 8 years from the time of purchase in 2005. This equipment includes the Remittance Processing System (RPS), Opex letter opener and crosscut shredder. It is used daily to process the approximately 220,000 utility payments received annually via the mail room. Due to the age and daily use of the equipment, it has become increasingly unreliable. In order to control costs and to sustain system reliability for the Division, it is recommended the remittance equipment be replaced. Location: 3611 Avtech Parkway Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Electric Rates $0 Total $0 $205,000 $205,000 $0 $0 $0 $0 $0 $0 $0 $0 $205,000 $205,000 Customer Seff-Service Suite Project # REU-2015-23 Description: In order to leverage new technology available and the enhanced capabilities of the upgraded utility billing system, a customer Self -Service Suite will be developed. A Self -Service Suite would allow utility customers, through a computer portal, to request services, make payment arrangements, obtain detailed account information, or conduct other transactions. This portal would also allow the City to explore paperless billing options, recurring payments or other customer payment options. A Self -Service Suite would provide customers immediate, 24-hour access to information and would no longer require contact with a Customer Service Representative via the Call Center or Walk -In Center. Location: 3611 Avtech Parkway Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 Electric Rates $0 $500,000 $0 Total $0 $500,000 $0 2018-19 2019-20 2020-21 Total $0 $0 $0 $500,000 $0 $0 $0 $500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015.16 TO 2020.21 PAGE C-20 • SOLID WASTE Building Replacement Pro Description: Replace the Household Hazardous Waste building with one that meets the modern standard for ventilation and adequate work space. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $155,000 Total Project Cost: $155,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Solid Waste Rates $155.000 $0 $0 $0 $0 $0 $155,000 Total $155,000 $0 $0 $0 $0 $0 $155,000 Project Development $23,250 $0 $0 $0 $0 $0 $23,250 Construction $131,750 $0 $0 $0 $0 $0 $131,750 Total $155,000 $0 $0 $0 $0 $0 $155,000 Transfer Station Tipping Floor Project # SW -4941-01 Description: The tipping floor is subject to use by heavy equipment and garbage trucks and wears down over time, requiring periodic resurfacing. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Solid Waste Rates $0 $200,000 $0 $0 $400,000 $0 $600,000 Total $0 $200,000 $0 $0 $400,000 $0 $600,000 Project Development $0 $30,000 $0 $0 $40,000 $0 $70,000 Construction $0 $170,000 $0 $0 $360,000 $0 $530,000 Total $0 $200,000 $0 $0 $400,000 $0 $600,000 Transfer Facility Resurface Asphalt Project # SW -4941-02 Description: The asphalt in the composting and green waste area is over 18 years old and failing due to aging and daily use by heavy equipment and trucks. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $500.000 Total Project Cost: $500,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Solid Waste Rates $0 $500,000 $0 $0 $0 $0 $500,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 Project Development $0 $50,000 $0 $0 $0 $0 $50,000 Construction $0 $450,000 $0 $0 $0 $0 $450,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-21 • SOLID WASTE Description: Slurry seal to seal and maintain the driveways within the Transfer and Recycling Facility. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Solid Waste Rates $0 $0 $0 $51,000 $0 $0 $51,000 Total $0 $0 $0 $51,000 $0 $0 $51,000 Project Development $0 $0 $0 $5,100 $0 $0 $5,100 Construction $0 $0 $0 $45,900 $0 $0 $45,900 Total $0 $0 $0 $51,000 $0 $0 $51,000 Styrofoam Densifier $550,000 $0 $0 Project # SW -4941-04 Description: A Styrofoam densifier will allow this material to be removed from the waste stream and processed/densified creating a recyclable commodity that can be sold. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $40,000 Total Project Cost: $40,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Solid Waste Rates $40.000 $0 $0 $0 $0 $0 $40,000 Total $40,000 $0 $0 $0 $0 $0 $40,000 Project Development $4,000 $0 $0 $0 $0 $0 $4,000 Construction $36,000 $0 $0 $0 $0 $0 $36,000 Total $40,000 $0 $0 $0 $0 $0 $40,000 Recycling Baler Project # SW -4941-05 Description: The recycling baler is more than 15 years old and is in need of replacement. In addition, increased tonnages processed through the baler will necessitate a larger bailing unit. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $550,000 Total Project Cost: $550,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Solid Waste Rates $0 $550,000 $0 $0 $0 $0 Total $0 $550,000 $0 $0 $0 $0 Project Development $0 $82,500 $0 $0 $0 $0 Construction $0 $467,500 $0 $0 $0 $0 Total $0 $550,000 $0 $0 $0 $0 Total $550,000 $550,000 $82,500 $467,500 $550,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-22 • G SOLID WASTE Description: The crane is used to adjust loads in the transfer trailers prior to hauling to the landfill. It is nearing the end of its design lifecycle. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Facility Improvements CIP Costs(detailed below) $80,000 Total Project Cost: $80,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Solid Waste Rates $0 $0 $0 $80,000 $0 $0 $80,000 Total $0 $0 $0 $80,000 $0 $0 $80,000 Project Development $0 $0 $0 $12,000 $0 $0 $12,000 Construction $0 $0 $0 $68,000 $0 $0 $68,000 Total $0 $0 $0 $80,000 $0 $0 $80,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-23 0 9 STORM DRAIN Description: System improvements to pipes, channels and structures. Location: Citywide Project Type: Ongoing System Improvements Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Rates $200,000 $200,000 $207,200 $214,660 $222,390 $230,400 $1.274,650 Total $200,000 $200,000 $207,200 $214,660 $222,390 $230,400 $1,274,650 Project Development $30,000 $30,000 $31,080 $32,199 $33,359 $34,560 $191,198 Construction $170,000 $170,000 $176,120 $182,461 $189,032 $195,840 $1,083,453 Total $200,000 $200,000 $207,200 $214,660 $222,390 $230,400 $1,274,650 Court/Sheridan/West Project # SD -3515-06 Description: System Improvements. Location: Court/Sheridan/West Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $350,000 Total Project Cost: $350,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Rates $52,500 $297,500 $0 $0 $0 $0 $350,000 Total $52,500 $297,500 $0 $0 $0 $0 $350,000 Project Development $52,500 $0 $0 $0 $0 $0 $52,500 Construction $0 $297,500 $0 $0 $0 $0 $297,500 Total $52,500 $297,500 $0 $0 $0 $0 $350,000 Julian/MistletoeNana/Kenco Project # SD -3515-07 Description: System Improvements. Location: Julian/Mistletoe/Yana/Kenco Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Rates $0 $0 $300,000 $0 $0 $0 $300,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 Project Development $0 $0 $45,000 Construction $0 $0 $255,000 Total $0 $0 $300,000 $0 $0 $0 $45,000 $0 $0 $0 $255,000 $0 $0 $0 $300,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-24 • 0 STORM DRAIN Description: System Improvements. Location: Oregon Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $250,000 Total Project Cost: $250,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Rates $0 $0 $0 $250,000 $0 $0 $250,000 Total $0 $0 $0 $250,000 $0 $0 $250,000 Project Development $0 $0 $0 $37,500 $0 $0 $37,500 Construction $0 $0 $0 $212,500 $0 $0 $212,500 Total $0 $0 $0 $250,000 $0 $0 $250,000 Concrete Channel at Linden/Lawrence/Templeton Project # SD -3515-09 Description: Channel Improvements. Location: Linden/Lawrence/Templeton Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $350.000 Total Project Cost: $350,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Rates $0 $0 $0 $0 $0 $350,000 $350,000 Total $0 $0 $0 $0 $0 $350,000 $350,000 Project Development $0 $0 $0 $0 $0 $52,500 $52,500 Construction $0 $0 $0 $0 $0 $297.500 $297,500 Total $0 $0 $0 $0 $0 $350,000 $350,000 Mullen Parkway Channel Improvements Project # SD -4044-04 Description: Channel improvements concurrent with new development. Location: Lakewood Drive to Mullen Parkway Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $0 $0 $0 $0 $500,000 $0 $500,000 Total $0 $0 $0 $0 $500,000 $0 $500,000 Project Development $0 $0 $0 $0 $75,000 $0 $75,000 Construction $0 $0 $0 $0 $425,000 $0 $425,000 Total $0 $0 $0 $0 $500,000 $0 $500,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-25 9 9 STORM DRAIN Linden Ditch Detention Description: Construct detention basin on city property at Linden Creek Headwater. Location: Linden Creek - 2050 Airpark Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $1,000,000 Total Project Cost: $1,000,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $0 $200,000 $800,000 $0 $0 $0 $1.000,000 Total $0 $200,000 $800,000 $0 $0 $0 $1,000,000 Project Development $0 $200,000 $0 $0 $0 $0 $200,000 Construction $0 $0 $800,000 $0 $0 $0 $800,000 Total $0 $200,000 $800,000 $0 $0 $0 $1,000,000 Victor/Canby/Hawthorne/Tanglewood Project # SD -4439-03 Description: Construct new storm drain system. Location: Victor/Canby/Hawthorne/Tanglewood Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $0 $0 $300,000 $0 $0 $0 $300,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 Project Development $0 $0 $45,000 $0 $0 $0 $45,000 Construction $0 $0 $255,000 $0 $0 $0 $255,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 Brock Drive Project # SD -4439-04 Description: Construct Detention System. Location: Brock Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $0 $0 $0 $300,000 $0 $0 $300,000 Total $0 $0 $0 $300,000 $0 $0 $300,000 Project Development $0 $0 $0 $45,000 $0 $0 $45,000 Construction $0 $0 $0 $255,000 $0 $0 $255,000 Total $0 $0 $0 $300,000 $0 $0 $300,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 20155-16 TO 2020.21 PAGE C-26 • 9 STORM DRAIN Crossfire and Tarmac Description: Construct Detention System. Location: Crossfire and Tarmac Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $250,000 Total Project Cost: $250,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $0 $0 $0 $0 $250,000 $0 $250,000 Total $0 $0 $0 $0 $250,000 $0 $250,000 Project Development $0 $0 $0 $0 $37,500 $0 $37,500 Construction $0 $0 $0 $0 $212,500 $0 $212,500 Total $0 $0 $0 $0 $250,000 $0 $250,000 Ledell Drive Project # SD -4439-06 Description: Construct Detention System. Location: Ledell Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $200,000 Total Project Cost: $200,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $200,000 $200,000 Total $0 $0 $0 $0 $0 $200,000 $200,000 Project Development $0 $0 $0 $0 $0 $30,000 $30,000 Construction $0 $0 $0 $0 $0 $170,000 $170,000 Total $0 $0 $0 $0 $0 $200,000 $200,000 Master Plan Update Project # SD -4937-01 Description: Development of a new Master Plan to address the current regulatory environment and needs of the utility. Location: Citywide Project Cost: Prior Years/Future Costs: $0 Project Type: One-time System Improvements CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Storm Drain Connection Fees $150.000 $150.000 $0 $0 $0 $0 $300,000 Total $150,000 $150,000 $0 $0 $0 $0 $300,000 Project Development $150,000 $150,000 $0 $0 $0 $0 $300,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $150,000 $150,000 $0 $0 $0 $0 $300,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-27 9 0 STREETS Churn Creek North Extension Plan Line 2015-16 Project # 2017-18 Description: Prepare traffic analysis, capacity analysis and alignment alternatives for potential extension of Churn Creek Road to Oasis. 2020-21 Total Traffic Impact Fees Location: Churn Creek Road North of SR299 Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Widening/Extension $75,000 CIP Costs(detailed below) $20,000 $750,000 $750,000 Total Project Cost: $20,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $20.000 $0 $0 $0 $0 $0 $20,000 Total $20,000 $0 $0 $0 $0 $0 $20,000 Project Development $20,000 $0 $0 $0 $0 $0 $20,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $20,000 $0 $0 $0 $0 $0 $20,000 Small Projects Project # ST -3520-01 Description: Various traffic operation and capacity improvements. Funds will be used as match for grant -funded projects or leverage for development projects. Location: Various Project Type: Ongoing Street Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $175,000 $175,000 $175,000 $175,000 $175,000 $175,000 $1.050,000 Total $175,000 $175,000 $175,000 $175,000 $175,000 $175,000 $1,050,000 Project Development $30.000 $30,000 $30,000 $30,000 $30,000 $30,000 $180,000 Construction $145,000 $145,000 $145,000 $145,000 $145,000 $145,000 $870,000 Total $175,000 $175,000 $175,000 $175,000 $175,000 $175,000 $1,050,000 Safety Projects Project # ST -3520-01-2 Description: Competitive grant -funded projects to improve safety along street right-of-way. Contingent upon grant approval from various programs. Location: Various Project Type: Ongoing Street Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $75.000 $75,000 $75,000 $75.000 $75,000 $75,000 $450,000 HSIP $750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $4.500,000 Total $825,000 $825,000 $825,000 $825,000 $825,000 $825,000 $4,950,000 Project Development $82,500 $82,500 $82,500 $82,500 $82,500 $82,500 $495,000 Construction $742,500 $742,500 $742,500 $742,500 $742,500 $742,500 $4,455,000 Total $825,000 $825,000 $825,000 $825,000 $825,000 $825,000 $4,950,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-28 s 0 STREETS Traffic Control Devices Description: Construct various traffic control devices (locations to be determined) to improve safety and to efficiently manage anticipated traffic flows. Location: To Be Determined Project Type: Ongoing Traffic Control Device Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Total $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Project Development $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $180,000 Construction $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $1,020,000 Total $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Traffic Calming Project # ST -3520-01-4 Description: Install devices to reduce speeds and cut -through traffic in residential neighborhoods Location: Various Project Type: Ongoing Street Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Local Streets and Roads Fund $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000 Total $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000 Project Development $6,000 $6,000 $6,000 $6.000 $6,000 $6,000 $36,000 Construction $34,000 $34,000 $34,000 $34,000 $34,000 $34,000 $204,000 Total $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $240,000 Bridge Mai Project # ST -3572-03 Description: Maintenance of structures including methacrylate deck treatment and erosion repairs. Location: Various Project Type: Ongoing Street Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Local Streets and Roads Fund $0 $92.160 $0 $0 $0 $0 $92,160 HBP $0 $711,340 $0 $0 $0 $0 $711,340 Total $0 $803,500 $0 $0 $0 $0 $803,500 Project Development $0 $120,450 $0 $0 $0 Construction $0 $683,050 $0 $0 $0 Total $0 $803,500 $0 $0 $0 $0 $120,450 $0 $683,050 $0 $803,500 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020.21 PAGE C-29 0 Description: Roadway surface maintenance work conducted annually on various streets. Location: Citywide Project Type: Ongoing Street Improvement Funding: 2015-16 2016-17 2017-18 Local Streets and Roads Fund $3,000,000 $2,500,000 $1,500,000 Total $3,000,000 $2,500,000 $1,500,000 Project Development $300.000 $250,000 $100,000 Construction $2,700.000 $2,250,000 $1,400,000 Total $3,000,000 $2,500,000 $1,500,000 STREETS 2018-19 2019-20 2020-21 Total $1,500,000 $1,500,000 $1,500,000 $11,500,000 $1,500,000 $1,500,000 $1,500,000 $11,500,000 $100,000 $100,000 $100,000 $950,000 $1,400,000 $1,400,000 $1.400,000 $10,550,000 $1,500,000 $1,500,000 $1,500,000 $11,500,000 Quartz Hill - Snow Lane to Terra Nova Lane Project # ST -4226-01 Description: Widen and realign Quartz Hill from Terra Nova to Market Street to include shoulders,and sidewalk on northbound side. Project dependent upon pending Active Transportation Program (ATP) grant. Location: Quartz Hill Road Project Cost: Prior Years/Future Costs: $182,330 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $3,197,000 Total Project Cost: $3,379,330 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $20.000 $0 $0 $0 $0 $0 $20,000 ATP Grant $0 $3,177,000 $0 $0 $0 $0 $3.177,000 Total $20,000 $3,177,000 $0 $0 $0 $0 $3,197,000 Project Development $20.000 $0 $0 $0 $0 $0 $20,000 Construction $0 $3,177,000 $0 $0 $0 $0 $3,177,000 Total $20,000 $3,177,000 $0 $0 $0 $0 $3,197,000 Placer Street Improvements - Pleasant to Boston Project # ST -4226-02-1 Description: Widen, AC overlay and restripe Placer Street to provide ultimate width for all modes of transportation including non - motorized improvements and lighting from Pleasant Street to Boston Avenue. Upgrade water lines. Location: Placer Street Project Cost: Prior Years/Future Costs: $312,250 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $4,445.000 Total Project Cost: $4,757,250 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $20,000 $200,000 $0 $0 $0 $0 $220,000 ATP Grant $0 $2,580,000 $0 $0 $0 $0 $2,580,000 Water Connection Fees $5,000 $160,000 $0 $0 $0 $0 $165,000 Water Rates $20.000 $640,000 $0 $0 $0 $0 $660,000 Local Streets and Roads Fund $70,000 $750,000 $0 $0 $0 $0 $820,000 Total $115,000 $4,330,000 $0 $0 $0 $0 $4,445,000 Project Development $115,000 $0 Construction $0 $4,330,000 Total $115,000 $4,330,000 $0 $0 $0 $0 $115,000 $0 $0 $0 $0 $4,330,000 $0 $0 $0 $0 $4,445,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-30 0 STREETS Description: Widen, AC overlay and restripe Placer Street to provide ultimate width for all modes of transportation including non - motorized improvements and lighting from Airpark Drive to Pleasant Street. Upgrade water lines. Location: Placer Street Project Cost: Prior Years/Future Costs: $78,050 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $2,390,000 Total Project Cost: $2,468,050 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Local Streets and Roads Fund $0 $0 $0 $0 $20,000 $200,000 $220,000 Traffic Impact Fees $0 $0 $0 $0 $30,000 $1,500,000 $1,530,000 Wastewater Connection Fees $0 $0 $0 $0 $20,000 $250,000 $270,000 Water Connection Fees $0 $0 $0 $0 $20,000 $350,000 $370,000 Total $0 $0 $0 $0 $90,000 $2,300,000 $2,390,000 Project Development $0 $0 $0 $0 $90,000 $0 $90,000 Construction $0 $0 $0 $0 $0 $2.300,000 $2,300,000 Total $0 $0 $0 $0 $90,000 $2,300,000 $2,390,000 Sidewalk Replacement Project # ST -4407-01 Description: Annual project to replace worn and/or damaged sections of existing sidewalks Location: Citywide Project Type: Ongoing Street Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Local Streets and Roads Fund $150.000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Project Development $22,500 $22,500 $22,500 $22,500 $22,500 $22,500 $135,000 Construction $127,500 $127,500 $127,500 $127,500 $127,500 $127,500 $765,000 Total $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Safe Routes to School - Bonnyview School Project # ST -4527-06 Description: Construction of curb, gutter, and sidewalk along Bidwell Road from the Bonnyview Elementary School boundary south to North Bonnyview Road and along the north side of North Bonnyview Road to East Bonnyview Road. Location: Bonnyview Lane Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $93,500 CIP Costs(detailed below) $437,590 Total Project Cost: $531,090 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total SRTS $25.000 $412,590 $0 $0 $0 $0 $437.590 Total $25,000 $412,590 $0 $0 $0 $0 $437,590 Project Development $25,000 $0 $0 $0 $0 Construction $0 $412,590 $0 $0 $0 Total $25,000 $412,590 $0 $0 $0 $0 $25,000 $0 $412,590 $0 $437,590 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-31 STREETS Description: Install ADA -accessible curb ramps at various intersections throughout the city. Location: Various Project Type: Ongoing Street Widening/Extension Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total CDBG $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 Total $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 Project Development $15,000 $15,000 $15,000 $15,000 $15,000 $15,000 $90,000 Construction $60,000 $60,000 $60,000 $60,000 $60,000 $60,000 $360,000 Total $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 East Cypress Pedestrian Improvements Project # ST -4783-04 Description: Construct an enhanced pedestrian crosswalk on Cypress Avenue near Beverly Drive including a raised concrete refuge island and solar mounted rectangular rapid -Flashing beacons. Location: Cypress Avenue Project Cost: Prior Years/Future Costs: $109,600 Project Type: One-time Street Improvement CIP Costs(detailed below) $298,000 Total Project Cost: $407,600 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HSIP $268,200 $0 $0 $0 $0 $0 $268,200 Prop 1 B Grant $29,800 $0 $0 $0 $0 $0 $29,800 Total $298,000 $0 $0 $0 $0 $0 $298,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $298.000 $0 $0 $0 $0 $0 $298,000 Total $298,000 $0 $0 $0 $0 $0 $298,000 Victor Avenue Improvements $1,246,200 $0 $0 Project # ST -4783-05 Description: The project will provide pedestrian improvements along the Victor Avenue corridor between Enterprise Park and the Churn Creek Bridge. limprovements will include additional street lighting, enhanced pedestrian crossings, roundabouts at a minimum of two intersections, and an AC pedestrian path along the west side of the road. Location: Victor Avenue Project Cost: Prior Years/Future Costs: $73,620 Project Type: One-time Street Improvement CIP Costs(detailed below) $1,500,000 Total Project Cost: $1,573,620 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HSIP $228,420 $1,121,500 $0 $0 $0 $0 $1,349,920 Traffic Impact Fees $25.380 $124,700 $0 $0 $0 $0 $150,080 Total $253,800 $1,246,200 $0 $0 $0 $0 $1,500,000 Project Development $253,800 $0 $0 $0 $0 $0 $253,800 Construction $0 $1,246,200 $0 $0 $0 $0 $1,246,200 Total $253,800 $1,246,200 $0 $0 $0 $0 $1,500,000 CITY OF REDOING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-32 STREETS Description: Widening of Oasis Road from 1-5 to Salt Creek and realignment of Twin View Blvd north and south of Oasis Road. Location: Oasis Road and Twin View Blvd Project Cost: Prior Years/Future Costs: $44,270 Project Type: One-time Street Widening/Realignment CIP Costs(detailed below) $5,400,000 Total Project Cost: $5,444,270 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total North Redding Traffic Benefit $700,000 $4,700,000 $0 $0 $0 $0 $5,400,000 District Total $700,000 $4,700,000 $0 $0 $0 $0 $5,400,000 Project Development $700,000 $0 $0 $0 $0 $0 $700,000 Construction $0 $4,700,000 $0 $0 $0 $0 $4,700,000 Total $700,000 $4,700,000 $0 $0 $0 $0 $5,400,000 Old Alturas Road Bridge over Churn Creek Project # ST -4908-04 Description: Replace the bridge on Old Alturas Road over Churn Creek. Location: Old Alturas Road Project Cost: Prior Years/Future Costs: $383,445 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,771.455 Total Project Cost: $3,154,900 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HBP $200.078 $2,253,491 $0 $0 $0 $0 $2,453,569 Traffic Impact Fees $25,922 $291,964 $0 $0 $0 $0 $317,886 Total $226,000 $2,545,455 $0 $0 $0 $0 $2,771,455 Project Development $226,000 $0 $0 $0 $0 $0 $226,000 Construction $0 $2,545,455 $0 $0 $0 $0 $2,545.455 Total $226,000 $2,545,455 $0 $0 $0 $0 $2,771,455 Sacramento Drive Bridge over Olney Creek Project # ST -4908-05 Description: Replace the bridge on Sacramento Drive over Olney Creek. Location: Sacramento Drive Project Cost: Prior Years/Future Costs: $140.372 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,542,628 Total Project Cost: $2,683,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HBP $300,000 $129,628 $63,000 $0 $2,050,000 $0 $2,542,628 Total $300,000 $129,628 $63,000 $0 $2,050,000 $0 $2,542,628 Project Development $300,000 $129,628 $63,000 $0 $0 $0 $492,628 Construction $0 $0 $0 $0 $2,050,000 $0 $2,050,000 Total $300,000 $129,628 $63,000 $0 $2,050,000 $0 $2,542,628 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C•33 STREETS Girvan Road Bridge o Description: Replace the bridge on Girvan Road over Olney Creek. Location: Girvan Road Project Cost: Prior Years/Future Costs: $63,927 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,666,073 Total Project Cost: $2,730,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Traffic Impact Fees $6,432 $37,851 $5,964 $0 $0 $255,552 $305,799 HBP $49,641 $292,149 $46,036 $0 $0 $1,972,448 $2,360,274 Total $56,073 $330,000 $52,000 $0 $0 $2,228,000 $2,666,073 Project Development $56,073 $330,000 $52,000 $0 $0 $0 $438,073 Construction $0 $0 $0 $0 $0 $2,228,000 $2,228,000 Total $56,073 $330,000 $52,000 $0 $0 $2,228,000 $2,666,073 Eastside Road Bridge over Olney Creek $0 $0 Project # ST -4908-10 Description: Replace the bridge on Eastside Road over Olney Creek. $1,547,000 Total $198,220 Location: Eastside Road $68,000 $0 Project Cost: Prior Years/Future Costs: $40,631 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,013,220 Total Project Cost: $2,053,851 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HBP $175,484 $177,060 $60,200 $0 $1,369,559 $0 $1,782,303 Traffic Impact Fees $22,736 $22,940 $7,800 $0 $177,441 $0 $230,917 Total $198,220 $200,000 $68,000 $0 $1,547,000 $0 $2,013,220 Project Development $198.220 $200,000 $68.000 $0 $0 $0 $466,220 Construction $0 $0 $0 $0 $1,547,000 $0 $1,547,000 Total $198,220 $200,000 $68,000 $0 $1,547,000 $0 $2,013,220 Sharon Avenue Bridge over ACID Project # ST -4908-11 Description: Replace the bridge on Sharon Avenue over the ACID canal. Location: Sharon Avenue Project Cost: Prior Years/Future Costs: $38,483 Project Type: One-time Street Improvement CIP Costs(detailed below) $1,017,523 Total Project Cost: $1,056.006 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HBP $200,000 $56,523 $36,000 $0 $725,000 $0 $1,017,523 Total $200,000 $56,523 $36,000 $0 $725,000 $0 $1,017,523 Project Development $200.000 $56,523 $36,000 $0 $0 $0 $292,523 Construction $0 $0 $0 $0 $725,000 $0 $725,000 Total $200,000 $56,523 $36,000 $0 $725,000 $0 $1,017,523 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-34 STREETS Churn Creek Road Widening Projec Description: Widen Churn Creek Road between Bodenhamer Blvd. and Churn Creek to provide standard shoulders and median space between lanes. Location: Churn Creek Road Project Cost: Prior Years/Future Costs: $85,850 Project Type: One-time Street Improvement CIP Costs(detailed below) $650,000 Total Project Cost: $735,850 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HSIP $585,000 $0 $0 $0 $0 $0 $585,000 Traffic Impact Fees $65,000 $0 $0 $0 $0 $0 $65,000 Total $650,000 $0 $0 $0 $0 $0 $650,000 Project Development $97,500 $0 $0 $0 $0 $0 $97,500 Construction $552,500 $0 $0 $0 $0 $0 $552,500 Total $650,000 $0 $0 $0 $0 $0 $650,000 Old Oregon Trail Widening Project # ST -4956-04 Description: Widen and realign Old Oregon Trail from Paso Robles to Bear Mountain Road. Location: Old Oregon Trail Project Cost: Prior Years/Future Costs: $76,792 Project Type: One-time Street Improvement CIP Costs(detailed below) $1,888,300 Total Project Cost: $1,965,092 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total HSIP $234.500 $1,265,300 $0 $0 $0 $0 $1,499,800 Traffic Impact Fees $60.600 $327,900 $0 $0 $0 $0 $388,500 Total $295,100 $1,593,200 $0 $0 $0 $0 $1,888,300 Project Development $295,100 $0 $0 $0 $0 $0 $295,100 Construction $0 $1,593,200 $0 $0 $0 $0 $1,593,200 Total $295,100 $1,593,200 $0 $0 $0 $0 $1,888,300 Diestelhorst to Downtown Project # ST -4956-05 Description: Provide separate non -motorized facilities between the Diestelhorst Bridge to downtown Redding via Riverside Drive and Center Street. Project dependent upon Active Transportation Program (ATP) grant. Location: Riverside Drive and Center Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Improvement CIP Costs(detailed below) $2,637,942 Total Project Cost: $2,637.942 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total ATP Grant $0 $503,918 $1,634,024 $0 $0 $0 $2,137,942 Local Streets and Roads Fund $0 $0 $100,000 $0 $0 $0 $100,000 STIP $0 $0 $400,000 $0 $0 $0 $400,000 Total $0 $503,918 $2,134,024 $0 $0 $0 $2,637,942 Project Development $0 $503,918 $0 $0 $0 $0 $503,918 Construction $0 $0 $2,134,024 $0 $0 $0 $2,134,024 Total $0 $503,918 $2,134,024 $0 $0 $0 $2,637,942 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE C-35 STREETS Description: Widen Airport Road for additional capacity and operational safety. Location: Airport Road Corridor Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Street Widening/Extension CIP Costs(detailed below) $2,200.000 Total Project Cost: $2,200,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Shastec $0 $0 $200,000 $2.000,000 $0 $0 $2,200,000 Total $0 $0 $200,000 $2,000,000 $0 $0 $2,200,000 Project Development $0 $0 $200,000 $0 $0 Construction $0 $0 $0 $2,000,000 $0 Total $0 $0 $200,000 $2,000,000 $0 $0 $200,000 $0 $2,000,000 $0 $2,200,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-36 10 WASTEWATER infl Description: Repair and rehabilitation of various aging sewer mains throughout the City as needed to reduce rainwater intrusion into the sewer system. Location: Citywide Project Type: Ongoing Collection System Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $1,884.300 $1,170,600 $1,208,060 $1,246,720 $1,286,620 $1,327,800 $8,124,100 Total $1,884,300 $1,170,600 $1,208,060 $1,246,720 $1,286,620 $1,327,800 $8,124,100 Project Development $282,645 $175,590 $181,209 $187,008 $192,993 $199,170 $1,218,615 Construction $1,601.655 $995,010 $1,026,851 $1,059,712 $1.093,627 $1,128,630 $6,905,485 Total $1,884,300 $1,170,600 $1,208,060 $1,246,720 $1,286,620 $1,327,800 $8,124,100 Westside interceptor - Phase III Project # WW4086-02 Description: Expansion of the main sewer serving the west region of the City to accommodate growth. Phase III will run from Girvan Road south to the Clear Creek Wastewater Treatment Plant. Location: Girvan Road to the Clear Creek WWTP Project Cost: Prior Years/Future Costs: $70,410 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $2,635,130 Total Project Cost: $2,705,540 Funding: 2015-16 2016-17 Wastewater Rates $130,000 $1,131,250 Total $130,000 $1,131,250 Project Development $130,000 $0 Construction $0 $1,131,250 Total $130,000 $1,131,250 2017-18 2018-19 2019-20 2020-21 Total $1,373,880 $0 $0 $0 $2.635,130 $1,373,880 $0 $0 $0 $2,635,130 $0 $0 $0 $0 $130,000 $1,373,880 $0 $0 $0 $2,505,130 $1,373,880 $0 $0 $0 $2,635,130 Repair/Replace Sewer Lines Project # WW -4203-02 Description: Replace aging and damaged clay piping throughout the city. Location: Various Project Type: Ongoing Collection System Improvement Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $1,763,280 $1,819,810 $1,877,890 $4,411,100 $5,902,260 $7.789,450 $23.563,790 Total $1,763,280 $1,819,810 $1,877,890 $4,411,100 $5,902,260 $7,789,450 $23,563,790 Project Development $264,492 $272,972 $281,684 $661,665 $885,339 $1,168,418 $3,534,569 Construction $1,498.788 $1,546,839 $1,596,207 $3,749,435 $5,016,921 $6,621,033 $20,029,222 Total $1,763,280 $1,819,810 $1,877,890 $4,411,100 $5,902,260 $7,789,450 $23,563,790 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-37 WASTEWATER Description: Replace lift station with larger facility. Demand exceeds capacity. Location: Boston Avenue Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $478,190 Total Project Cost: $478,190 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $478,190 $0 $0 $0 $0 $478,190 Total $0 $478,190 $0 $0 $0 $0 $478,190 Project Development $0 $71,729 $0 $0 $0 $0 $71,729 Construction $0 $406,462 $0 $0 $0 $0 $406,462 Total $0 $478,190 $0 $0 $0 $0 $478,190 Hartnell Lift Station Expansion Project # WW -LS -CC -02 Description: Increase capacity. Location: Hartnell Avenue west of Bechelli Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $141,340 Total Project Cost: $141,340 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Connection Fees $0 $0 $141,340 $0 $0 $0 $141,340 Total $0 $0 $141,340 $0 $0 $0 $141,340 Project Development $0 $0 $21,201 $0 $0 $0 $21,201 Construction $0 $0 $120,139 $0 $0 $0 $120,139 Total $0 $0 $141,340 $0 $0 $0 $141,340 North Market Lift Station Project # WIN -LS -CC -04 Description: Increase capacity. Location: Traveled Way Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $142,550 Total Project Cost: $142,550 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Connection Fees $0 $0 $134,000 $0 $0 $0 $134,000 Wastewater Rates $0 $0 $8,550 $0 $0 $0 $8,550 Total $0 $0 $142,550 $0 $0 $0 $142,550 Project Development $0 $0 $21,200 $0 $0 $0 $21,200 Construction $0 $0 $121,350 $0 $0 $0 $121,350 Total $0 $0 $142,550 $0 $0 $0 $142,550 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-38 0 Description: Increase capacity of 3,600 ft. of sewer interceptor. Location: Lake Redding Estates Project Type: One-time Collection System Improvement 101 WASTEWATER Project Cost: Prior Years/Future Costs: $85,000 CIP Costs(detailed below) $2,610,400 Total Project Cost: $2,695,400 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Connection Fees $238,850 $1,353,490 $0 $0 $0 $0 $1.592,340 Wastewater Rates $152,710 $865,350 $0 $0 $0 $0 $1,018,060 Total $391,560 $2,218,840 $0 $0 $0 $0 $2,610,400 Project Development $391,560 $0 $0 $0 $0 $0 $391,560 Construction $0 $2,218,840 $0 $0 $0 $0 $2,218,840 Total $391,560 $2,218,840 $0 $0 $0 $0 $2,610,400 Lake Redding Interceptor II Project # WW -P -CC -01-2 Description: Increase capacity of sewer interceptor. Location: Lake Redding Estates Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $2,779.035 Total Project Cost: $2,779,035 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $1,083,824 $0 $0 $0 $0 $1,083,824 Wastewater Rates $0 $1,695,211 $0 $0 $0 $0 $1,695,211 Total $0 $2,779,035 $0 $0 $0 $0 $2,779,035 Project Development $0 $416,855 $0 $0 $0 $0 $416,855 Construction $0 $2,362,180 $0 $0 $0 $0 $2,362,180 Total $0 $2,779,035 $0 $0 $0 $0 $2,779,035 Cumberland Drive Project # WW -P -CC -02 Description: Replace approximately 1,800 ft. of undersized pipe. Location: Cumberland Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $665,608 Total Project Cost: $665.608 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $665,608 $0 $0 $0 $665,608 Total $0 $0 $665,608 $0 $0 $0 $665,608 Project Development $0 $0 $99,841 Construction $0 $0 $565,767 Total $0 $0 $665,608 $0 $0 $0 $99,841 $0 $0 $0 $565,767 $0 $0 $0 $665,608 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C•39 0 Description: Replace approximately 750 ft. of undersized pipe. Location: Cypress Avenue near Churn Creek Rd Project Type: One-time Collection System Improvement U WASTEWATER Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $269,238 Total Project Cost: $269,238 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $269,238 $0 $0 $0 $0 $269,238 Total $0 $269,238 $0 $0 $0 $0 $269,238 Project Development $0 $40,386 $0 $0 $0 $0 $40,386 Construction $0 $228,852 $0 $0 $0 $0 $228,852 Total $0 $269,238 $0 $0 $0 $0 $269,238 Canby Bypass Phase 1 $0 $0 $437,804 Project # WW -P -CC -06 Description: Replace approximately 1.200 ft. of undersized pipe. $515,064 $0 $0 $0 Location: Middleton Lane South of Hartnell $515,064 Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $515,064 Total Project Cost: $515,064 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $515,064 $0 $0 $0 $0 $515,064 Total $0 $515,064 $0 $0 $0 $0 $515,064 Project Development $0 $77,260 $0 $0 $0 $0 $77,260 Construction $0 $437,804 $0 $0 $0 $0 $437,804 Total $0 $515,064 $0 $0 $0 $0 $515,064 Bechelli Lane South Project # WW -P -CC -11 Description: Replace approximately 100 ft. of undersized pipe. Location: Intersection of Bechelli and Hartnell Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $157,084 Total Project Cost: $157,084 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $0 $157,084 $0 $0 $157,084 Total $0 $0 $0 $157,084 $0 $0 $157,084 Project Development $0 $0 $0 $23,563 $0 $0 $23,563 Construction $0 $0 $0 $133,521 $0 $0 $133,521 Total $0 $0 $0 $157,084 $0 $0 $157,084 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-40 WASTEWATER Description: Replace approximately 817 feet of 6 -inch diameter VCP pipe. Location: Azalea Ave/1-5 Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $728,220 Total Project Cost: $728,220 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $0 $0 $728,220 $0 $728,220 Total $0 $0 $0 $0 $728,220 $0 $728,220 Project Development $0 $0 $0 $0 $109,233 $0 $109,233 Construction $0 $0 $0 $0 $618,987 $0 $618,987 Total $0 $0 $0 $0 $728,220 $0 $728,220 Hilltop Drive Project # WW -P -CC -19-29 Description: Replace approximately 1,900 ft, of deteriorated pipe on east side of Hilltop Drive behind buildings. Location: Hilltop Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $1,026,206 Total Project Cost: $1,026,206 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $1,026,206 $0 $0 $0 $0 $0 $1,026,206 Total $1,026,206 $0 $0 $0 $0 $0 $1,026,206 Project Development $153,931 $0 $0 $0 $0 $0 $153,931 Construction $872,275 $0 $0 $0 $0 $0 $872,275 Total $1,026,206 $0 $0 $0 $0 $0 $1,026,206 San Francisco Street Project # WW -P -CC -21-22 Description: Replace approximately 18,600 ft. of deteriorated pipe. Location: San Francisco Street Project Cost: Prior Years/Future Costs: $236.070 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $4,480,070 Total Project Cost: $4,716,140 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Connection Fees $1,871,834 $0 $0 $0 $0 $0 $1,871,834 Wastewater Rates $2,608,236 $0 $0 $0 $0 $0 $2.608,236 Total $4,480,070 $0 $0 $0 $0 $0 $4,480,070 Project Development $289,804 $0 $0 $0 $0 Construction $2,608.236 $0 $0 $0 $0 Total $2,898,040 $0 $0 $0 $0 $0 $289,804 $0 $2.608,236 $0 $2,898,040 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-41 WASTEWATER Loma Street Alley Description: Replace approximately 1,850 ft. of deteriorated pipe. Location: Between Loma Street and Market Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $563,060 Total Project Cost: $563,060 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $563,060 $0 $0 $0 $0 $563,060 Total $0 $563,060 $0 $0 $0 $0 $563,060 Project Development $0 $84,459 $0 $0 $0 $0 $84,459 Construction $0 $478,601 $0 $0 $0 $0 $478,601 Total $0 $563,060 $0 $0 $0 $0 $563,060 Manzanita Drive $0 $0 $0 $0 Project # WW -P -CC -25 Description: Replace approximately 400 ft. of deteriorated pipe. Location: Manzanita Drive west of Churn Creek Rd Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $124,200 Total Project Cost: $124,200 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $124,200 $0 $0 $0 $0 $124,200 Total $0 $124,200 $0 $0 $0 $0 $124,200 Project Development $0 $18,630 $0 $0 $0 $0 $18,630 Construction $0 $105,570 $0 $0 $0 $0 $105,570 Total $0 $124,200 $0 $0 $0 $0 $124,200 Hallmark Drive Alley Project # WW -P -CC -26 Description: Replace approximately 2,400 ft. of deteriorated pipe. Location: Between Hallmark and Sun River Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $739,296 Total Project Cost: $739,296 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $739,296 $0 $0 $0 $739,296 Total $0 $0 $739,296 $0 $0 $0 $739,296 Project Development $0 $0 $110,894 $0 $0 $0 $110,894 Construction $0 $0 $628,402 $0 $0 $0 $628,402 Total $0 $0 $739,296 $0 $0 $0 $739,296 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 201 5-1 6 TO 2020-21 PAGE C-42 • Description: Replace approximately 1,150 ft. of deteriorated pipe. Location: Between Redbud and Hallmark Project Type: One-time Collection System Improvement G WASTEWATER Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $361,192 Total Project Cost: $361,192 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $361,192 $0 $0 $0 $361,192 Total $0 $0 $361,192 $0 $0 $0 $361,192 Project Development $0 $0 $54,179 $0 $0 $0 $54,179 Construction $0 $0 $307,013 $0 $0 $0 $307,013 Total $0 $0 $361,192 $0 $0 $0 $361,192 Woodacre Drive $0 $0 $0 $0 Project # WW -P -CC -28 Description: Replace approximately 1,400 ft. of old pipe constructed at substandard grade. Location: Woodacre Drive and Bechelli Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $512,394 Total Project Cost: $512,394 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $0 $512,394 $0 $0 $512,394 Total $0 $0 $0 $512,394 $0 $0 $512,394 Project Development $0 $0 $0 $76,859 $0 $0 $76,859 Construction $0 $0 $0 $435.535 $0 $0 $435.535 Total $0 $0 $0 $512,394 $0 $0 $512,394 Churn Creek Road $0 $0 $0 $0 Project # WW -P -CC -31 Description: Replace approximately 550 ft. of old pipe constructed at substandard grade. Location: Churn Creek Road near Enterprise High School Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $202,514 Total Project Cost: $202,514 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $202,514 $0 $0 $0 $0 $202,514 Total $0 $202,514 $0 $0 $0 $0 $202,514 Project Development $0 $30,377 $0 $0 $0 $0 $30,377 Construction $0 $172,137 $0 $0 $0 $0 $172,137 Total $0 $202,514 $0 $0 $0 $0 $202,514 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-43 WASTEWATER Description: Replace approximately 1,670 feet of existing 8 -inch diameter AC pipe with 12 -inch diameter pipe. Location: Mercury Drive Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $662,600 Total Project Cost: $662,600 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $0 $0 $662,600 $0 $662,600 Total $0 $0 $0 $0 $662,600 $0 $662,600 Project Development $0 $0 $0 $0 $99,390 $0 $99,390 Construction $0 $0 $0 $0 $563,210 $0 $563,210 Total $0 $0 $0 $0 $662,600 $0 $662,600 Oasis Road $0 $0 $0 $0 Project # WW -P -S-01 Description: Replace approximately 1,200 ft. of undersized pipe. Location: Oasis Road Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $414,290 Total Project Cost: $414,290 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Connection Fees $0 $273,431 $0 $0 $0 $0 $273,431 Wastewater Rates $0 $140,859 $0 $0 $0 $0 $140,859 Total $0 $414,290 $0 $0 $0 $0 $414,290 Project Development $0 $62,144 $0 $0 $0 $0 $62,144 Construction $0 $352,147 $0 $0 $0 $0 $352,147 Total $0 $414,290 $0 $0 $0 $0 $414,290 Patterson Court Project # WW -P -S-08 Description: Replace approximately 530 ft. of deteriorated pipe. Location: Open Space east of Patterson Ct Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $264,300 Total Project Cost: $264,300 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $0 $0 $264,300 $0 $0 $264,300 Total $0 $0 $0 $264,300 $0 $0 $264,300 Project Development $0 $0 $0 $39,645 $0 $0 $39,645 Construction $0 $0 $0 $224,655 $0 $0 $224,655 Total $0 $0 $0 $264,300 $0 $0 $264,300 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-44 WASTEWATER Boneset Street Description: Replace approximately 500 ft. of deteriorated pipe. Location: Boneset Street Project Cost: Prior Years/Future Costs. $0 Project Type: One-time Collection System Improvement CIP Costs(detailed below) $167,200 Total Project Cost: $167,200 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $167,200 $0 $0 $0 $0 $0 $167,200 Total $167,200 $0 $0 $0 $0 $0 $167,200 Project Development $25,080 $0 $0 $0 $0 $0 $25,080 Construction $142,120 $0 $0 $0 $0 $0 $142,120 Total $167,200 $0 $0 $0 $0 $0 $167,200 Clear Creek WWTP Levee Project # WW -TP -CC -01 Description: Preliminary engineering for protection on Sacramento River side of CCWWTP Levee. Location: 2220 Metz Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Treatment Plant Improvement CIP Costs(detailed below) $200.000 Total Project Cost: $200.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Wastewater Rates $0 $200,000 $0 $0 $0 $0 $200,000 Total $0 $200,000 $0 $0 $0 $0 $200,000 Project Development $0 $200,000 $0 $0 $0 $0 $200,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $200,000 $0 $0 $0 $0 $200,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-45 WATER Description: Rehab/repair pump stations. Location: Various Project Type: Ongoing Treatment System Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $287,098 $147,000 $152,426 $158,053 $163,886 $169,936 $1,078,399 Total $287,098 $147,000 $152,426 $158,053 $163,886 $169,936 $1,078,399 Project Development $43,065 $22,050 $22,864 $23,708 $24,583 $25,490 $161,760 Construction $244,033 $124,950 $129,562 $134,345 $139,303 $144,446 $916,639 Total $287,098 $147,000 $152,426 $158,053 $163,886 $169,936 $1,078,399 Pump House 1 Replacement Environmental $0 $0 Project # W-3020-04 Description: Replace obsolete Pump House 1. $0 $0 $0 $0 $0 Location: South side of the Sacramento River approximately Project Cost: Prior Years/Future Costs: $0 1500 ft upstream of Diestelhorst Bridge $0 $0 $0 $2,278,793 Project Type: One-time Treatment System CIP Costs(detailed below) $1,500,000 Total Project Cost: $1,500.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Total $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Project Development $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Twin View 16" Extension - Oasis to Caterpillar Project # W-4285-04 Description: Project development. Location: Twin View Boulevard Project Cost: Prior Years/Future Costs: $113,557 Project Type: One-time Distribution System CIP Costs(detailed below) $2,278,793 Total Project Cost: $2,392,350 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Connection Fees $37,703 $645,935 $0 $0 $0 $0 $683,638 Water Rates $87,975 $1,507,180 $0 $0 $0 $0 $1,595,155 Total $125,678 $2,153,115 $0 $0 $0 $0 $2,278,793 Project Development $125,678 $0 $0 $0 $0 $0 $125,678 Construction $0 $2,153,115 $0 $0 $0 $0 $2,153,115 Total $125,678 $2,153,115 $0 $0 $0 $0 $2,278,793 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-46 E • Description: Replace cast-iron, steel, asbestos, galvanized and degraded water mains throughout the City. Location: Citywide Project Type: Ongoing Distribution System Funding: 2015-16 2016-17 Water Rates $1,760,000 $1,825,000 Total $1,760,000 $1,825,000 Project Development $264,000 $273,750 Construction $1,496,000 $1,551,250 Total $1,760,000 $1,825,000 2017-18 2018-19 2019-20 $1,892,363 $1,962,212 $2,034,640 $1,892,363 $1,962,212 $2,034,640 $283,854 $294,332 $305,196 $1,608,509 $1,667,880 $1,729,444 $1,892,363 $1,962,212 $2,034,640 WATER 2020-21 Total $2,109,741 $11,583,956 $2,109,741 $11,583,956 $316,461 $1,737,593 $1,793,280 $9,846,363 $2,109,741 $11,583,956 Magnolia Area Waterline Project # W-4286-02 Description: Replace approximately 11,000 ft. of deteriorated 8 -inch water main and add 19 fire hydrants. Location: Areas on both sides of Placer Street near Magnolia Project Cost: Prior Years/Future Costs: $182,070 Avenue Project Type: One-time Distribution System CIP Costs(detailed below) $2,107,170 Total Project Cost: $2,289,240 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $2,107,170 $0 $0 $0 $0 $0 $2,107,170 Total $2,107,170 $0 $0 $0 $0 $0 $2,107,170 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $2,107,170 $0 $0 $0 $0 $0 $2,107.170 Total $2,107,170 $0 $0 $0 $0 $0 $2,107,170 Buckeye Area Water Main Project # W-4286-03 Description: Replace approximately 5,000 feet of deteriorated 8 -inch water main. Location: Lake Boulevard area neat the City of Shasta Lake Project Cost: Prior Years/Future Costs: $4,241 Boundary Project Type: One-time Distribution System CIP Costs(detailed below) $995,759 Total Project Cost: $1,000,000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $995.759 $0 $0 $0 $0 $0 $995,759 Total $995,759 $0 $0 $0 $0 $0 $995,759 Project Development $95,000 $0 $0 $0 $0 Construction $900,759 $0 $0 $0 $0 Total $995,759 $0 $0 $0 $0 $0 $95,000 $0 $900,759 $0 $995,759 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-47 • 0 WATER Description: Inspect, rehab, and clean casing and screens to maintain production capacity. Location: Various Project Type: Ongoing Treatment System Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $1,311,171 $178,000 $60,141 $204,571 $64,663 $209,259 $2,027,805 Total $1,311,171 $178,000 $60,141 $204,571 $64,663 $209,259 $2,027,805 Project Development $196,676 $26,700 $9,021 $30,686 $9,699 $31,389 $304,171 Construction $1,114,495 $151,300 $51,120 $173,885 $54,964 $177,870 $1,723,634 Total $1,311,171 $178,000 $60,141 $204,571 $64,663 $209,259 $2,027,805 Well Head Treatment System Project # Project # W-4338-04 Description: Enterprise well water quality improvements. Study and implementation of sequestering agents distribution system flushing and loading to reduce iron, manganese and arsenic levels during the next five years. Other major well head treatment improvements postponed pending identification of funding. Location: Enterprise Wells Project Cost: Prior Years/Future Costs: $78,580 Project Type: One-time Treatment System CIP Costs(detailed below) $1,905,400 Total Project Cost: $1,983,980 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $1,905,400 $0 $0 $0 $0 $0 $1,905,400 Total $1,905,400 $0 $0 $0 $0 $0 $1,905,400 Project Development $150.000 $0 $0 $0 $0 $0 $150,000 Construction $1,755,400 $0 $0 $0 $0 $0 $1,755,400 Total $1,905,400 $0 $0 $0 $0 $0 $1,905,400 Foothill Water Treatment Plant Maintenance Project # W-4492-01 Description: Upgrades at the Foothill Water Treatment Plant to accommodate growth and replace aging equipment Location: 3100 Foothill Boulevard Project Type: Ongoing Treatment System Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $4,798,367 $800,000 $829,529 $860,148 $891,897 $924,818 $9,104,759 Total $4,798,367 $800,000 $829,529 $860,148 $891,897 $924,818 $9,104,759 Project Development $719,755 $120,000 $124,429 $129.022 $133,785 $138,723 $1,365,714 Construction $4,078,612 $680,000 $705,100 $731,126 $758,112 $786,095 $7,739,045 Total $4,798,367 $800,000 $829,529 $860,148 $891,897 $924,818 $9,104,759 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-48 WATER Description: Various maintenance projects at the Buckeye and Foothill Water Treatment Plants. Location: 11501 Benson Drive/3100 Foothill Boulevard Project Type: Ongoing Treatment System Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $250,000 $105,000 $108,876 $112,894 $117,061 $121,382 $815,213 Total $250,000 $105,000 $108,876 $112,894 $117,061 $121,382 $815,213 Project Development $37,500 $15,750 $16,331 $16,934 $17,559 $18,207 $122,282 Construction $212,500 $89,250 $92,545 $95,960 $99,502 $103,175 $692,931 Total $250,000 $105,000 $108,876 $112,894 $117,061 $121,382 $815,213 South Bonnyview Bridge Pipe Realignment Project # W-4733-02 Description: Replace pipes with joint dislocation, new fittings at abutments, and new hangers. Location: South Bonnyview Bridge over Sacramento River Project Cost: Prior Years/Future Costs: $303,335 Project Type: One-time Distribution System CIP Costs(detailed below) $211,660 Total Project Cost: $514,995 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $211,660 $0 $0 $0 $0 $0 $211,660 Total $211,660 $0 $0 $0 $0 $0 $211,660 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $211,660 $0 $0 $0 $0 $0 $211,660 Total $211,660 $0 $0 $0 $0 $0 $211,660 Cascade Reservoir Improvements Project # W-4792-02 Description: Rehab/repair 1 MG tank. Location: 1987 Kenyon Drive Project Cost: Prior Years/Future Costs $0 Project Type: One-time Distribution System CIP Costs(detailed below) $475,000 Total Project Cost: $475.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $75,000 $400,000 $0 $0 $0 $475,000 Total $0 $75,000 $400,000 $0 $0 $0 $475,000 Project Development $0 $75,000 $0 $0 $0 $0 $75,000 Construction $0 $0 $400.000 $0 $0 $0 $400,000 Total $0 $75,000 $400,000 $0 $0 $0 $475,000 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-49 0 Description: Determine location and construct additional reservoir. Location: West Side of Redding Project Type: One-time Distribution System WATER Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $3,211,740 Total Project Cost: $3,211,740 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $481,760 $2,729,980 $0 $0 $0 $0 $3.211,740 Total $481,760 $2,729,980 $0 $0 $0 $0 $3,211,740 Project Development $72,264 $481,760 $0 $0 $0 $0 $554,024 Construction $409,496 $2,248,220 $0 $0 $0 $0 $2,657,716 Total $481,760 $2,729,980 $0 $0 $0 $0 $3,211,740 $100,000 $0 $0 $0 $0 # W-479&" Description: Rehab and repair 3.5 MG reservoir. $0 $532,140 $4,789,260 $0 Location: 941 Springer Drive $5,321,400 Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $100,000 Total Project Cost: $100.000 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $100,000 $0 $0 $0 $0 $100,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 Project Development $0 $15,000 $0 $0 $0 $0 $15,000 Construction $0 $85,000 $0 $0 $0 $0 $85,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 Lake Boulevard Waterline Project # W-CONV-04 Description: 24" waterline Lake Boulevard - Oasis to Northpoint (9,090') Location: Lake Boulevard Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $5,321,400 Total Project Cost: $5,321,400 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $0 $407,087 $2,306,827 $0 $0 $2,713,914 Water Connection Fees $0 $0 $391,123 $2,216,363 $0 $0 $2,607,486 Total $0 $0 $798,210 $4,523,190 $0 $0 $5,321,400 Project Development $0 $0 $532,140 $0 $0 $0 $532,140 Construction $0 $0 $0 $4,789,260 $0 $0 $4,789,260 Total $0 $0 $532,140 $4,789,260 $0 $0 $5,321,400 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020.21 PAGE C-50 WATER Hill 800 w&al dlne Description: 24" waterline Hill 900 to Buenaventura Drive Location: Hill 900 Tank to Placer Project Cost: Prior Years/Future Costs: $28,127 Project Type: One-time Distribution System CIP Costs(detailed below) $923,070 Total Project Cost: $951,197 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $923.070 $0 $0 $0 $0 $0 $923,070 Total $923,070 $0 $0 $0 $0 $0 $923,070 Project Development $138,461 $0 $0 $0 $0 $0 $138,461 Construction $784,610 $0 $0 $0 $0 $0 $784,610 Total $923,070 $0 $0 $0 $0 $0 $923,070 Lake Boulevard 20" - Northpoint to Masonic Project # W-CONV-09 Description: Replace 1220' of existing waterline with 20" waterline to meet water system demands, water supply for new development, and improve fire flows. Location: Lake Boulevard Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $731,114 Total Project Cost: $731,114 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $0 $0 $0 $0 $303,562 $303,562 Water Connection Fees $0 $0 $0 $0 $0 $427,552 $427,552 Total $0 $0 $0 $0 $0 $731,114 $731,114 Project Development $0 $0 $0 $0 $0 $64,000 $64,000 Construction $0 $0 $0 $0 $0 $363,552 $363,552 Total $0 $0 $0 $0 $0 $427,552 $427,552 Twin View Waterline Phase I Project # W-CONV-13-1 Description: Replace 5600' of existing waterline with 16" waterline to meet water system demands. water supply for new development, and improve fire flows. Location: Twin View Boulevard Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $1,196,175 Total Project Cost: $1,196,175 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $358,852 $0 $0 $0 $0 $358,852 Water Connection Fees $0 $837,323 $0 $0 $0 $0 $837,323 Total $0 $1,196,175 $0 $0 $0 $0 $1,196,175 Project Development $0 $119,620 $0 $0 $0 $0 $119,620 Construction $0 $1,076,555 $0 $0 $0 $0 $1,076,555 Total $0 $1,196,175 $0 $0 $0 $0 $1,196,175 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-51 o 0 WATER Twin View Waterline Phase II Description: Construct pipe from Twin View Blvd to Caterpillar Rd crossing 1-5. Location: Twin View Boulevard Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Distribution System CIP Costs(detailed below) $1,196,175 Total Project Cost: $1,196,175 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $0 $358,852 $0 $0 $0 $358,852 Water Connection Fees $0 $0 $837.323 $0 $0 $0 $837,323 Total $0 $0 $1,196,175 $0 $0 $0 $1,196,175 Project Development $0 $0 $119,620 $0 $0 $0 $119,620 Construction $0 $0 $1,076,555 $0 $0 $0 $1,076,555 Total $0 $0 $1,196,175 $0 $0 $0 $1,196,175 Enterprise Wells - Blending Study Project # W-EWT-02 Description: Engineering cost for study and recommendations to resolve marginally high Arsenic, Manganese and Iron concentration from some of the Enterprise Wells. Location: Enterprise Well Field Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Treatment System CIP Costs(detailed below) $46.020 Total Project Cost: $46.020 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $46.020 $0 $0 $0 $0 $0 $46,020 Total $46,020 $0 $0 $0 $0 $0 $46,020 Project Development $46,020 $0 $0 $0 $0 $0 $46,020 Construction $0 $0 $0 $0 $0 $0 $0 Total $46,020 $0 $0 $0 $0 $0 $46,020 EW13 and EW14 Blending Pipeline Project # W-EWT-02.2 Description: Extension of Well head treatment to assist with marginally high concentrations of Arsenic at EW13. Location: Enterprise Well Field Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Treatment System CIP Costs(detailed below) $2,377,278 Total Project Cost: $2,377,278 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $0 $0 $0 $0 $2,377,278 $0 $2,377,278 Total $0 $0 $0 $0 $2,377,278 $0 $2,377,278 Project Development $0 $0 $0 Construction $0 $0 $0 Total $0 $0 $0 $0 $237,728 $0 $237,728 $0 $2,139,550 $0 $2,139,550 $0 $2,377,278 $0 $2,377,278 CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 To 2020-21 PAGE C-52 0 • WATER Description: Physically block portions of the well screens in layers of the aquafer that are contributing undesirable chemical constituents. Location: Enterprise Well Field Project Cost: Prior Years/Future Costs: $0 Project Type: One-time Treatment System CIP Costs(detailed below) $113,290 Total Project Cost: $113,290 Funding: 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Total Water Rates $113,290 $0 $0 $0 $0 $0 $113,290 Total $113,290 $0 $0 $0 $0 $0 $113,290 Project Development $113,290 $0 $0 $0 $0 $0 $113,290 Construction $0 $0 $0 $0 $0 $0 $0 Total $113,290 $0 $0 $0 $0 $0 $113,290 Note: The Engineering Division Cost Allocation section provides an approximation of costs for the project development and construction for projects requiring the involvement of the Engineering Division. Project development costs include preliminary engineering, environmental and permitting, right-of-way, design, consultant oversight, and bidding. Construction costs include the construction contract, contract administration, inspection, and consultant oversight. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-53 i 0 FUTURE PROJECTS CIP No. Project A-MUN-24-3 Install MITL A -BEN -22-1 East Apron Pavement Rehabilitation A-MUN-24-4 Eastside Apron Expansion A-MUN-24-1 Pavement Preservation A-MUN-22-5 Security Fencing A-MUN-22-4 Upgrade Airfield Electrical System A-MUN-22-3 All -Weather Perimeter Road A-MUN-22-2 New Aircraft Parking Apron A-MUN-22-1 Eastside Cargo Apron Expansion A -BEN -24-1 Construct 10 Unit T -Hangar A -BEN -23-1 Construct T -Hangar Taxilane A-MUN-25-1 Runway 16 Blast Pad and Taxiway H Reconstruction COMMUNITY SERVICES CIP No. Project CS -2009-12 Convention Center Facility Capital Planning CS -2005-12 Lake Boulevard Neighborhood Center and Park CS -2005-18 Whistling Park Development CS -2005-26 Rosetree Park Development CS -2005-27 Gold Hills Park Acquisition and Development CS -2005-29 Caldwell Park Enhancements CS -2009-02 Convention Center Roof Replacement CS -2009-10 Convention Center Cooling Tower CS -2009-11 Convention Center Balcony Lift System STORM DRAIN CIP No. Project SD -3515-12 Railroad Avenue Storm Drain SD -3515-11 Jan Court Storm Drain CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-54 • FUTURE PROJECTS STREETS CIP No. Project ST -2005-57 Traffic Control Device: Airport Road - Meadowview Drive ST -4908-09 Canyon Road Bridge over ACID ST -4908-08 Westside Road Bridge Over Canyon Hollow ST -4908-06 Eastside Road Bridge Over Canyon Hollow ST -2007-08 Traffic Control Device: SR44 and Shasta View Drive (WB Ramp) ST -2005-62 Traffic Control Device: Victor Avenue - EI Vista Street ST -2005-60 Canyon Creek Road Area Improvements ST -2005-51 Traffic Control Device: Hartnell Avenue - Lawrence Road ST -2005-50 Traffic Control Device: Lake Boulevard - Panorama Drive ST -2005-49 Airport Road Widening - Rancho Road to Fig Tree Lane ST -2005-48 S. Bonnyview at SR273 Grade Separation ST -2005-37 Hawley Road Widening - Collyer Drive to Churn Creek ST -2005-18 Traffic Control Device: Airport Road - Fig Tree Lane ST -2005-61 Traffic Control Device: Lake Boulevard - Santa Rosa Way WATER CIP No. Project W-EWT-05 EW 12 to EW 14 Pipeline W-4600-02 Cypress Avenue Booster Pump W -EW -01 EW11 Rehab W-EWT-03 EW14 Filtration Note: The Future Projects list includes a variety of projects that are either beyond the 5 -year window of the CIP and/or do not have all funding sources identified at this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act (Government Code 66000) compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C-55 9 ! FUTURE PROJECTS WITH IMPACT FEE COMPONENT STREETS CIP No. Project Anticipated Construction Date Funding Source ST-TIF-VC2 Victor Avenue Widening - Hartnell Ave. to Cypress Ave. 2020-21 Traffic Impact Fees ST-TIF-CC1 Churn Creek Road Widening - Browning St. to Bodenhamer Blvd. 2020-21 Traffic Impact Fees ST -TIF -RA Railroad Avenue Widening - Grandview Ave. to Schley Ave. 2023-24 Traffic Impact Fees ST-TIF-VC3 Victor Avenue Widening - Hwy 44 to Old Alturas Rd. 2024-25 Traffic Impact Fees ST -TIF -HIL Hilltop Drive Widening - River Bend Road to Browning Street 2027-28 Traffic Impact Fees ST-TIF-CC2 Churn Creek Road Roundabout - Victor Avenue and Rancho 2028-29 Traffic Impact Fees WATER Road ST -TIF -OLD Old Alturas Road - ROW and Roundabouts at Victor Avenue, 2029-30 Traffic Impact Fees Lema Road, and Edgewood Drive Construction ST-TIF-VC1 Victor Avenue Widening - Mistletoe Lane to East Cypress Avenue 2031-32 Traffic Impact Fees ST-TIF-HAR Hartnell Avenue Widening - Victor Avenue to Alta Mesa Drive 2033-34 Traffic Impact Fees ST -TIF -BE Bechelli Lane Widening - North of 3rd Street to Loma Vista Drive 2034-35 Traffic Impact Fees ST-TIF-BIX Interstate 5 Interchange Improvements at South Bonnyview Road 2034-35 Traffic Impact Fees WASTEWATER Note: The Future Projects list includes a variety of projects that are either beyond the 5 -year window of the CIP and/or do not have all funding sources identified at this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act (Government Code 66000) compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C•56 Anticipated Construction CIP No. Project Date Funding Source WW -LS -CC -7/8 Cheryl Lift Station 2021-22 Wastewater Connection Fees WW -P -CC -8/9 Sulphur Creek 2022-23 Wastewater Connection Fees WW -TP -C-3 Clear Creek WWTP Pond Upgrades 2023-24 Wastewater Connection Fees WW -P -CC -4 Buenaventura Sewer 2023-24 Wastewater Connection Fees WATER Anticipated Construction CIP No. Project Date Funding Source W-CONV-10 16" Masonic to Hilltop 2021-22 Water Connection Fees W-CONV-02 Oasis Road - UPRR to Beltline 2021-22 Water Connection Fees W-CONV-03 Oasis Road - Calexico to A6 -V1 2022-23 Water Connection Fees W-CONV-01 Beltline Road - Oasis to Mountain Lakes 2022-23 Water Connection Fees Note: The Future Projects list includes a variety of projects that are either beyond the 5 -year window of the CIP and/or do not have all funding sources identified at this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act (Government Code 66000) compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. CITY OF REDDING CAPITAL IMPROVEMENT PLAN 2015-16 TO 2020-21 PAGE C•56